Research Article

Portland Limestone Cement Part I - Preparation of Cements

Volume: 20 Number: 100 May 1, 2009
  • Kamile Tosun
  • Burak Felekoğlu
  • Bülent Baradan
  • İ. Akın Altun
EN TR

Portland Limestone Cement Part I - Preparation of Cements

Abstract

This paper is the first part of a research project which was supported by TUBITAK titled “Determination of Optimum Limestone Content in Portland Limestone Cement Production from the View Point of Mechanical Performance and Sulfate Originated Durability Problems”. In this stage, blended cements incorporating different amounts of limestone powders from 5 to 40% were prepared. The problems observed in the preparation stage of limestone blended cements and the effects of limestone replacement on the physical and mechanical properties were investigated. Increasing of limestone replacement ratios resulted in a wider particle size distribution. In contrast with the increases in Blaine values, fineness (residue at 32 µm) values of cements have also increased. Mortars had a sticky and cohesive consistency. Also, increasing the limestone incorporation caused decreases in unit weights and compressive strength values of mortars with a parallel increase in water absorption values at all ages. 

Keywords

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Authors

Kamile Tosun This is me

Burak Felekoğlu This is me

Bülent Baradan This is me

İ. Akın Altun This is me

Publication Date

May 1, 2009

Submission Date

June 18, 2015

Acceptance Date

-

Published in Issue

Year 2009 Volume: 20 Number: 100

APA
Tosun, K., Felekoğlu, B., Baradan, B., & Altun, İ. A. (2009). Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi, 20(100), 1337-1355. https://izlik.org/JA52RM46NB
AMA
1.Tosun K, Felekoğlu B, Baradan B, Altun İA. Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi. 2009;20(100):1337-1355. https://izlik.org/JA52RM46NB
Chicago
Tosun, Kamile, Burak Felekoğlu, Bülent Baradan, and İ. Akın Altun. 2009. “Portland Limestone Cement Part I - Preparation of Cements”. Teknik Dergi 20 (100): 1337-55. https://izlik.org/JA52RM46NB.
EndNote
Tosun K, Felekoğlu B, Baradan B, Altun İA (May 1, 2009) Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi 20 100 1337–1355.
IEEE
[1]K. Tosun, B. Felekoğlu, B. Baradan, and İ. A. Altun, “Portland Limestone Cement Part I - Preparation of Cements”, Teknik Dergi, vol. 20, no. 100, pp. 1337–1355, May 2009, [Online]. Available: https://izlik.org/JA52RM46NB
ISNAD
Tosun, Kamile - Felekoğlu, Burak - Baradan, Bülent - Altun, İ. Akın. “Portland Limestone Cement Part I - Preparation of Cements”. Teknik Dergi 20/100 (May 1, 2009): 1337-1355. https://izlik.org/JA52RM46NB.
JAMA
1.Tosun K, Felekoğlu B, Baradan B, Altun İA. Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi. 2009;20:1337–1355.
MLA
Tosun, Kamile, et al. “Portland Limestone Cement Part I - Preparation of Cements”. Teknik Dergi, vol. 20, no. 100, May 2009, pp. 1337-55, https://izlik.org/JA52RM46NB.
Vancouver
1.Kamile Tosun, Burak Felekoğlu, Bülent Baradan, İ. Akın Altun. Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi [Internet]. 2009 May 1;20(100):1337-55. Available from: https://izlik.org/JA52RM46NB