Araştırma Makalesi
BibTex RIS Kaynak Göster

Productivity Analysis in Concrete Building Construction

Yıl 2020, , 391 - 404, 30.04.2020
https://doi.org/10.17482/uumfd.649299

Öz

Unit Price Analysis of the Ministry of Environment and Urbanization is often used as a preferred resource in determining the approximate cost of construction and in preparing the work schedule. Within the scope of this study, man hour values 11 work items, which are widely used in construction of reinforced concrete buildings, are calculated by work measurement and related information was collected from subcontractors. Man hour values calculated as a result of work measurement and subcontractor experiences are compared with the Ministry of Environment and Urbanization unıt price analysis data. As a result of the study, it is concluded that the Ministry of Environment and Urbanization data should be revised according to current technology.

Kaynakça

  • 1. Alboğa, Ö. (2019) Betonarme Binalarda İş Ölçümü ile Verimlilik Analizi Yapılması, Yüksek Lisans Tezi, Çukurova Üniversitesi.
  • 2. Aydın, M.K. (2019)http://www.mustafakemalaydin.com/wp-content/uploads/2014/08/Insaat_Projelerinde_Kalite_Yonetimi_Uygulamalari.pdf, Erişim tarihi: 15.08.2019, Konu: İnşaat Projelerinde Kalite Yönetimi Uygulamaları.
  • 3. Chuan,Q.T, Pheng,L.S. (2006)Enviromental Factors and Work Perfonmance of Project Managers in the Construction Industry, International Journal of Project Management, 24, 24-37. https://doi.org/10.1016/j.ijproman.2005.06.001
  • 4. Ghoddousi,P., Hosseini,M.R. (2012) A Survey Of The Factors Affectıng The Productivity Of Construction Projects in Iran, Technological And Economic Development of Economy, 18,1, 99–116. https://doi.org/10.3846/20294913.2012.661203
  • 5. https://portal.myk.gov.tr/index.php?option=com_meslek_std_taslak&view=taslak_listesi_yeni&msd=2, Erişim Tarihi:12.12.2019, Konu: Ulusal Meslek Standartları.
  • 6. http://disk.org.tr/wp-content/uploads/2019/02/DISK-AR-Krizde-Emeg%CC%86in-Durumu-Arastirmasi-SON.pdf , Erişim Tarihi: 18.12.2019, Konu: Krizde Emeği Durumu Araştırması.
  • 7. https://intes.org.tr/wp-content/uploads/2019/01/%C4%B0N%C5%9EAATSEKT%C3%96R%C3%9C-RAPORU.pdf , Erişim tarihi: 15.08.2019, Konu: İnşaat Sektörü Raporu (2019).
  • 8. http://intes.admind.com.tr/wp-content/uploads/2017/12/sayi_134.pdf, Erişim tarihi:16.08.2019, Konu: İnşaat Sanayi Dergisi, 2017 raporu.
  • 9. Ibroke,O.T., Oladinrin,T.O., Adeniyi,O., Eboreime,I.V. (2013) Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria Journal of Construction in Developing Countries, 18,1,53–72.
  • 10. Ikediashi,D.I., Ogunlana,S.O., Alotaibi,A. (2014) Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach, Journal of Construction in Developing Countries, 19,1,35–52.
  • 11. Karim,N.A., Hassan,S.H., Yunus,J.N., Hashim,M.Z. (2012) Factors Influence Labour Productivity and the Impacts on Construction Industry, Awam International Conference on Civil Engineering &Geohazard Information Zonation.MALEZYA.
  • 12. Kazaz, A.,Ulubeyli, S. (2004) A different approach to construction labour in Turkey: comparative productivity analysis,Building and Environment,39,93 – 100. https://doi.org/10.1016/j.buildenv.2003.08.004
  • 13. Kobu, B. (1998) Üretim Yönetimi, Beta Yayınları, İstanbul.
  • 14. Kuruoğlu,M., Bayoğlu,F.İ. (2001)Yapı Üretiminde Adam saat Değerlerinin Belirlenmesi Üzerine Bir Araştırma Ve Sonuçları. XVI İnşaat Mühendisliği Teknik Kongresi. ANKARA.
  • 15. Olaoluwua,O., Adesanya,D.A. (2015) Productivity of Concrete Placement by Dumpers in Nigeria, International Journal of Engineering Research and Development ,11, 03,15-28. http://dx.doi.org/10.7492/IJAEC.2015.004
  • 16. Oral,E., Mıstıkoğlu,G., Tufan,D. (2006)Zaman Etüdü İle Yapım İşlerinde Adam Saat Değerlerinin Belirlenmesi.7.Uluslararası İnşaat Mühendisliğinde Gelişmeler Kongresi,İstanbul.
  • 17. Oral, M., Oral, E., Aydın, A. (2011) Supervised vs. Unsupervised Learning for Construction Crew Productivity Prediction,Automation in Construction,22,271-276.doi:10.1016/j.autcon.2011.09.002
  • 18. Öcal,M.E, Tat,A., Erdiş,E. (2005) Bayındırlık İşleri Birim Fiyat Analizlerindeki İşgücü Verimliliklerinin İncelenmesi.3.Yapı Kongresi,İzmir.
  • 19. REFA. (1985) İş Etüdü ve Yöntem Bilgisi. Cilt:1-2-3, MPM Yayınları, Yayın no: 544, Ankara.
  • 20. Shehata,M.E., El-Gohary,K.M. (2011) Towards improving construction labor productivity and projects’ performance,Alexandria Engineering Journal,50,321–330. doi:10.1016/j.aej.2012.02.001
  • 21. Tat, A. (2000) Bayındırlık İşleri Birim Fiyat Analizlerindeki İşgücü ve Makine Gücü Verimliliklerinin İrdelenmesi, Yüksek Lisans Tezi, Çukurova Üniversitesi.
  • 22. Tufan, D. (2007) Bina İnşaatlarında Adam Saat Değerlerinin Belirlenmesi Üzerine Bir Uygulama Örneği, Yüksek Lisans Tezi, Mustafa Kemal Üniversitesi.
  • 23. Ulubeyli, S., Kazaz, A., Er, B. (2014) Planning Engineers’ Estimates on Labor Productivity: Theory and Practice, Procedia- Social and Behavioral Sciences, 119 ,12 – 19. https://doi.org/10.1016/j.sbspro.2014.03.004

BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ

Yıl 2020, , 391 - 404, 30.04.2020
https://doi.org/10.17482/uumfd.649299

Öz

İnşaat sektöründe yapı yaklaşık maliyeti belirlenirken ve iş programı hazırlanırken pratik olması amacıyla Çevre ve Şehircilik Bakanlığı’na ait Birim Fiyat Analizleri sıklıkla tercih edilen bir kaynak olarak kullanılmaktadır. Bu çalışma kapsamında betonarme bina inşaatlarında yaygın olarak kullanılan 11 adet iş kaleminin iş ölçüm yöntemi ile adam saat değerleri hesaplanmış ve bu çalışmaya ek olarak taşeronlardan deneyimlerine bağlı olarak adam saat değerleri ile ilgili bilgi toplanmıştır. İş ölçümü ve taşeron deneyimleri sonucu hesaplanan işgücü verimlilikleri Çevre ve Şehircilik Bakanlığı verileri ile karşılaştırılmıştır. Çalışma sonucunda, Çevre ve Şehircilik Bakanlığı verilerinin güncel teknolojiye göre revize edilmesi gerektiği sonucuna ulaşılmıştır.

Kaynakça

  • 1. Alboğa, Ö. (2019) Betonarme Binalarda İş Ölçümü ile Verimlilik Analizi Yapılması, Yüksek Lisans Tezi, Çukurova Üniversitesi.
  • 2. Aydın, M.K. (2019)http://www.mustafakemalaydin.com/wp-content/uploads/2014/08/Insaat_Projelerinde_Kalite_Yonetimi_Uygulamalari.pdf, Erişim tarihi: 15.08.2019, Konu: İnşaat Projelerinde Kalite Yönetimi Uygulamaları.
  • 3. Chuan,Q.T, Pheng,L.S. (2006)Enviromental Factors and Work Perfonmance of Project Managers in the Construction Industry, International Journal of Project Management, 24, 24-37. https://doi.org/10.1016/j.ijproman.2005.06.001
  • 4. Ghoddousi,P., Hosseini,M.R. (2012) A Survey Of The Factors Affectıng The Productivity Of Construction Projects in Iran, Technological And Economic Development of Economy, 18,1, 99–116. https://doi.org/10.3846/20294913.2012.661203
  • 5. https://portal.myk.gov.tr/index.php?option=com_meslek_std_taslak&view=taslak_listesi_yeni&msd=2, Erişim Tarihi:12.12.2019, Konu: Ulusal Meslek Standartları.
  • 6. http://disk.org.tr/wp-content/uploads/2019/02/DISK-AR-Krizde-Emeg%CC%86in-Durumu-Arastirmasi-SON.pdf , Erişim Tarihi: 18.12.2019, Konu: Krizde Emeği Durumu Araştırması.
  • 7. https://intes.org.tr/wp-content/uploads/2019/01/%C4%B0N%C5%9EAATSEKT%C3%96R%C3%9C-RAPORU.pdf , Erişim tarihi: 15.08.2019, Konu: İnşaat Sektörü Raporu (2019).
  • 8. http://intes.admind.com.tr/wp-content/uploads/2017/12/sayi_134.pdf, Erişim tarihi:16.08.2019, Konu: İnşaat Sanayi Dergisi, 2017 raporu.
  • 9. Ibroke,O.T., Oladinrin,T.O., Adeniyi,O., Eboreime,I.V. (2013) Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria Journal of Construction in Developing Countries, 18,1,53–72.
