ZAMAN MALİYET ÖDÜNLEŞİM PROBLEMİNİN EN AZ İNSAN MÜDAHALESİ İLE OLUŞTURULUP ÇÖZÜLMESİ
Öz
Anahtar Kelimeler
Kaynakça
- Abdel-Basset, M., Ali, M., & Atef, A. (2020). Uncertainty assessments of linear time-cost tradeoffs using neutrosophic set. Computers & Industrial Engineering, 141, 10.1016/j.cie.2020.106286.
- Afruzi, E. N.,Najafi, A. A., Roghanian, E., ve Mazinani, M. (2014). “A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations.” Computers and Operations Research, Vol. 50, pp. 80-96, doi: 10.1016/j.cor.2014.04.003.
- Al-Shihabi, S., ve AlDurgam, M. M. (2020). “The contractor time–cost–credittrade-off problem: integer programming model, heuristic solution, and business insights.” International Transactions in Operational Research, doi:10.1111/itor.12764.
- Albayrak, G. (2020). Novel Hybrid Method in Time–Cost Trade-Offf or Resource-Constrained Construction Projects. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 44(4), 1295-1307, doi.org/10.1007/s40996-020-00437-2.
- Ammar, M. (2011). Optimization of project time-cost trade-off problem with discounted cashflows. Journal of Construction Engineering and Management, 137 (1), pp.65-71, doi: 10.1061/ASCECO.1943-7862.0000256.
- Anagnostopoulos, K. P. ve Kotsikas, L. (2010). “Experimental evaluation of simulated annealing algorithms for the time–cost trade-off problem.” Applied Mathematics and Computation, Vol. 217, No. 1, pp. 260-270, DOI: 10.1016/j.amc.2010.05.056.
- Banihashemi, S. A., ve Khalilzadeh, M. (2020). Time-cost-quality-environmental impact trade-off resource-constrained Project scheduling problem with DEA approach. Engineering, Construction and Architectural Management, doi: 10.1108/ECAM-05-2020-0350.
- Barber, T. J. ve Boardman, J. T. (1988). “Knowledge–based project control employing heuristic optimisation.” IEE Proceedings, Vol. 135, No. 8, pp. 529-538, DOI: 10.1049/ip-a-1.1988.0083.
Ayrıntılar
Birincil Dil
Türkçe
Konular
İnşaat Mühendisliği
Bölüm
Araştırma Makalesi
Yayımlanma Tarihi
31 Ağustos 2021
Gönderilme Tarihi
27 Ocak 2021
Kabul Tarihi
2 Temmuz 2021
Yayımlandığı Sayı
Yıl 2021 Cilt: 26 Sayı: 2
Cited By
Scheduling, Management and Optimization of Construction Process
Teknik Dergi
https://doi.org/10.18400/tekderg.981601Yüksek doğrulukta kaba inşaat kalemlerinin metrajını hesaplayan YBM tabanlı prototip yazılımın geliştirilmesi
Gümüşhane Üniversitesi Fen Bilimleri Enstitüsü Dergisi
https://doi.org/10.17714/gumusfenbil.1117848Tek katlı Kırsal Bölge Yapısının Gömülü Enerji ve Karbon Salınımının Analizi
Journal of Polytechnic
https://doi.org/10.2339/politeknik.1207484Development of ontological algorithms for exact QTO of reinforced concrete construction items
Structures
https://doi.org/10.1016/j.istruc.2024.105907INFLUENCE OF JUMPING RATE ON OPPOSITION-BASED JAYA ALGORITHM FOR DISCRETE TIME COST TRADE-OFF OPTIMIZATION PROBLEMS
Uludağ University Journal of The Faculty of Engineering
https://doi.org/10.17482/uumfd.1561366