BibTex RIS Cite

TIME ANALYSIS ACCORDING TO PART PROGRAMS ON A CNC VERTICAL MACHINING CENTER

Year 2002, Volume: 8 Issue: 1, 42 - 51, 01.01.2002

Abstract

In this study, a program examining the CNC programs in the control unit of Dyna Myte 2900 Vertical Machining Center and calculating the machining time and rapid movement time of the cutting tools has been developed. The workpiece program to be examined is transferred to CNC code editor by the user manually, by a computer file with a diskette, or through hard disk or the machine tool. By examining all the movements of the cutting tools, detailed machining time, rapid movement time or total time is served to the user. So that, an important part of workpiece cost analysis information is provided.

BSD'Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ

Year 2002, Volume: 8 Issue: 1, 42 - 51, 01.01.2002

Abstract

Bu çalışmada; Dyna Myte 2900 Dik İşleme Merkezinin kontrol ünitesinde Bilgisayarlı Sayısal Denetim (BSD) programlarını inceleyen, işleme süresi ve kesicilerin hızlı hareket (boşta ilerleme) sürelerini hesaplayan bir program yapılmıştır. İncelenecek parça programı kullanıcı tarafından klavyeden elle, bir bilgisayar dosyası olarak disketten ya da hard diskten veya tezgahtan BSD (CNC) kod editörüne aktarılır. Kesicilerin tüm hareketleri incelenerek, ayrıntılı olarak işleme ve boşta ilerleme süresi ve toplam süre kullanıcıya sunulur. Böylelikle iş parçası maliyet analizi için önemli bir veri elde edilmiş olur.

There are 0 citations in total.

Details

Primary Language Turkish
Journal Section Research Article
Authors

Ahmet Murat Pinar This is me

Abdulkadir Güllü This is me

Publication Date January 1, 2002
Published in Issue Year 2002 Volume: 8 Issue: 1

Cite

APA Pinar, A. M. ., & Güllü, A. . (2002). BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, 8(1), 42-51.
AMA Pinar AM, Güllü A. BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. January 2002;8(1):42-51.
Chicago Pinar, Ahmet Murat, and Abdulkadir Güllü. “BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 8, no. 1 (January 2002): 42-51.
EndNote Pinar AM, Güllü A (January 1, 2002) BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 8 1 42–51.
IEEE A. M. . Pinar and A. . Güllü, “BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ”, Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, vol. 8, no. 1, pp. 42–51, 2002.
ISNAD Pinar, Ahmet Murat - Güllü, Abdulkadir. “BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 8/1 (January 2002), 42-51.
JAMA Pinar AM, Güllü A. BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2002;8:42–51.
MLA Pinar, Ahmet Murat and Abdulkadir Güllü. “BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ”. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, vol. 8, no. 1, 2002, pp. 42-51.
Vancouver Pinar AM, Güllü A. BSD’Lİ DİK İŞLEME MERKEZİNDE PARÇA PROGRAMINA GÖRE ZAMAN ANALİZİ. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi. 2002;8(1):42-51.

ESCI_LOGO.png    image001.gif    image002.gif        image003.gif     image004.gif