Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling

Cilt: 11 Sayı: 24 31 Aralık 2024
PDF İndir
EN TR

Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling

Abstract

The optimization of schedules for repetitive projects is a crucial phase in establishing an effective project timeline concerning both duration and cost. This study presents an innovative metaheuristic multi-objective optimization model tailored for repetitive projects. Distinguished by its original features, this model empowers schedulers to identify an optimal schedule that concurrently minimizes project duration, total cost, and interruption time. It encompasses various constraints and factors, including learning and forgetting effects, inter-activity soft logic, limited work interruption allowances, multiple crew formations, multiple construction methods per activity, while retaining all Critical Path Method (CPM) scheduling capabilities. The effectiveness of this new approach was validated through application to two case studies, demonstrating its capability to deliver optimal schedules for repetitive projects with heightened accuracy in minimizing project duration, cost, and interruption. Furthermore, the integration of learning effects, soft logic, and work interruption allowances within the optimization process substantially reduced project duration and cost, thereby yielding more precise and dependable optimal solutions.

Keywords

Learning effect , optimization , project planning , repetitive projets , soft logic

Kaynakça

  1. Monghasemi S, Abdallah M. Linear optimization model to minimize total cost of repetitive construction projects and identify order of units. Journal of Management in Engineering ASCE 2021; 37(4).
  2. Zou X, Zhang L. A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic. Automation in Construction 2020; 109.
  3. Arditi D, Tokdemir O, Suh K. Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management 2002; 128(6): 545-556.
  4. Johnston DW. Linear scheduling method for highway construction. Journal of the Construction Division ASCE 1981; 107(2): 247-261.
  5. Arditi D, Albulak M. Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management ASCE 1986; 112(3): 411-424.
  6. Okudan O, Çevikbaş M, Işık Z. An exploratory study on the critical features of construction project planning software. Sigma Journal of Engineering and Natural Sciences 2023; 41(4): 781-792.
  7. Zhang L, Zou X. Chapter 6 - Resource-constrained scheduling in repetitive construction projects. Repetitive Project Scheduling: Theory and Methods, Elsevier 2015; 71-85.
  8. Zou X, Zhang L, Zhang Q. A biobjective optimization model for deadline satisfaction in line-of- balance scheduling with work interruptions consideration. Mathematical Problems in Engineering 2018; Article ID 6534021.
  9. Fan S, Sun K, Wang Y. GA optimization model for repetitive projects with soft logic. Automation in Construction 2012; 21: 253-261.
  10. Tamimi S, Diekmann J. Soft logic in network analysis. Journal of Computing in Civil Engineering 1988; 2(3): 289-300.

Kaynak Göster

APA
Albayrak, G. (2024). Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi, 11(24), 438-454. https://doi.org/10.54365/adyumbd.1477358
AMA
1.Albayrak G. Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi. 2024;11(24):438-454. doi:10.54365/adyumbd.1477358
Chicago
Albayrak, Gülçağ. 2024. “Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling”. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi 11 (24): 438-54. https://doi.org/10.54365/adyumbd.1477358.
EndNote
Albayrak G (01 Aralık 2024) Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi 11 24 438–454.
IEEE
[1]G. Albayrak, “Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling”, Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi, c. 11, sy 24, ss. 438–454, Ara. 2024, doi: 10.54365/adyumbd.1477358.
ISNAD
Albayrak, Gülçağ. “Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling”. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi 11/24 (01 Aralık 2024): 438-454. https://doi.org/10.54365/adyumbd.1477358.
JAMA
1.Albayrak G. Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi. 2024;11:438–454.
MLA
Albayrak, Gülçağ. “Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling”. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi, c. 11, sy 24, Aralık 2024, ss. 438-54, doi:10.54365/adyumbd.1477358.
Vancouver
1.Gülçağ Albayrak. Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling. Adıyaman Üniversitesi Mühendislik Bilimleri Dergisi. 01 Aralık 2024;11(24):438-54. doi:10.54365/adyumbd.1477358