Metaheuristic Multi-Objective Optimization Approach for Repetitive Construction Project Scheduling
Abstract
Keywords
Learning effect , optimization , project planning , repetitive projets , soft logic
Kaynakça
- Monghasemi S, Abdallah M. Linear optimization model to minimize total cost of repetitive construction projects and identify order of units. Journal of Management in Engineering ASCE 2021; 37(4).
- Zou X, Zhang L. A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic. Automation in Construction 2020; 109.
- Arditi D, Tokdemir O, Suh K. Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management 2002; 128(6): 545-556.
- Johnston DW. Linear scheduling method for highway construction. Journal of the Construction Division ASCE 1981; 107(2): 247-261.
- Arditi D, Albulak M. Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management ASCE 1986; 112(3): 411-424.
- Okudan O, Çevikbaş M, Işık Z. An exploratory study on the critical features of construction project planning software. Sigma Journal of Engineering and Natural Sciences 2023; 41(4): 781-792.
- Zhang L, Zou X. Chapter 6 - Resource-constrained scheduling in repetitive construction projects. Repetitive Project Scheduling: Theory and Methods, Elsevier 2015; 71-85.
- Zou X, Zhang L, Zhang Q. A biobjective optimization model for deadline satisfaction in line-of- balance scheduling with work interruptions consideration. Mathematical Problems in Engineering 2018; Article ID 6534021.
- Fan S, Sun K, Wang Y. GA optimization model for repetitive projects with soft logic. Automation in Construction 2012; 21: 253-261.
- Tamimi S, Diekmann J. Soft logic in network analysis. Journal of Computing in Civil Engineering 1988; 2(3): 289-300.