LASTİK JANT BİRLEŞTİRME OPERASYONU İÇİN DIŞ KAYNAK KULLANIM KARARI BENZETİM MODELİ
Öz
Anahtar Kelimeler
Kaynakça
- 1. Antràs, P.(2003) Firms, contracts, and trade structure, The Quarterly Journal of Economics, 118(4), 1375-1418. doi:10.3386/w9740
- 2. Antràs, P. (2005) Incomplete contracts and the product cycle, American Economic Review, 95(4), 1054-1073. doi: 10.3386/w9945
- 3. Campa, J., ve Goldberg, L.S.(1997) The evolving external orientation of manufacturing industries: evidence from four countries (No. w5919). National Bureau of Economic Research. doi:10.3386/w5919
- 4. Cao, Q., ve Wang, Q. (2007) Optimizing vendor selection in a two-stage outsourcing process, Computers & operations research, 34(12), 3757-3768. doi:10.1016/j.cor.2006.01.013
- 5. Chan, F.T. S., Chan, H.K., ve Lau, H.C.W. (2002) The state of the art in simulation study on FMS scheduling: a comprehensive survey, The International Journal of Advanced Manufacturing Technology, 19(11), 830-849. doi:10.1115/esda2006-95077
- 6. Chan, F. T., ve Chan, H. K. (2004) A comprehensive survey and future trend of simulation study on FMS scheduling, Journal of Intelligent Manufacturing, 15(1), 87-102. doi:10.1023/b:jims.0000010077.27141.be
- 7. de Almeida, A.T. (2007) Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method, Computers & Operations Research, 34(12), 3569-3574. doi:10.1016/j.cor.2006.01.003
- 8. Drauz, R. (2014) Re-insourcing as a manufacturing-strategic option during a crisis—Cases from the automobile industry, Journal of Business Research, 67(3), 346-353. doi:10.1016/j.jbusres.2013.01.004
Ayrıntılar
Birincil Dil
Türkçe
Konular
Endüstri Mühendisliği
Bölüm
Araştırma Makalesi
Yazarlar
Yayımlanma Tarihi
31 Ağustos 2020
Gönderilme Tarihi
12 Temmuz 2019
Kabul Tarihi
27 Haziran 2020
Yayımlandığı Sayı
Yıl 2020 Cilt: 25 Sayı: 2