Araştırma Makalesi

Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state

Cilt: 10 Sayı: 2 26 Haziran 2025
PDF İndir
EN

Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state

Abstract

Hydropower remains a cornerstone of renewable energy, yet small-scale plants in developing regions often underperform due to suboptimal design and outdated optimization approaches. This study addresses these limitations by developing a novel dual-objective optimization framework for the Challawa Gorge Dam in Kano State, Nigeria, leveraging Sequential Quadratic Programming (SQP) to simultaneously maximize power output and minimize water consumption. Using MATLAB-based simulations integrated with Monte Carlo flow analysis, we optimize penstock design, turbine selection, and operational parameters under real-world constraints (cavitation index σ > 0.12, surge pressure < 5% gross head). Our results demonstrate a 19.8% increase in power generation (5.73 MW achieved) alongside a 12.1% reduction in water usage (8.79 m3/s), outperforming conventional Particle Swarm Optimization (PSO) methods by 15.3% in efficiency. This work provides both a technical roadmap for sustainable hydropower expansion and actionable insights for policymakers targeting Nigeria’s 2030 renewable energy goals.

Keywords

Kaynakça

  1. [1] Delbeke, J. Artur, R.M. Yvon, S., Jake, W. The Paris Agreement. Towards a Climate-Neutral Europe: Curbing the Trend 2019; 24–45.
  2. [2] Dombrovski, R. Managing Emerging Technologies for Socio-Economic Impact. Renewable Energy Policies for Eco-Innovation 2015.
  3. [3] Uyar, T.S., Doğancan, B. Integration of Hydrogen Energy Systems into Renewable Energy Systems for Better Design of 100% Renewable Energy Communities. International Journal of Hydrogen Energy 2017; 42(4): 2453–2456.
  4. [4] Jacobson, M.Z. et al., 100% Clean and Renewable Wind, Water, and Sunlight (WWS) All-Sector Energy Roadmaps for 53 Towns and Cities in North America. Sustainable Cities and Society 2018; 42: 22–37.
  5. [5] Mao, G. Wang, S. Tenq, Q. Zuo, J. Tan, X. Wang, H. Liu, Z. The sustainable future of hydropower: A critical analysis of cooling units via the Theory of inventive problem solving and life cycle assessment methods. Journal of Cleaner Products 2017; 142(4): 2446–2453.
  6. [6] Demarty, M. Bastien, J. GHG emissions from hydroelectric reservoirs in tropical and equatorial regions: Review of 20 years of CH4 emission measurements. Energy Policy 2011; 39: 4197–4206.
  7. [7] Dursun, B. Gokcol, C. The role of hydroelectric power and contribution of small hydropower plants for sustainable development in Turkey. Renewable Energy 2011; 36(4): 1227–1235.
  8. [8] ESHA. Guide on How to Develop a Small Hydropower Plant. 2004.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Hidroelektrik Enerji Sistemleri

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

26 Haziran 2025

Gönderilme Tarihi

24 Ocak 2025

Kabul Tarihi

30 Mayıs 2025

Yayımlandığı Sayı

Yıl 2025 Cilt: 10 Sayı: 2

Kaynak Göster

APA
Muhammad, J. Y. (2025). Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state. International Journal of Energy Studies, 10(2), 549-567. https://doi.org/10.58559/ijes.1626281
AMA
1.Muhammad JY. Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state. International Journal of Energy Studies. 2025;10(2):549-567. doi:10.58559/ijes.1626281
Chicago
Muhammad, Jamilu Ya’u. 2025. “Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state”. International Journal of Energy Studies 10 (2): 549-67. https://doi.org/10.58559/ijes.1626281.
EndNote
Muhammad JY (01 Haziran 2025) Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state. International Journal of Energy Studies 10 2 549–567.
IEEE
[1]J. Y. Muhammad, “Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state”, International Journal of Energy Studies, c. 10, sy 2, ss. 549–567, Haz. 2025, doi: 10.58559/ijes.1626281.
ISNAD
Muhammad, Jamilu Ya’u. “Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state”. International Journal of Energy Studies 10/2 (01 Haziran 2025): 549-567. https://doi.org/10.58559/ijes.1626281.
JAMA
1.Muhammad JY. Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state. International Journal of Energy Studies. 2025;10:549–567.
MLA
Muhammad, Jamilu Ya’u. “Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state”. International Journal of Energy Studies, c. 10, sy 2, Haziran 2025, ss. 549-67, doi:10.58559/ijes.1626281.
Vancouver
1.Jamilu Ya’u Muhammad. Optimal sizing of small hydroelectric power plant: a case study of Challawa Gorge dam, Kano state. International Journal of Energy Studies. 01 Haziran 2025;10(2):549-67. doi:10.58559/ijes.1626281