Abstract

The aim of this paper is to summarize a cost optimization procedure through minimizing the total drill meters and the over breaks that occure in tunnel excavationin medium strong rock (uniaxial compressive.strengh < 80 MPa) conditions.The approach used in said cost optimization is an alternative practice of the concept of rock fragmentation through seismic waves that were originated in Sweden (Grand 1980). The proposed cost op­timization practice is analternative approach to smooth blasting technique that is em­ployed in tunnel excavation, since this approach reduces the overbreak and speeds up the excavation

TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM

Year 1994, Volume: 33 Issue: 2, 11 - 18, 01.06.1994

Abstract

Bu yazının amacı orta sağlam (basınç dayanımı < 80 MPa) kalker kayaç ortamlarında açılan tünellerde ayna delgi metrajın ve proje hattı dışı tazla yıkılmaları en aza indirgeyen bir maliyet optimizasyonunun özetlenmesidir. Bu uygulama 1980' lerde İsveç'te geleştirilen ve kayaç parçalanmasını sismik dalgalar ile izah eden (Grand 1980) yöntemin alternatif bir uygulamasıdır. Söz konusu optimizasyonu sağlayan uygulama 1950 yılından beri tünel pat­latmalarında kullanılan yumuşak patlatma (smooth-blasting) tekniğinden daha ekonomik olup bunun yanında kazı hızının artırılmasına imkan vermesi nedeniyle tünel kazılarında ekonomik bir alternatif yaklaşım oluşturmaktadır

There are 0 citations in total.

Details

Other ID JA36YE62ZF
Journal Section Research Article
Authors

Taner Sümer This is me

Publication Date June 1, 1994
Submission Date June 1, 1994
Published in Issue Year 1994 Volume: 33 Issue: 2

Cite

APA Sümer, T. (1994). TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM. Bilimsel Madencilik Dergisi, 33(2), 11-18.
AMA Sümer T. TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM. Mining. June 1994;33(2):11-18.
Chicago Sümer, Taner. “TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM”. Bilimsel Madencilik Dergisi 33, no. 2 (June 1994): 11-18.
EndNote Sümer T (June 1, 1994) TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM. Bilimsel Madencilik Dergisi 33 2 11–18.
IEEE T. Sümer, “TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM”, Mining, vol. 33, no. 2, pp. 11–18, 1994.
ISNAD Sümer, Taner. “TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM”. Bilimsel Madencilik Dergisi 33/2 (June 1994), 11-18.
JAMA Sümer T. TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM. Mining. 1994;33:11–18.
MLA Sümer, Taner. “TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM”. Bilimsel Madencilik Dergisi, vol. 33, no. 2, 1994, pp. 11-18.
Vancouver Sümer T. TÜNEL KAZILARINDA MALİYET OPTIMIZASYONU İÇİN ALTERNATİF BİR YAKLAŞIM. Mining. 1994;33(2):11-8.

22562 22561 22560 22590 22558