Design and analysis of bi-objective flexible job shop scheduling problem: A case study in construction equipment manufacturing industry
Abstract
Keywords
References
- Kalite Derneği (TMME). “2016 Türkiye Müşteri Memnuniyeti Endeksi”. http://www.kalder.org/tmme (11/02/2018).
- Johnson SM. “Optimal two and three stage production schedules with setup times included”. Naval Research Logistics Quarterly, 1(1), 61-8, 1954.
- Van Wassenhove LN, Baker KR. “A bi-criterion approach to time/cost trade-offs in sequencing”. European Journal of Operational Research, 11(1), 48-54, 1982.
- Brucker P, Schlie R. “Job-shop scheduling with multi-purpose machines”. Computing, 45(4), 369-375, 1990.
- Yazdani M, Gholami M, Zandieh M, Mousakhani M. “A simulated annealing algorithm for flexible job-shop scheduling problem”. Journal of applied sciences, 9(4), 662-670, 2009.
- Kacem I, Hammadi S, Borne P. “Approach by localization and multi-objective evolutionary optimization for flexible job-shop scheduling problems”. IEEE Transactions on Systems, Man and Cybernetics, 32(1), 1-13, 2002.
- Paulli J. “A hierarchical approach for FMS scheduling problem”. European Journal of Operational Research, 86, 32-42, 1995.
- Watanabe M, Ida K, Gen M. “A genetic algorithm with modified crossover operator and search area adaptation for the job-shop scheduling problem”. Computers & Industrial Engineering, 48(4), 743-752, 2005.
Details
Primary Language
English
Subjects
Engineering
Journal Section
Research Article
Authors
Hamdi Giray Reşat
This is me
Türkiye
Publication Date
February 20, 2020
Submission Date
November 15, 2018
Acceptance Date
-
Published in Issue
Year 2020 Volume: 26 Number: 1