Time Cost–Quality Trade-Off Optimization for Subcontractor Selection Using a Golden Ratio-Inspired Oppositional Rao-1 Algorithm
Abstract
Keywords
References
- [1] J. Mbachu, “Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry”, Construction Management and Economics, 26(5), (2008), 471-484.
- [2] G. Polat, B. Kaplan, B. N. Bingol, “Subcontractor selection using genetic algorithm”, Procedia Engineering, 123, (2015), 432-440.
- [3] S. Kale, D. Arditi, “General contractors’ relationships with subcontractors: A strategic asset”, Construction Management and Economics, 19(5), (2001), 541-549.
- [4] S. Monghasemi, M. R. Nikoo, M. A. Khaksar Fasaee, J. Adamowski, “A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects”, Expert Systems with Applications, 42(6), (2014), 3089-104.
- [5] H. Dolio, “Analysis of pre-qualification criteria in contractor selection and their impacts on project success”, Construction Management and Economics, 27(12), (2009), 1245-1263.
- [6] H. Zhang, H. Li, “Simulation-based optimization for dynamic resource allocation”, Automation in Construction, 13(3), (2004), 409-420.
- [7] D.-H. Tran, M.-Y. Cheng, M.-T. Cao, “Hybrid multiple objective artificial bee colony with differential evolution for the time–cost–quality trade-off problem”, Knowledge-Based Systems, 74, (2015), 176-86.
- [8] A. Afshar, A. Kaveh, O. Shoghli, “Multi-objective optimization of time–cost–quality using multi-colony ant algorithm”, Asian Journal of Civil Engineering, 8(2), (2007), 113-24.
Details
Primary Language
English
Subjects
Civil Construction Engineering
Journal Section
Research Article
Authors
Bayram Ateş
0000-0002-1251-7053
Türkiye
Early Pub Date
May 4, 2026
Publication Date
-
Submission Date
January 24, 2026
Acceptance Date
April 15, 2026
Published in Issue
Year 2026 Number: Advanced Online Publication