Risk Management Maturity, Contract Provisions and Project Success: An Integrated Assessment for the Turkish Construction Sector
Öz
Anahtar Kelimeler
Etik Beyan
Kaynakça
- Cameron, K. S. (1986). Effectiveness as paradox: Consensus and conflict in conceptions of organizational effectiveness. Management Science, 32(5), 539–553. https://doi.org/10.1287/mnsc.32.5.539
- DeCotiis, T. A., & Dyer, L. (1979). Defining and measuring project performance. Research Management, 22(1), 17–22. https://doi.org/10.1080/00345334.1979.11756525
- Dvir, D., & Shenhar, A. J. (1992). Measuring the success of technology-based strategic business units. Engineering Management Journal, 4(4), 33–38. https://doi.org/10.1080/10429244.1992.11414698
- Dvir, D., Segev, E., & Shenhar, A. J. (1993). Technology's varying impact on the success of strategic business units within the Miles and Snow typology. Strategic Management Journal, 14(2), 155–162. https://doi.org/10.1002/smj.4250140206
- Hillson, D. (2002). Extending the risk process to manage opportunities. International Journal of Project Management, 20(3), 235–240. https://doi.org/10.1016/S0263-7863(01)00074-6
- Hillson, D. (2019). Modifying the IACCM capability maturity model for risk. PM World Journal, 8(6).
- Hopkinson, M. (2014). The project management maturity model: Measuring and improving risk management capability. Gower Publishing.
- Ittner, C. D., & Larcker, D. F. (1997). Product development cycle time and organizational performance. Journal of Marketing Research, 34(1), 13–23. https://doi.org/10.1177/002224379703400102
Ayrıntılar
Birincil Dil
İngilizce
Konular
İnşaat Mühendisliği (Diğer)
Bölüm
Araştırma Makalesi
Yazarlar
Ayşe Zeynep Sözen
Bu kişi benim
0000-0002-5518-2695
Türkiye
Erken Görünüm Tarihi
12 Ocak 2026
Yayımlanma Tarihi
12 Ocak 2026
Gönderilme Tarihi
16 Temmuz 2025
Kabul Tarihi
3 Ocak 2026
Yayımlandığı Sayı
Yıl 2026 Cilt: 9 Sayı: 1