Araştırma Makalesi

IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY

Cilt: 40 Sayı: 1 30 Nisan 2020
  • Ceyhun Yılmaz
PDF İndir
TR EN

IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY

Öz

Geothermal power plants have been in operation for decades in many parts of the world. Different thermodynamic cycles can be used for producing power from geothermal resources. Binary cycle plants use the geothermal water from liquid-dominated resources at relatively low temperatures. These plants operate on a Rankine cycle with a binary working fluid (isobutane, pentane, isopentane, R-114, etc.) that has a low boiling temperature. A case study on an existing binary geothermal power plant is available in this study. Thermoeconomic performance evaluation and optimization of 2.7 MW binary organic Rankine cycle (ORC) design geothermal power plant in western Turkey is conducted using actual plant operating data, and potential improvements are identified. Afyon Geothermal Power Plant (AFJES) is thermodynamically modeled in a computer environment using current working parameters in a comprehensive way for the use of geothermal energy in electricity generation. Geothermal water temperature and mass flow rate of the plant are 110°C, and 150 kg/s, respectively. Energy and exergy efficiencies of the plant are calculated as 10.4% and 29.7%. The potential annual revenue of geothermal electricity is calculated to be 2,880,277 $/yr with a simple payback period of 3.36 years. The exergetic cost of the electricity from the plant is calculated as 0.0233 $/kWh. The optimized simple payback period and exergy cost of the electricity generated in the plant is calculated as 2.87 years and 0.0176 $/kWh, respectively.

Anahtar Kelimeler

Kaynakça

  1. Abusoglu, A. and Kanoglu, M., 2008, First and second law analysis of diesel engine powered cogeneration systems, Energy Conversion and Management, 49(8), 2026-2031.
  2. Aksoy, N., 2014, Power generation from geothermal resources in Turkey, Renewable Energy, 68, 595-601. Aspen Plus Software, 2015, Aspen Technology Incorporated., Ten Canal Park, Cambridge, MA, USA. www.aspentech.com.
  3. Balcilar, M., Ozdemir, Z. A., Ozdemir, H. and Shahbaz, M., 2018, The renewable energy consumption and growth in the G-7 countries: Evidence from historical decomposition method, Renewable Energy, 126, 594-604.
  4. Bejan, A., Tsatsaronis, G. and Moran, M.J., 1996, Thermal Design And Optimization. (First Ed.), John Wiley & Sons.
  5. Cengel, Y. A. and Boles, M.A., 2015, Thermodynamics: An Engineering Approach, (Seventh Ed.) McGraw-Hill.
  6. Coskun, A., Bolatturk, A. and Kanoglu, M., 2014, Thermodynamic and economic analysis and optimization of power cycles for a medium temperature geothermal resource, Energy conversion and management, 78, 39-49.
  7. Dhillon, B.S., 2009, Life cycle costing for engineer, (First Ed.), Crc Press.
  8. DiPippo, R., 2007, Ideal thermal efficiency for geothermal binary plants, Geothermics, 36(3), 276-285. Yari, M., 2010, Exergetic analysis of various types of geothermal power plants, Renewable Energy, 35(1), 112-121.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Makine Mühendisliği

Bölüm

Araştırma Makalesi

Yazarlar

Ceyhun Yılmaz Bu kişi benim
Türkiye

Yayımlanma Tarihi

30 Nisan 2020

Gönderilme Tarihi

5 Şubat 2019

Kabul Tarihi

16 Ocak 2020

Yayımlandığı Sayı

Yıl 2020 Cilt: 40 Sayı: 1

Kaynak Göster

APA
Yılmaz, C. (2020). IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY. Isı Bilimi ve Tekniği Dergisi, 40(1), 37-51. https://izlik.org/JA77SD76AB
AMA
1.Yılmaz C. IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY. Isı Bilimi ve Tekniği Dergisi. 2020;40(1):37-51. https://izlik.org/JA77SD76AB
Chicago
Yılmaz, Ceyhun. 2020. “IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY”. Isı Bilimi ve Tekniği Dergisi 40 (1): 37-51. https://izlik.org/JA77SD76AB.
EndNote
Yılmaz C (01 Nisan 2020) IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY. Isı Bilimi ve Tekniği Dergisi 40 1 37–51.
IEEE
[1]C. Yılmaz, “IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY”, Isı Bilimi ve Tekniği Dergisi, c. 40, sy 1, ss. 37–51, Nis. 2020, [çevrimiçi]. Erişim adresi: https://izlik.org/JA77SD76AB
ISNAD
Yılmaz, Ceyhun. “IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY”. Isı Bilimi ve Tekniği Dergisi 40/1 (01 Nisan 2020): 37-51. https://izlik.org/JA77SD76AB.
JAMA
1.Yılmaz C. IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY. Isı Bilimi ve Tekniği Dergisi. 2020;40:37–51.
MLA
Yılmaz, Ceyhun. “IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY”. Isı Bilimi ve Tekniği Dergisi, c. 40, sy 1, Nisan 2020, ss. 37-51, https://izlik.org/JA77SD76AB.
Vancouver
1.Ceyhun Yılmaz. IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY. Isı Bilimi ve Tekniği Dergisi [Internet]. 01 Nisan 2020;40(1):37-51. Erişim adresi: https://izlik.org/JA77SD76AB