Automated
data acquisition from machines, assembly and test lines become easier and more
common with the widespread use of automation in production plants.
Automatically collected data gives more accurate and simultaneous information
than manually collected data, but automatically collected and stored data does not
efficiently converted into knowledge. This study done in a factory, which works in
the industrial technology area, belongs to an international company. The
purpose of this study is to determine the station occupancy in the assembly line
and to optimize the assembly line operations by using statistical analysis
methods with the data, which were automatically received from an assembly line.
Method and time measurements implemented, after the assembly line set up and
serial production were begin. Method and time measurements implemented on
sample selected product types, due to wide range of the product type variety to
reduce possible costs and time waste in case of using all the product types as
inputs of the same method-time studies. Automatically collected data analyzed
and the station occupancy, station base occupancy differences revealed in comparison with method-time
measurement results, process capability of these operations done to optimize
process improvements and presented to the decision maker.
Automated Data Acquisition Line Balancing Assembly Line Process Capability Analysis OEE
Birincil Dil | İngilizce |
---|---|
Bölüm | Makaleler |
Yazarlar | |
Yayımlanma Tarihi | 30 Mart 2020 |
Yayımlandığı Sayı | Yıl 2020 Cilt: 2 Sayı: 1 |