The expected cost of 16 integrated health campus that the TR Ministry of Health (MoH) is planning to implement within 10 years is 10 billion dollars. These projects are planning to be built by the model “restore-operate. The contactor companies are paid in TL by the MoH as they finance the project by foreign currency loans so they face a serious currency risk. Quantification of currency risk has a great importance in order to pricing the projects accurately and generation of a fair and effective payment mechanism for both the contractor and public authority. In this study,for the Ankara Etlik Integrated Health Campus Project, the change on the foreign exchange rates for 4 year construction period and 25 year operation period is tried to be observed by simulation. The expected income in TL and foreign currency (Euro and Dollar) and the Value-at-Risk (VaR) of the change of the income in foreign currency are evaluated. The value of hedging exposure of this project calculated for the mentioned currency risk.

Anahtar Kelimeler

Ayrıntılar

Birincil Dil

Türkçe

Konular

-

Bölüm

-

Yazarlar

Ferhan Benli Bu kişi benim

Gökşen Topuz Bu kişi benim

Emre Ceviz Bu kişi benim

Yayımlanma Tarihi

1 Aralık 2014

Gönderilme Tarihi

1 Aralık 2014

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2014 Cilt: 14 Sayı: 28

Kaynak Göster

APA
Benli, F., Topuz, G., & Ceviz, E. (2014). KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. Sosyal Ekonomik Araştırmalar Dergisi, 14(28), 209-226. https://doi.org/10.30976/susead.302208
AMA
1.Benli F, Topuz G, Ceviz E. KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. SUSEAD. 2014;14(28):209-226. doi:10.30976/susead.302208
Chicago
Benli, Ferhan, Gökşen Topuz, ve Emre Ceviz. 2014. “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”. Sosyal Ekonomik Araştırmalar Dergisi 14 (28): 209-26. https://doi.org/10.30976/susead.302208.
EndNote
Benli F, Topuz G, Ceviz E (01 Aralık 2014) KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. Sosyal Ekonomik Araştırmalar Dergisi 14 28 209–226.
IEEE
[1]F. Benli, G. Topuz, ve E. Ceviz, “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”, SUSEAD, c. 14, sy 28, ss. 209–226, Ara. 2014, doi: 10.30976/susead.302208.
ISNAD
Benli, Ferhan - Topuz, Gökşen - Ceviz, Emre. “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”. Sosyal Ekonomik Araştırmalar Dergisi 14/28 (01 Aralık 2014): 209-226. https://doi.org/10.30976/susead.302208.
JAMA
1.Benli F, Topuz G, Ceviz E. KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. SUSEAD. 2014;14:209–226.
MLA
Benli, Ferhan, vd. “KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ”. Sosyal Ekonomik Araştırmalar Dergisi, c. 14, sy 28, Aralık 2014, ss. 209-26, doi:10.30976/susead.302208.
Vancouver
1.Ferhan Benli, Gökşen Topuz, Emre Ceviz. KAMU ÖZEL ORTAKLIĞI İLE YAPILAN ENTEGRE SAĞLIK KAMPÜSÜ PROJELERİNİN MALİ ANALİZİ VE RİSKE MARUZ DEĞER (VAR) METODOLOJİSİ ALTINDA KUR RİSKİ ÖLÇÜMLEMESİ. SUSEAD. 01 Aralık 2014;14(28):209-26. doi:10.30976/susead.302208

Cited By