İn this study, the problems in the Eti Gümüş Co. Silver Mine due to high moisture content of feed ore to
the plant are studied..The plant was designed for 6.5-7 %. moisture content However in practice the
moisture content of run of mine ore is around 15-30 % leading to considerable decrease in
performance and efficiency of crusher. For solving these problems, drying and stockpiling applied in
reducing the moisture content before feeding the high moisture run of mine ore to the plant are
investigated. The stockpiles constructed during drying and feeding them to the plant are explained in
detail. Increases in recovery depending on these applications are assessed.
Bu çalışmada, Eti Gümüş A.Ş. Gümüş Madeninde tesise beslenen cevherin, nem oranının yüksek
olmasından dolayı ortaya çıkan problemler incelenerek problemlerin çözümüne yönelik öneriler
sunulmuş ve bu önerilerin uygulamadaki sonuçları incelenmiştir. Tesisin kuruluş aşamasında cevherin
nem oranı %6,5-7' ye göre planlanmışken uygulamada %15-30 seviyelerine yükselmiş özellikle
kırıcıların verimliliğinin önemli ölçüde düşmesine neden olmuştur. Bu amaçla çalışmada ocakta üretilen
farklı nem oranlarına sahip tüvenan cevherlerin tesise beslenmeden önce nem oranının düşürülmesine
yönelik olarak uygulanan kurutma ve stoklama işlemleri irdelenmiştir. Kurutma işleminde oluşturulan
stoklar ve bu stoklardan tesisin beslenmesi ile ilgili detay bilgiler verilmiştir. Bu uygulamalara bağlı
olarak tesiste sağlanan verimlilik artışları değerlendirilmiştir.
Other ID | JA23HZ67NU |
---|---|
Journal Section | Technical Notes |
Authors | |
Publication Date | September 1, 2004 |
Submission Date | September 1, 2004 |
Published in Issue | Year 2004 Volume: 43 Issue: 3 |