BibTex RIS Cite

The Hydrogeological Investigation of Bolu - Göynük Lignite Mine

Year 1989, Volume: 28 Issue: 4, 35 - 44, 01.12.1989

Abstract

One of the most important problems faced in open pits is the excess water surfacing and accumulating in working area. Because, the water prevents the operation of mining machines, decreases the production and slows down the transportation. A similar problem arises in the removal of overburden and coal production at Bolu Göynük lignite mine which has a potential of 43,4 x 106 ton. To solve this problem a hydrogeological investigation was carried out. Surface drainage system, physical parameters of drainage areas, maximum flood magnitudes of 2,5,10,25,50, and 100 years recurrance intervals were determined. The per­meability coefficients of layers overlying the coal bed, which show point value character, were found by laboratory analysis of the field samples

Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü

Year 1989, Volume: 28 Issue: 4, 35 - 44, 01.12.1989

Abstract

Açık işletmeciliğin önemli sorunlarından biri yapılan kazılar esnasında ve sonraki aşamalarda ortaya çıkan suların yüzeyde birikmesinden ötürü iş makinalarının çalışmasının engellenmesi ve bu nedenle üretimin ve taşınmanın olumsuz yönde etkilenmesidir. 43,4 milyon ton linyit kömürü potansiyeline sahip Bolu-Göynük linyit işletmesinde dekepaj ve kömür çıkarılması sırasında benzer sorun ortaya çıkmıştır. Bu sorunu çözmek amacıyla yapılan hidrojeolojik araştırmanın ön etüdünde topografya ile jeolojik yapı birlikte değerlendirilerek çevre yüzey suları drenaj ağı, fiziksel havza parametreleri belirlenmiş ve olası 2, 5, 10, 25, 50, 100 yıl tekerrür süreli maksimum taşkın değerleri hesap­lanmıştır

There are 0 citations in total.

Details

Other ID JA24PP68CU
Journal Section Research Article
Authors

İbrahim Gürer This is me

Publication Date December 1, 1989
Submission Date December 1, 1989
Published in Issue Year 1989 Volume: 28 Issue: 4

Cite

APA Gürer, İ. (1989). Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü. Bilimsel Madencilik Dergisi, 28(4), 35-44.
AMA Gürer İ. Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü. Mining. December 1989;28(4):35-44.
Chicago Gürer, İbrahim. “Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü”. Bilimsel Madencilik Dergisi 28, no. 4 (December 1989): 35-44.
EndNote Gürer İ (December 1, 1989) Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü. Bilimsel Madencilik Dergisi 28 4 35–44.
IEEE İ. Gürer, “Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü”, Mining, vol. 28, no. 4, pp. 35–44, 1989.
ISNAD Gürer, İbrahim. “Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü”. Bilimsel Madencilik Dergisi 28/4 (December 1989), 35-44.
JAMA Gürer İ. Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü. Mining. 1989;28:35–44.
MLA Gürer, İbrahim. “Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü”. Bilimsel Madencilik Dergisi, vol. 28, no. 4, 1989, pp. 35-44.
Vancouver Gürer İ. Bolu - Göynük Linyit Madeni Hidrojeolojik Etüdü. Mining. 1989;28(4):35-44.

22562 22561 22560 22590 22558