Tertiary pressures during the construction of tunnel are generated by rocks which increase their volumes with physical
and chemical reactions. The main problems in supporting an underground opening where the formations mainly consist
of clay minerals with very high rate of swelling properties, are excessive pressures generated by swelling, deformation
and thus support failures.
This paper is concerned with the instability problems faced at a wince opened in claystone with high swelling capacity
for ELI Işıklar Underground Project. Mechanical properties of surrounding claystone were determined by a detailed
laboratory testing program. Support systems applied upto date were analyzed and necessary precautions that should be
taken to maintain stability are briefly presented

ELI SOMA IŞIKLAR DESANDRESİNDE KARŞILAŞILAN SORUNLAR, DENENEN TAHKİMAT ŞEKİLLERİ VE ÇÖZÜM ÖNERİLERİ

Year 1995, Volume: 34 Issue: 3, 3 - 14, 01.09.1995

Abstract

Tünellerin yapımı sırasında karşılaşılan üçüncül basınçlar çoğu kez fiziksel ve kimyasal tepkimelerle hacmi artan
kayaçlar tarafından oluşturulmaktadır. Yüksek oranda şişmeye yatkın kil minerali içeren formasyonlarda açılan
galenlerin tahkimatlarında gözlenen en önemli sorun, şişme basıncının neden olduğu ortamdaki aşın basınçlar,
deformasyonlar ve bunun sonucu tahkimat çökmeleridir.
Bu çalışmada,ELİ Işıklar Yeraltı Projesi çerçevesinde yüksek oranlarda şişme potansiyeline sahip olan killi bir birimde
açılmakta olan başaşağıda karşdaşılan problemler konu edilmiştir. Çevre kayaç olan kiltaşının mekanik özellikleri
aynntıh bir laboratuvar deney programı ile belirlenmiştir. Başaşağıda bu güne kadar kullanılmış olan tahkimat
yontemlen analız edilerek, duraylılığm sağlanabilmesi açısından yapılması gerekenler özet halinde sunulmaktadır.

There are 0 citations in total.

Details

Other ID JA43KJ65JG
Journal Section Research Article
Authors

Yılmaz Özçelik This is me

Seyfi Kulaksız This is me

Publication Date September 1, 1995
Submission Date September 1, 1995
Published in Issue Year 1995 Volume: 34 Issue: 3

Cite

APA Özçelik, Y., & Kulaksız, S. (1995). The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations. Scientific Mining Journal, 34(3), 3-14.
AMA Özçelik Y, Kulaksız S. The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations. Mining. September 1995;34(3):3-14.
Chicago Özçelik, Yılmaz, and Seyfi Kulaksız. “The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations”. Scientific Mining Journal 34, no. 3 (September 1995): 3-14.
EndNote Özçelik Y, Kulaksız S (September 1, 1995) The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations. Scientific Mining Journal 34 3 3–14.
IEEE Y. Özçelik and S. Kulaksız, “The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations”, Mining, vol. 34, no. 3, pp. 3–14, 1995.
ISNAD Özçelik, Yılmaz - Kulaksız, Seyfi. “The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations”. Scientific Mining Journal 34/3 (September 1995), 3-14.
JAMA Özçelik Y, Kulaksız S. The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations. Mining. 1995;34:3–14.
MLA Özçelik, Yılmaz and Seyfi Kulaksız. “The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations”. Scientific Mining Journal, vol. 34, no. 3, 1995, pp. 3-14.
Vancouver Özçelik Y, Kulaksız S. The Problems Encountered in ELİ Soma Işıklar Inclined Shaft, Applied Support Systems and Solution Recommendations. Mining. 1995;34(3):3-14.

22562 22561 22560 22590 22558