Araştırma Makalesi

Risk analysis and prioritization of irregular order arrivals

Cilt: 1 Sayı: 1 30 Haziran 2018
PDF İndir
TR EN

Risk analysis and prioritization of irregular order arrivals

Abstract

Production is at the top of the functions that will ensure the continuity of the company. Hence, irregular orders are a major problem for companies. In this study, the main reasons for the irregular order arrivals for a production company are determined; risks that might possibly arise from those reasons are analyzed with Failure Mode and Effects Analysis (FMEA) and same risks are prioritized with Analytical Hierarchy Process (AHP) to compare and validate results. As a result of the study, the type of error / factor which is the risk priority for the operation has been determined and preventive activities are determined.  As a result of the AHP,  parameters that have same risk scores are separated and determined that market transactions, customer satisfaction and job shop production are the most important parameters that effect irregularity.

Keywords

Kaynakça

  1. [1] Aguiar, D. C., Souza, H. J. C., Salomon, V. A. (2010). AHP Application to Evaluate Scoring Criteria for Failure Mode and Effect Analysis (FMEA). International Journal of Analytic Hierarchy Process, 2, 3-13.
  2. [2] Abdelgawad, M., Fayek, A. R. (2010). Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Management, 136(9), 1028-1036.
  3. [3] Öztürk, A., Erdoğmuş, Ş., Arıkan, V. S. (2013). Analitik Hiyerarsi Süreci (Ahs) Kullanılarak Tedarikçilerin Degerlendirilmesi: Bir Tekstil Firmasında Uygulama. Dokuz Eylül Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, 26(1).
  4. [4] Sofyalioğlu, Ç., Öztürk, Ş. (2012). Application of grey relational analysis with fuzzy AHP to FMEA method. Doğuş Üniversitesi Dergisi, 13(1), 114-130.
  5. [5] Özyazgan, V., Engin, F. Z. (2013). FMEA Analysis and Applications in Knitting Industry. Journal of Textile & Apparel/Tekstil ve Konfeksiyon, 23(3).
  6. [6] Özyazgan, V. (2014). FMEA Analysis And Implementation In A Textile Factory Producing Woven Fabrıc. Journal of Textile & Apparel/Tekstil ve Konfeksiyon, 24(3).
  7. [7] Türedi, A. T., Bircan, D. A. (2016). Endüstriyel Robotik Otomasyon Sistemlerinde Görülen Hataların Ve Sistem Güvenilirliğinin Hata Türleri Ve Etkileri Yöntemi İle Analizi. Engineer & the Machinery Magazine, (672).
  8. [8] Çakır, E. (2016). Kısmi Zamanlı Olarak Çalışacak Öğrencilerin Analitik Hiyerarşi Prosesi Temelli Vıkor Yöntemi İle Belirlenmesi. Uluslararası Yönetim İktisat ve İşletme Dergisi, 12(29), 195-224.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yazarlar

Büşra Bozdemir Bu kişi benim

Yayımlanma Tarihi

30 Haziran 2018

Gönderilme Tarihi

4 Haziran 2018

Kabul Tarihi

25 Haziran 2018

Yayımlandığı Sayı

Yıl 2018 Cilt: 1 Sayı: 1

Kaynak Göster

APA
Oturakçı, M., & Bozdemir, B. (2018). Risk analysis and prioritization of irregular order arrivals. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi, 1(1), 9-17. https://izlik.org/JA63MS24SL
AMA
1.Oturakçı M, Bozdemir B. Risk analysis and prioritization of irregular order arrivals. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi. 2018;1(1):9-17. https://izlik.org/JA63MS24SL
Chicago
Oturakçı, Murat, ve Büşra Bozdemir. 2018. “Risk analysis and prioritization of irregular order arrivals”. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi 1 (1): 9-17. https://izlik.org/JA63MS24SL.
EndNote
Oturakçı M, Bozdemir B (01 Haziran 2018) Risk analysis and prioritization of irregular order arrivals. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi 1 1 9–17.
IEEE
[1]M. Oturakçı ve B. Bozdemir, “Risk analysis and prioritization of irregular order arrivals”, Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi, c. 1, sy 1, ss. 9–17, Haz. 2018, [çevrimiçi]. Erişim adresi: https://izlik.org/JA63MS24SL
ISNAD
Oturakçı, Murat - Bozdemir, Büşra. “Risk analysis and prioritization of irregular order arrivals”. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi 1/1 (01 Haziran 2018): 9-17. https://izlik.org/JA63MS24SL.
JAMA
1.Oturakçı M, Bozdemir B. Risk analysis and prioritization of irregular order arrivals. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi. 2018;1:9–17.
MLA
Oturakçı, Murat, ve Büşra Bozdemir. “Risk analysis and prioritization of irregular order arrivals”. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi, c. 1, sy 1, Haziran 2018, ss. 9-17, https://izlik.org/JA63MS24SL.
Vancouver
1.Murat Oturakçı, Büşra Bozdemir. Risk analysis and prioritization of irregular order arrivals. Artıbilim: Adana Bilim ve Teknoloji Üniversitesi Fen Bilimleri Dergisi [Internet]. 01 Haziran 2018;1(1):9-17. Erişim adresi: https://izlik.org/JA63MS24SL