Abstract

Base stations are very important for all GSM operators. Efficient base stations prevent income loss while bringing prestige to the company. This study deals with the problem of transportation planning of portable generators during electricity failure for a leading Turkish GSM operator. There are often electricity failures in a particular area of Mersin which cause not only customer complaints but also income loss for the company. After an electricity failure, a battery steps in for that station. However, the lifetime of battery is limited and sometimes not enough during the failure. In that case, a fixed generator could step in to give service properly. Unfortunately, because of the high cost of fixed generators, not all base stations have a fixed generator. Therefore, the company tries to interfere this problem by using limited number of portable generators. Field operation teams transport and set up these portable generators to the sites with electricity failure before the battery dies. The problem is to schedule the transportation of portable generators to the base stations with electricity failure. In this study, composite dispatching rule, one of the scheduling algorithms, is used to solve this planning problem effectively. An Excel based decision support system has been developed for field operation team. Whenever a failure occurs, after inputting necessary information to the Excel, transportation schedule for each team could be easily obtained by the company experts.

Keywords

References

  1. Aydın S, Özer G. “The analysis of antecedents of customer loyalty in the Turkish mobile telecommunication market”. European Journal of Marketing, 39(7/8), 910-925, 2005.
  2. Akbulut A. Mobile Base Station Performance Analysis. Msc Thesis, Karadeniz Teknik University, Trabzon, 2013.
  3. Adegoke AS, Babalola IT. “Quality of service analysis of GSM telephone system in Nigeria”. American Journal of Scientific and Industrial Research, 2(5), 707-712, 2011.
  4. Fan X, Wang F, Liu J. “Boosting service availability for base stations of cellular networks by event-driven battery profiling”. ACM SIGMETRICS Performance Evaluation Review, 44(2), 88-93, 2016.
  5. Lorincs J, Garma T, Petrovic G. “Measurements and modelling of base station power consumption under real traffic loads”. Sensors, 12(4), 4181-4310, 2012.
  6. Richter F, Fehske AJ, Fettweis GP. “Energy efficiency aspects of base station deployment strategies for cellular networks”. GLOBECOM Workshops, 2010 IEEE, Anchorage, 2010.
  7. Fehske AJ, Richter F, Fettweis GP. “Energy Efficiency Improvements through Micro Sites in Cellular Mobile Radio Networks”. IEEE 2009 GLOBECOM Workshops, Honolulu, USA, 1-5, December 2009.
  8. Castillo-Salazar JA, Landa-Silva D, Qu R. “Workforce Scheduling and routing problems: literature survey and computational study”. Annals of Operations Research, 239(1), 39-67, 2016.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Authors

Kübra Çakır This is me

Nur Yılmaz This is me

Meltem Bayrak This is me

Publication Date

August 28, 2019

Submission Date

December 16, 2017

Acceptance Date

-

Published in Issue

Year 2019 Volume: 25 Number: 4

APA
Üney Yüksektepe, F., Çakır, K., Yılmaz, N., & Bayrak, M. (2019). Team planning under an electricity failure for a GSM operator. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, 25(4), 473-480. https://izlik.org/JA43TF29MG
AMA
1.Üney Yüksektepe F, Çakır K, Yılmaz N, Bayrak M. Team planning under an electricity failure for a GSM operator. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2019;25(4):473-480. https://izlik.org/JA43TF29MG
Chicago
Üney Yüksektepe, Fadime, Kübra Çakır, Nur Yılmaz, and Meltem Bayrak. 2019. “Team Planning under an Electricity Failure for a GSM Operator”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 25 (4): 473-80. https://izlik.org/JA43TF29MG.
EndNote
Üney Yüksektepe F, Çakır K, Yılmaz N, Bayrak M (August 1, 2019) Team planning under an electricity failure for a GSM operator. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 25 4 473–480.
IEEE
[1]F. Üney Yüksektepe, K. Çakır, N. Yılmaz, and M. Bayrak, “Team planning under an electricity failure for a GSM operator”, Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, vol. 25, no. 4, pp. 473–480, Aug. 2019, [Online]. Available: https://izlik.org/JA43TF29MG
ISNAD
Üney Yüksektepe, Fadime - Çakır, Kübra - Yılmaz, Nur - Bayrak, Meltem. “Team Planning under an Electricity Failure for a GSM Operator”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 25/4 (August 1, 2019): 473-480. https://izlik.org/JA43TF29MG.
JAMA
1.Üney Yüksektepe F, Çakır K, Yılmaz N, Bayrak M. Team planning under an electricity failure for a GSM operator. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2019;25:473–480.
MLA
Üney Yüksektepe, Fadime, et al. “Team Planning under an Electricity Failure for a GSM Operator”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, vol. 25, no. 4, Aug. 2019, pp. 473-80, https://izlik.org/JA43TF29MG.
Vancouver
1.Fadime Üney Yüksektepe, Kübra Çakır, Nur Yılmaz, Meltem Bayrak. Team planning under an electricity failure for a GSM operator. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi [Internet]. 2019 Aug. 1;25(4):473-80. Available from: https://izlik.org/JA43TF29MG