FINANCIAL ANALISYS AND CURRENCY RISK QUANTIFICATION UNDER VALUE AT RISK METHODOLOGY OF INTEGRATED HEALTH CAMPUS PROJECTS WITH PUBLIC-PRIVATE PARTNERSHIP

Volume: 14 Number: 28 December 1, 2014
  • Ferhan Benli
  • Gökşen Topuz
  • Emre Ceviz
EN TR

FINANCIAL ANALISYS AND CURRENCY RISK QUANTIFICATION UNDER VALUE AT RISK METHODOLOGY OF INTEGRATED HEALTH CAMPUS PROJECTS WITH PUBLIC-PRIVATE PARTNERSHIP

Abstract

The expected cost of 16 integrated health campus that the TR Ministry of Health (MoH) is planning to implement within 10 years is 10 billion dollars. These projects are planning to be built by the model “restore-operate. The contactor companies are paid in TL by the MoH as they finance the project by foreign currency loans so they face a serious currency risk. Quantification of currency risk has a great importance in order to pricing the projects accurately and generation of a fair and effective payment mechanism for both the contractor and public authority. In this study,for the Ankara Etlik Integrated Health Campus Project, the change on the foreign exchange rates for 4 year construction period and 25 year operation period is tried to be observed by simulation. The expected income in TL and foreign currency (Euro and Dollar) and the Value-at-Risk (VaR) of the change of the income in foreign currency are evaluated. The value of hedging exposure of this project calculated for the mentioned currency risk.

Keywords

Details

Primary Language

Turkish

Subjects

-

Journal Section

-

Authors

Ferhan Benli This is me

Gökşen Topuz This is me

Emre Ceviz This is me

Publication Date

December 1, 2014

Submission Date

December 1, 2014

Acceptance Date

-

Published in Issue

Year 2014 Volume: 14 Number: 28

APA
Benli, F., Topuz, G., & Ceviz, E. (2014). KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. Sosyal Ekonomik Araştırmalar Dergisi, 14(28), 209-226. https://doi.org/10.30976/susead.302208
AMA
1.Benli F, Topuz G, Ceviz E. KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. SUSEAD. 2014;14(28):209-226. doi:10.30976/susead.302208
Chicago
Benli, Ferhan, Gökşen Topuz, and Emre Ceviz. 2014. “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”. Sosyal Ekonomik Araştırmalar Dergisi 14 (28): 209-26. https://doi.org/10.30976/susead.302208.
EndNote
Benli F, Topuz G, Ceviz E (December 1, 2014) KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. Sosyal Ekonomik Araştırmalar Dergisi 14 28 209–226.
IEEE
[1]F. Benli, G. Topuz, and E. Ceviz, “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”, SUSEAD, vol. 14, no. 28, pp. 209–226, Dec. 2014, doi: 10.30976/susead.302208.
ISNAD
Benli, Ferhan - Topuz, Gökşen - Ceviz, Emre. “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”. Sosyal Ekonomik Araştırmalar Dergisi 14/28 (December 1, 2014): 209-226. https://doi.org/10.30976/susead.302208.
JAMA
1.Benli F, Topuz G, Ceviz E. KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. SUSEAD. 2014;14:209–226.
MLA
Benli, Ferhan, et al. “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”. Sosyal Ekonomik Araştırmalar Dergisi, vol. 14, no. 28, Dec. 2014, pp. 209-26, doi:10.30976/susead.302208.
Vancouver
1.Ferhan Benli, Gökşen Topuz, Emre Ceviz. KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. SUSEAD. 2014 Dec. 1;14(28):209-26. doi:10.30976/susead.302208

Cited By