  • 10. Ikediashi,D.I., Ogunlana,S.O., Alotaibi,A. (2014) Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach, Journal of Construction in Developing Countries, 19,1,35–52.
  • 11. Karim,N.A., Hassan,S.H., Yunus,J.N., Hashim,M.Z. (2012) Factors Influence Labour Productivity and the Impacts on Construction Industry, Awam International Conference on Civil Engineering &Geohazard Information Zonation.MALEZYA.
  • 12. Kazaz, A.,Ulubeyli, S. (2004) A different approach to construction labour in Turkey: comparative productivity analysis,Building and Environment,39,93 – 100. https://doi.org/10.1016/j.buildenv.2003.08.004
  • 13. Kobu, B. (1998) Üretim Yönetimi, Beta Yayınları, İstanbul.
  • 14. Kuruoğlu,M., Bayoğlu,F.İ. (2001)Yapı Üretiminde Adam saat Değerlerinin Belirlenmesi Üzerine Bir Araştırma Ve Sonuçları. XVI İnşaat Mühendisliği Teknik Kongresi. ANKARA.
  • 15. Olaoluwua,O., Adesanya,D.A. (2015) Productivity of Concrete Placement by Dumpers in Nigeria, International Journal of Engineering Research and Development ,11, 03,15-28. http://dx.doi.org/10.7492/IJAEC.2015.004
  • 16. Oral,E., Mıstıkoğlu,G., Tufan,D. (2006)Zaman Etüdü İle Yapım İşlerinde Adam Saat Değerlerinin Belirlenmesi.7.Uluslararası İnşaat Mühendisliğinde Gelişmeler Kongresi,İstanbul.
  • 17. Oral, M., Oral, E., Aydın, A. (2011) Supervised vs. Unsupervised Learning for Construction Crew Productivity Prediction,Automation in Construction,22,271-276.doi:10.1016/j.autcon.2011.09.002
  • 18. Öcal,M.E, Tat,A., Erdiş,E. (2005) Bayındırlık İşleri Birim Fiyat Analizlerindeki İşgücü Verimliliklerinin İncelenmesi.3.Yapı Kongresi,İzmir.
  • 19. REFA. (1985) İş Etüdü ve Yöntem Bilgisi. Cilt:1-2-3, MPM Yayınları, Yayın no: 544, Ankara.
  • 20. Shehata,M.E., El-Gohary,K.M. (2011) Towards improving construction labor productivity and projects’ performance,Alexandria Engineering Journal,50,321–330. doi:10.1016/j.aej.2012.02.001
  • 21. Tat, A. (2000) Bayındırlık İşleri Birim Fiyat Analizlerindeki İşgücü ve Makine Gücü Verimliliklerinin İrdelenmesi, Yüksek Lisans Tezi, Çukurova Üniversitesi.
  • 22. Tufan, D. (2007) Bina İnşaatlarında Adam Saat Değerlerinin Belirlenmesi Üzerine Bir Uygulama Örneği, Yüksek Lisans Tezi, Mustafa Kemal Üniversitesi.
  • 23. Ulubeyli, S., Kazaz, A., Er, B. (2014) Planning Engineers’ Estimates on Labor Productivity: Theory and Practice, Procedia- Social and Behavioral Sciences, 119 ,12 – 19. https://doi.org/10.1016/j.sbspro.2014.03.004
Toplam 23 adet kaynakça vardır.

