STATISTICAL ANALYSIS OF THE DATA, WHICH RECEIVED FROM AN ASSEMBLY LINE AND THE USE OF THE RESULTS TO DO LINE BALANCING
Öz
Automated data acquisition from machines, assembly and test lines become easier and more common with the widespread use of automation in production plants. Automatically collected data gives more accurate and simultaneous information than manually collected data, but automatically collected and stored data does not efficiently converted into knowledge. This study done in a factory, which works in the industrial technology area, belongs to an international company. The purpose of this study is to determine the station occupancy in the assembly line and to optimize the assembly line operations by using statistical analysis methods with the data, which were automatically received from an assembly line. Method and time measurements implemented, after the assembly line set up and serial production were begin. Method and time measurements implemented on sample selected product types, due to wide range of the product type variety to reduce possible costs and time waste in case of using all the product types as inputs of the same method-time studies. Automatically collected data analyzed and the station occupancy, station base occupancy differences revealed in comparison with method-time measurement results, process capability of these operations done to optimize process improvements and presented to the decision maker.
Anahtar Kelimeler
Kaynakça
- Koch,V. (2014) “ Industry 4.0- Opportunities and Challenges of the Industrial Internet. “, PwC
- Pawellek, Günther (2014) “Ganzheitliche Fabrikplanung, Grundlagen, Vorgehensweise, EDV-Unterstützung. “, Springer Vieweg, Berlin.
- Boysen N., Fliedner M., Scholl A., (2007) “Assembly Line Balancing: Which Model to Use, When? “ Universitaet Hamburg, Friedrich Schiller Universitaet Jena.
- Gökçen H., Ağpak K. (2006) “A Goal Programming Approach to Simple U-line Balancing Problem”, Gazi University, Gaziantep University.
- Vorne Industries Inc. (2002-2008) “Specialist in visual factory and production monitoring systems”, Itasca, USA.
- Newmark L. J. (2003) “Patent: Capability Analysis of Assembly Line Production”, Pittsfield, MA, US.Suzaki K. (1987) “Techniques for Continuous Improvement”, Free Press.
- El-Awady K., Schaper C., and Kailath T. (1996) “Improvements in Cpk Using Real-Time Feedback Control”, IEEE Trans. Semiconduct. Manufact., vol. 9, pp. 87–94.
- Işığıçok E. (2012) “Toplam Kalite Yönetimi Bakış Açısıyla İstatistiksel Kalite Kontrol”, Bursa.
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
Diğer
Yazarlar
Erkan Işığıçok
Bu kişi benim
0000-0003-4037-0869
Yayımlanma Tarihi
30 Mart 2020
Gönderilme Tarihi
11 Kasım 2019
Kabul Tarihi
15 Şubat 2020
Yayımlandığı Sayı
Yıl 2020 Cilt: 2 Sayı: 1