COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS

Volume: 2 Number: 2 October 19, 2016
EN

COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS

Abstract

This proposal concentrates on applications of project management models and techniques in new product development practices (NPD) in IT. After analyzing implementation of various models and techniques in IT, detailed research was performed for NPD practices in IT. Specific techniques were compared through a questionnaire and real world applications. Results revealed limitations of traditional techniques such as (PERT/CPM) and Critical Chain Project Management’s (CCPM) potential of overcoming these limitations. However, depending on CCPM’s some shortcomings recommendations to improve CCPM were also proposed.

Keywords: Project Management, IT, CCPM, Software Development

References

  1. Blackstone Jr, J. H., Cox III, J. F. and Schleier Jr, J. G. (2009). A tutorial on project management from a theory of constraints perspective. International Journal of Production Research, 47(24): 7029-7046.
  2. Brandt, D.R. (2003). A new vision for project management. Cutter IT Journal, 16(3): 19-23.
  3. Burke, R. (2003). Project Management Planning and Control Techniques. 4th edn. Norfolk: Bidless Ltd.
  4. Buyukozkan, G. and Feyzioglu,O. (2004). A new approach based on soft computing to accelerate the selection of new product ideas. Computers in Industry, 54(2): 151-167.
  5. Chiang, T., Trappey, A.J.C. and Chen,W. (2008). Benchmark new product development processes using DEA-based modularized approach. Issues in Information Systems, 9(2): 153-162.
  6. Danilovic, M. and Browning, T.R. (2007). Managing complex product development projects with design structure matrices and domain mapping matrices. International journal of project management, 25(3): 300-314.
  7. Dilmaghani, F. (2008). Critical Chain Project Management (CCPM) at Bosch Security Systems Eindhoven. Master thesis. University of Twente.
  8. Gelbwaks, M. (2003). Segway and an Agile Chain. Cutter IT Journal, 16(3): 24-28.

Details

Primary Language

Turkish

Subjects

-

Journal Section

-

Publication Date

October 19, 2016

Submission Date

October 18, 2016

Acceptance Date

-

Published in Issue

Year 2016 Volume: 2 Number: 2

APA
Alma, B., Coşkun, E., & Uğur, N. G. (2016). COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS. Yönetim Bilişim Sistemleri Dergisi, 2(2), 202-212. https://izlik.org/JA29NE68GW
AMA
1.Alma B, Coşkun E, Uğur NG. COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS. Yönetim Bilişim Sistemleri Dergisi. 2016;2(2):202-212. https://izlik.org/JA29NE68GW
Chicago
Alma, Büşra, Erman Coşkun, and Naciye Güliz Uğur. 2016. “COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS”. Yönetim Bilişim Sistemleri Dergisi 2 (2): 202-12. https://izlik.org/JA29NE68GW.
EndNote
Alma B, Coşkun E, Uğur NG (October 1, 2016) COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS. Yönetim Bilişim Sistemleri Dergisi 2 2 202–212.
IEEE
[1]B. Alma, E. Coşkun, and N. G. Uğur, “COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS”, Yönetim Bilişim Sistemleri Dergisi, vol. 2, no. 2, pp. 202–212, Oct. 2016, [Online]. Available: https://izlik.org/JA29NE68GW
ISNAD
Alma, Büşra - Coşkun, Erman - Uğur, Naciye Güliz. “COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS”. Yönetim Bilişim Sistemleri Dergisi 2/2 (October 1, 2016): 202-212. https://izlik.org/JA29NE68GW.
JAMA
1.Alma B, Coşkun E, Uğur NG. COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS. Yönetim Bilişim Sistemleri Dergisi. 2016;2:202–212.
MLA
Alma, Büşra, et al. “COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS”. Yönetim Bilişim Sistemleri Dergisi, vol. 2, no. 2, Oct. 2016, pp. 202-1, https://izlik.org/JA29NE68GW.
Vancouver
1.Büşra Alma, Erman Coşkun, Naciye Güliz Uğur. COMPARISON OF TRADITIONAL PROJECT MANAGEMENT TECHNIQUES AND CRITICAL CHAIN PROJECT MANAGEMENT FOR MANAGEMENT OF INFORMATION TECHNOLOGY AND INFORMATION SYSTEM PROJECTS. Yönetim Bilişim Sistemleri Dergisi [Internet]. 2016 Oct. 1;2(2):202-1. Available from: https://izlik.org/JA29NE68GW