Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment
Öz
Aggregate production planning (APP) requires balancing workforce and operational decisions over a medium-term horizon. This study formulates and applies a two-stage stochastic mixed integer linear program (MILP) for APP with the primary objective of evaluating strategic workforce planning decisions under demand uncertainty. Workforce decisions are modeled as here-and-now commitments, while operational decisions are optimized as recourse actions in response to realized demand. The framework is demonstrated in an illustrative furniture manufacturing setting over a 12-month horizon with seasonally varying cost parameters. Demand scenarios are generated by combining Holt–Winters point forecasts with forecast-error scenarios obtained through a rolling-origin procedure and a moment-matching approach, yielding demand trajectories that reflect the statistical properties and temporal dependence of forecast uncertainty. Using these scenarios, the model quantifies cost–service trade-offs under alternative backorder penalty severities. To assess the robustness of the resulting workforce plans, this study conducts an out-of-sample evaluation based on observed demand from a holdout year and a wait-and-see benchmark, a validation perspective that has received limited attention in the APP literature. The out-of-sample results indicate that the stochastic model produces feasible and cost-effective workforce decisions that remain near-optimal under observed demand. Overall, the proposed framework serves as an effective decision-support tool for APP under demand uncertainty, supporting the evaluation of workforce and operational decisions within a unified stochastic framework.
Anahtar Kelimeler
Kaynakça
- [1] J. E. Gómez-Rocha, E. S. Hernández-Gress, and H. Rivera-Gómez, "Production planning of a furniture manufacturing company with random demand and production capacity using stochastic programming," (in English), Plos One, vol. 16, no. 6, Jun 14 2021, doi: ARTN e025280110.1371/journal.pone.0252801.
- [2] Z. Y. Hu and G. P. Hu, "A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty," (in English), Int J Prod Econ, vol. 180, pp. 198–207, Oct 2016, doi: 10.1016/j.ijpe.2016.07.027.
- [3] F. J. D. Lina Gozali, Andri Tan Wijaya, "Production Planning and Control in Furniture Company at PT. Lion Metal Works," in Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, 2021.
- [4] V. F. Yu, H. C. Kao, F. Y. Chiang, and S. W. Lin, "Solving Aggregate Production Planning Problems: An Extended TOPSIS Approach," (in English), Appl Sci-Basel, vol. 12, no. 14, Jul 2022, doi: ARTN 694510.3390/app12146945.
- [5] S. C. H. Leung, Y. Wu, and K. K. Lai, "A stochastic programming approach for multi-site aggregate production planning," (in English), J Oper Res Soc, vol. 57, no. 2, pp. 123–132, Feb 2006, doi: 10.1057/palgrave.jors.2601988.
- [6] M. Schön, C. H. Dai, F. Herrmann, and T. Claus, "Resilient Multi-Site Aggregate Production Planning: A Stochastic Model," (in English), Commun Ecms, vol. 39, pp. 434–440, 2025. [Online]. Available:
://WOS:001572352000057. - [7] A. Karimi-Zare, G. H. Shakouri, A. Kazemi, and E. S. Kim, "Aggregate production planning and energy supply management in steel industry with an onsite energy generation system: A multi-objective robust optimization model," (in English), Int J Prod Econ, vol. 269, Mar 2024, doi: ARTN 10914910.1016/j.ijpe.2024.109149.
- [8] M. Modarres and E. Izadpanahi, "Aggregate production planning by focusing on energy saving: A robust optimization approach," (in English), J Clean Prod, vol. 133, pp. 1074–1085, Oct 1 2016, doi: 10.1016/j.jclepro.2016.05.133.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Endüstri Mühendisliği
Bölüm
Araştırma Makalesi
Yazarlar
Didem Sarı Ay
*
0000-0002-9403-9015
Türkiye
Erken Görünüm Tarihi
3 Mart 2026
Yayımlanma Tarihi
3 Mart 2026
Gönderilme Tarihi
1 Şubat 2026
Kabul Tarihi
20 Şubat 2026
Yayımlandığı Sayı
Yıl 2025 Cilt: 10 Sayı: 4