Abstract

Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management. 

Keywords

References

  1. Ahbab, C. & Celik, T., 2012. An investigation on delay, cost overrun, quality, and health and safety problems in construction projects. Ankara, Middle East Technical University, pp. 1-6.
  2. Ahsan, K. & Gunawan, I., 2010. Analysis of cost and schedule performance of international development projects. International Journal of Project Management, pp. 68-78.
  3. Arditi, D., Akan, G. T. & Gurdamar, S., 1985. Cost overruns in public projects. International Journal of Project Management, pp. 218-224.
  4. Assaf, S. A. & Al-Hejji, S., 2006. Causes of delay in large construction projects. International Journal of Project Management, pp. 349-357.
  5. Banker, R. D., Charnes, A. & Cooper, W. W., 1984. Some Models for Estimating Technical and Scale Inefficiencies in Data Envelopment Analysis. Management Science, pp. 1078-1092.
  6. Besner, C. & Hobbs, B., 2006. The Perceived Vaeue And Potentiae Contribution Oe Project Manacement Practices To Project Success. Project Management Journal, pp. 37-48.
  7. Charnes, A., Cooper, W. W. & Rhodes, E., 1978. Measuring the efficiency of decision making units. European Journal of Operational Research, pp. 429-444.
  8. Cheng, Y.-M., 2014. An exploration into cost-influencing factors on construction projects. International Journal of Project Management, pp. 850-860.

Details

Primary Language

English

Subjects

Engineering, Civil Engineering

Journal Section

Research Article

Authors

Changiz Ahbab *
DOĞU AKDENİZ ÜNİVERSİTESİ
0000-0002-0780-1375
Türkiye

Sahand Daneshvar This is me
DOĞU AKDENİZ ÜNİVERSİTESİ
0000-0002-8597-3463
Türkiye

Tahir Celık This is me
ULUSLARARASI KIBRIS ÜNİVERSİTESİ
0000-0002-2943-0640
Türkiye

Publication Date

March 1, 2019

Submission Date

January 8, 2018

Acceptance Date

November 12, 2018

Published in Issue

Year 2019 Volume: 30 Number: 2

APA
Ahbab, C., Daneshvar, S., & Celık, T. (2019). Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis. Teknik Dergi, 30(2), 8937-8959. https://doi.org/10.18400/tekderg.375664
AMA
1.Ahbab C, Daneshvar S, Celık T. Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis. Teknik Dergi. 2019;30(2):8937-8959. doi:10.18400/tekderg.375664
Chicago
Ahbab, Changiz, Sahand Daneshvar, and Tahir Celık. 2019. “Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis”. Teknik Dergi 30 (2): 8937-59. https://doi.org/10.18400/tekderg.375664.
EndNote
Ahbab C, Daneshvar S, Celık T (March 1, 2019) Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis. Teknik Dergi 30 2 8937–8959.
IEEE
[1]C. Ahbab, S. Daneshvar, and T. Celık, “Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis”, Teknik Dergi, vol. 30, no. 2, pp. 8937–8959, Mar. 2019, doi: 10.18400/tekderg.375664.
ISNAD
Ahbab, Changiz - Daneshvar, Sahand - Celık, Tahir. “Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis”. Teknik Dergi 30/2 (March 1, 2019): 8937-8959. https://doi.org/10.18400/tekderg.375664.
JAMA
1.Ahbab C, Daneshvar S, Celık T. Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis. Teknik Dergi. 2019;30:8937–8959.
MLA
Ahbab, Changiz, et al. “Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis”. Teknik Dergi, vol. 30, no. 2, Mar. 2019, pp. 8937-59, doi:10.18400/tekderg.375664.
Vancouver
1.Changiz Ahbab, Sahand Daneshvar, Tahir Celık. Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis. Teknik Dergi. 2019 Mar. 1;30(2):8937-59. doi:10.18400/tekderg.375664

Cited By