Ayrıntılar

Birincil Dil Türkçe
Konular İnşaat Mühendisliği
Bölüm Araştırma Makaleleri
Yazarlar

Özge Alboğa 0000-0002-2848-8373

Gözde Tantekin Çelik 0000-0002-0045-4489

Yayımlanma Tarihi 30 Nisan 2020
Gönderilme Tarihi 20 Kasım 2019
Kabul Tarihi 25 Ocak 2020
Yayımlandığı Sayı Yıl 2020

Kaynak Göster

APA Alboğa, Ö., & Tantekin Çelik, G. (2020). BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi, 25(1), 391-404. https://doi.org/10.17482/uumfd.649299
AMA Alboğa Ö, Tantekin Çelik G. BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ. UUJFE. Nisan 2020;25(1):391-404. doi:10.17482/uumfd.649299
Chicago Alboğa, Özge, ve Gözde Tantekin Çelik. “BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ”. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi 25, sy. 1 (Nisan 2020): 391-404. https://doi.org/10.17482/uumfd.649299.
EndNote Alboğa Ö, Tantekin Çelik G (01 Nisan 2020) BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi 25 1 391–404.
IEEE Ö. Alboğa ve G. Tantekin Çelik, “BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ”, UUJFE, c. 25, sy. 1, ss. 391–404, 2020, doi: 10.17482/uumfd.649299.
ISNAD Alboğa, Özge - Tantekin Çelik, Gözde. “BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ”. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi 25/1 (Nisan 2020), 391-404. https://doi.org/10.17482/uumfd.649299.
JAMA Alboğa Ö, Tantekin Çelik G. BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ. UUJFE. 2020;25:391–404.
MLA Alboğa, Özge ve Gözde Tantekin Çelik. “BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ”. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi, c. 25, sy. 1, 2020, ss. 391-04, doi:10.17482/uumfd.649299.
Vancouver Alboğa Ö, Tantekin Çelik G. BETONARME BİNA İNŞAATLARINDA VERİMLİLİK ANALİZİ. UUJFE. 2020;25(1):391-404.

DUYURU:

30.03.2021- Nisan 2021 (26/1) sayımızdan itibaren TR-Dizin yeni kuralları gereği, dergimizde basılacak makalelerde, ilk gönderim aşamasında Telif Hakkı Formu yanısıra, Çıkar Çatışması Bildirim Formu ve Yazar Katkısı Bildirim Formu da tüm yazarlarca imzalanarak gönderilmelidir. Yayınlanacak makalelerde de makale metni içinde "Çıkar Çatışması" ve "Yazar Katkısı" bölümleri yer alacaktır. İlk gönderim aşamasında doldurulması gereken yeni formlara "Yazım Kuralları" ve "Makale Gönderim Süreci" sayfalarımızdan ulaşılabilir. (Değerlendirme süreci bu tarihten önce tamamlanıp basımı bekleyen makalelerin yanısıra değerlendirme süreci devam eden makaleler için, yazarlar tarafından ilgili formlar doldurularak sisteme yüklenmelidir).  Makale şablonları da, bu değişiklik doğrultusunda güncellenmiştir. Tüm yazarlarımıza önemle duyurulur.

Bursa Uludağ Üniversitesi, Mühendislik Fakültesi Dekanlığı, Görükle Kampüsü, Nilüfer, 16059 Bursa. Tel: (224) 294 1907, Faks: (224) 294 1903, e-posta: mmfd@uludag.edu.tr