Portland Limestone Cement Part I - Preparation of Cements

Öz

This paper is the first part of a research project which was supported by TUBITAK titled “Determination of Optimum Limestone Content in Portland Limestone Cement Production from the View Point of Mechanical Performance and Sulfate Originated Durability Problems”. In this stage, blended cements incorporating different amounts of limestone powders from 5 to 40% were prepared. The problems observed in the preparation stage of limestone blended cements and the effects of limestone replacement on the physical and mechanical properties were investigated. Increasing of limestone replacement ratios resulted in a wider particle size distribution. In contrast with the increases in Blaine values, fineness (residue at 32 µm) values of cements have also increased. Mortars had a sticky and cohesive consistency. Also, increasing the limestone incorporation caused decreases in unit weights and compressive strength values of mortars with a parallel increase in water absorption values at all ages. 

Anahtar Kelimeler

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yazarlar

Kamile Tosun Bu kişi benim

Burak Felekoğlu Bu kişi benim

Bülent Baradan Bu kişi benim

İ. Akın Altun Bu kişi benim

Yayımlanma Tarihi

1 Mayıs 2009

Gönderilme Tarihi

18 Haziran 2015

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2009 Cilt: 20 Sayı: 100

Kaynak Göster

APA
Tosun, K., Felekoğlu, B., Baradan, B., & Altun, İ. A. (2009). Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi, 20(100), 1337-1355. https://izlik.org/JA52RM46NB
AMA
1.Tosun K, Felekoğlu B, Baradan B, Altun İA. Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi. 2009;20(100):1337-1355. https://izlik.org/JA52RM46NB
Chicago
Tosun, Kamile, Burak Felekoğlu, Bülent Baradan, ve İ. Akın Altun. 2009. “Portland Limestone Cement Part I - Preparation of Cements”. Teknik Dergi 20 (100): 1337-55. https://izlik.org/JA52RM46NB.
EndNote
Tosun K, Felekoğlu B, Baradan B, Altun İA (01 Mayıs 2009) Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi 20 100 1337–1355.
IEEE
[1]K. Tosun, B. Felekoğlu, B. Baradan, ve İ. A. Altun, “Portland Limestone Cement Part I - Preparation of Cements”, Teknik Dergi, c. 20, sy 100, ss. 1337–1355, May. 2009, [çevrimiçi]. Erişim adresi: https://izlik.org/JA52RM46NB
ISNAD
Tosun, Kamile - Felekoğlu, Burak - Baradan, Bülent - Altun, İ. Akın. “Portland Limestone Cement Part I - Preparation of Cements”. Teknik Dergi 20/100 (01 Mayıs 2009): 1337-1355. https://izlik.org/JA52RM46NB.
JAMA
1.Tosun K, Felekoğlu B, Baradan B, Altun İA. Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi. 2009;20:1337–1355.
MLA
Tosun, Kamile, vd. “Portland Limestone Cement Part I - Preparation of Cements”. Teknik Dergi, c. 20, sy 100, Mayıs 2009, ss. 1337-55, https://izlik.org/JA52RM46NB.
Vancouver
1.Kamile Tosun, Burak Felekoğlu, Bülent Baradan, İ. Akın Altun. Portland Limestone Cement Part I - Preparation of Cements. Teknik Dergi [Internet]. 01 Mayıs 2009;20(100):1337-55. Erişim adresi: https://izlik.org/JA52RM46NB