LASTİK JANT BİRLEŞTİRME OPERASYONU İÇİN DIŞ KAYNAK KULLANIM KARARI BENZETİM MODELİ
Abstract
Keywords
References
- 1. Antràs, P.(2003) Firms, contracts, and trade structure, The Quarterly Journal of Economics, 118(4), 1375-1418. doi:10.3386/w9740
- 2. Antràs, P. (2005) Incomplete contracts and the product cycle, American Economic Review, 95(4), 1054-1073. doi: 10.3386/w9945
- 3. Campa, J., ve Goldberg, L.S.(1997) The evolving external orientation of manufacturing industries: evidence from four countries (No. w5919). National Bureau of Economic Research. doi:10.3386/w5919
- 4. Cao, Q., ve Wang, Q. (2007) Optimizing vendor selection in a two-stage outsourcing process, Computers & operations research, 34(12), 3757-3768. doi:10.1016/j.cor.2006.01.013
- 5. Chan, F.T. S., Chan, H.K., ve Lau, H.C.W. (2002) The state of the art in simulation study on FMS scheduling: a comprehensive survey, The International Journal of Advanced Manufacturing Technology, 19(11), 830-849. doi:10.1115/esda2006-95077
- 6. Chan, F. T., ve Chan, H. K. (2004) A comprehensive survey and future trend of simulation study on FMS scheduling, Journal of Intelligent Manufacturing, 15(1), 87-102. doi:10.1023/b:jims.0000010077.27141.be
- 7. de Almeida, A.T. (2007) Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method, Computers & Operations Research, 34(12), 3569-3574. doi:10.1016/j.cor.2006.01.003
- 8. Drauz, R. (2014) Re-insourcing as a manufacturing-strategic option during a crisis—Cases from the automobile industry, Journal of Business Research, 67(3), 346-353. doi:10.1016/j.jbusres.2013.01.004
Details
Primary Language
Turkish
Subjects
Industrial Engineering
Journal Section
Research Article
Authors
Publication Date
August 31, 2020
Submission Date
July 12, 2019
Acceptance Date
June 27, 2020
Published in Issue
Year 2020 Volume: 25 Number: 2