Ekipmanların Etkinlik Değerlerinin Farklı Yaklaşımlar ile Karşılaştırılması ve Bir Mermer Ocağı Sahasına Uygulanması
Abstract
Keywords
Ekipman etkinliği, Mermer madenciliği, Üretim verimliliği, Toplam Ekipman Etkinliği, Üretim Ekipman Etkinliği, Maden Ekipman Üretim Etkinliği
References
- Andras, I., Nan, M.S., Kovacs, I., Cristea, D., Tomescu, L.C. (2006). Research regarding the OEE (Overall Equipment Effectiveness) assessment of the coal open pit mines production system. Annals of The University Of Petroşani. Mechanical Engineering, 8, 139-146.
- Andras, I., Nan, M.S., Kovacs, I., Cristea, D., Tomescu, L.C. (2007). Overall equipment effectiveness assessment of the open pit coal mining production system. 7th International Multidisciplinary Conference, 17-19 May, Romania, 21-28
- Brodny, J., Stecula,K., Tutak, M. (2016). Application of the TPM strategy to analyze the effectiveness of using a set of mining machines. 16th International Multidisciplinary Scientific Geoconference, SGEM, 28 June-6 July, Bulgaria, 65-72.
- Demir Şahin D, Eker H. (2024). Assessment of hazards and risks in a marble quarry. BSJ Eng Sci, 7(6): 1294-1301.
- Eker, H. (2023). Investigation of the usability of industrial mining wastes in agriculture. Front. Environ. Sci. 11:1248188. doi: 10.3389/fenvs.2023.1248188.
- Eker, H. (2024). Natural Language Processing Risk Assessment Application Developed for Marble Quarries. Appl. Sci., 14, 9045. https://doi.org/10.3390/app14199045
- Elevli, S., Elevli, B. (2010). Performance measurement of mining equipments by utilizing OEE. Acta Montanistica Slovaca, 15(2), 95-101.
- Karaabat Varol, M. (2022). Mermer ocağı ekipmanlarinin etkinliklerinin değerlendirilmesi üzerine yeni bir yaklaşım. Doktora Tezi, Fen Bilimleri Enstitüsü, Isparta.
- Lanke, A.A., Hoseinie, S.H., Ghodrati, B. (2014). Mine production index (MPI)- new method to evaluate effectiveness of mining machinery. International Journal Of Geological and Environmental Engineering, 8(11),755-759.
- Lanke, A.A., Hoseinie, S.H., Ghodrati, B. (2016). Mine production index (MPI)-extension of OEE for bottleneck detection in mining. International Journal of Mining Science and Technology, 26(5), 753-760.