EVALUATING SURROGATE MEASURES OF CONSTRUCTION PROJECT SCHEDULE ROBUSTNESS
Abstract
Keywords
Kaynakça
- Al-Fawzan, M.A., Haouari, M. (2005), „A bi-objective model for robust resource- constrained project scheduling”, International Journal of Production Economics, Vol. 96, No. 2, pp. 175-187.
- Chtourou, H., Haouari, M. (2008), „A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling”, Computers & Industrial
- Engineering, Vol. 55, No. 1, pp. 183-194. Goren, S., Sabuncuoglu, I. (2008), „Robustness and stability measures for scheduling: single machine environment”, IIE Transactions, Vol. 40, No. 1, pp. 83.
- Hazir, Ö., Haouari, M., Erel, E. (2010), „Robust scheduling and robustness measures for the discrete time/cost tade-off problem”, European Journal of
- Operational Research, Vol. 201, No. 2, pp. 633-643. Kobylański, P., Kuchta, D. (2007), „A note on the paper by M.A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling”, International Journal of Production Economics, Vol. 107, No. 2, pp. 501.
- Lambrechts, O., Demeulemeester, E. Herroelen, W. (2008), „A tabu search procedure for developing robust predictive project schedules”, International
- Journal of Production Economics, Vol. 111, No. 2, pp. 493-508. Schatteman, D., Herroelen, W., Van de Vonder, S., Boone, A. (2008),
- „Methodology for integrated risk management and proactive scheduling of construction projects”, Journal of Construction Engineering and Management, Vol. 134, No. 11, pp. 885-893. Van de Vonder, S., Demeulemeester, E., Leus, R., Herroelen, W. (2005), „The use buffers in project management: The trade–off between stability and makespan”,
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
-
Yazarlar
Piotr Jaskowski
Bu kişi benim
Slawomir Biruk
Bu kişi benim
Agata Czarnigowska
Bu kişi benim
Yayımlanma Tarihi
1 Aralık 2011
Gönderilme Tarihi
1 Aralık 2011
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2011 Cilt: 3 Sayı: 2