IN LIMITED TIME CONSTRUCTION PROJECTS, TO FIGURE OUT THE MENPOWER COST BY CPM ANALYZING

Abstract

The goal of project planning is to make different planning upon different rules, to select the most rationalized one by analizing time, resource and cost analyses for each planning. In this study the cost of Ankara Aşı Serum ve İlaç Kontrol Instıtute building is evaluated with different programs and manpower cost of building has been calculated according to the normal complating time %5, %10 and %15 of the building the menpower costs figured out again. For each shortage of the time new work plans prepared, menpower costs calculated and related diagrams drown and time-cost comparision has been made

Keywords

Details

Primary Language

Turkish

Subjects

-

Journal Section

-

Authors

Recep Kanıt This is me

Latif Onur Uğur This is me

Publication Date

June 1, 2004

Submission Date

June 1, 2004

Acceptance Date

-

Published in Issue

Year 2004 Volume: 7 Number: 2

APA
Kanıt, R., & Uğur, L. O. (2004). SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ. Politeknik Dergisi, 7(2), 159-167. https://izlik.org/JA54PE54UG
AMA
1.Kanıt R, Uğur LO. SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ. Politeknik Dergisi. 2004;7(2):159-167. https://izlik.org/JA54PE54UG
Chicago
Kanıt, Recep, and Latif Onur Uğur. 2004. “SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ”. Politeknik Dergisi 7 (2): 159-67. https://izlik.org/JA54PE54UG.
EndNote
Kanıt R, Uğur LO (June 1, 2004) SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ. Politeknik Dergisi 7 2 159–167.
IEEE
[1]R. Kanıt and L. O. Uğur, “SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ”, Politeknik Dergisi, vol. 7, no. 2, pp. 159–167, June 2004, [Online]. Available: https://izlik.org/JA54PE54UG
ISNAD
Kanıt, Recep - Uğur, Latif Onur. “SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ”. Politeknik Dergisi 7/2 (June 1, 2004): 159-167. https://izlik.org/JA54PE54UG.
JAMA
1.Kanıt R, Uğur LO. SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ. Politeknik Dergisi. 2004;7:159–167.
MLA
Kanıt, Recep, and Latif Onur Uğur. “SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ”. Politeknik Dergisi, vol. 7, no. 2, June 2004, pp. 159-67, https://izlik.org/JA54PE54UG.
Vancouver
1.Recep Kanıt, Latif Onur Uğur. SÜRE KISITLI İNŞAAT PROJELERİNDE İŞGÜCÜ MALİYETİNİN CPM İLE ANALİZİ. Politeknik Dergisi [Internet]. 2004 Jun. 1;7(2):159-67. Available from: https://izlik.org/JA54PE54UG