ZAMAN MALİYET ÖDÜNLEŞİM PROBLEMİNİN EN AZ İNSAN MÜDAHALESİ İLE OLUŞTURULUP ÇÖZÜLMESİ
Abstract
Keywords
References
- Abdel-Basset, M., Ali, M., & Atef, A. (2020). Uncertainty assessments of linear time-cost tradeoffs using neutrosophic set. Computers & Industrial Engineering, 141, 10.1016/j.cie.2020.106286.
- Afruzi, E. N.,Najafi, A. A., Roghanian, E., ve Mazinani, M. (2014). “A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations.” Computers and Operations Research, Vol. 50, pp. 80-96, doi: 10.1016/j.cor.2014.04.003.
- Al-Shihabi, S., ve AlDurgam, M. M. (2020). “The contractor time–cost–credittrade-off problem: integer programming model, heuristic solution, and business insights.” International Transactions in Operational Research, doi:10.1111/itor.12764.
- Albayrak, G. (2020). Novel Hybrid Method in Time–Cost Trade-Offf or Resource-Constrained Construction Projects. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 44(4), 1295-1307, doi.org/10.1007/s40996-020-00437-2.
- Ammar, M. (2011). Optimization of project time-cost trade-off problem with discounted cashflows. Journal of Construction Engineering and Management, 137 (1), pp.65-71, doi: 10.1061/ASCECO.1943-7862.0000256.
- Anagnostopoulos, K. P. ve Kotsikas, L. (2010). “Experimental evaluation of simulated annealing algorithms for the time–cost trade-off problem.” Applied Mathematics and Computation, Vol. 217, No. 1, pp. 260-270, DOI: 10.1016/j.amc.2010.05.056.
- Banihashemi, S. A., ve Khalilzadeh, M. (2020). Time-cost-quality-environmental impact trade-off resource-constrained Project scheduling problem with DEA approach. Engineering, Construction and Architectural Management, doi: 10.1108/ECAM-05-2020-0350.
- Barber, T. J. ve Boardman, J. T. (1988). “Knowledge–based project control employing heuristic optimisation.” IEE Proceedings, Vol. 135, No. 8, pp. 529-538, DOI: 10.1049/ip-a-1.1988.0083.
Details
Primary Language
Turkish
Subjects
Civil Engineering
Journal Section
Research Article
Publication Date
August 31, 2021
Submission Date
January 27, 2021
Acceptance Date
July 2, 2021
Published in Issue
Year 2021 Volume: 26 Number: 2
Cited By
Scheduling, Management and Optimization of Construction Process
Teknik Dergi
https://doi.org/10.18400/tekderg.981601Yüksek doğrulukta kaba inşaat kalemlerinin metrajını hesaplayan YBM tabanlı prototip yazılımın geliştirilmesi
Gümüşhane Üniversitesi Fen Bilimleri Enstitüsü Dergisi
https://doi.org/10.17714/gumusfenbil.1117848Tek katlı Kırsal Bölge Yapısının Gömülü Enerji ve Karbon Salınımının Analizi
Journal of Polytechnic
https://doi.org/10.2339/politeknik.1207484Development of ontological algorithms for exact QTO of reinforced concrete construction items
Structures
https://doi.org/10.1016/j.istruc.2024.105907INFLUENCE OF JUMPING RATE ON OPPOSITION-BASED JAYA ALGORITHM FOR DISCRETE TIME COST TRADE-OFF OPTIMIZATION PROBLEMS
Uludağ University Journal of The Faculty of Engineering
https://doi.org/10.17482/uumfd.1561366