Due Date Determination in Dynamic Job Shop Scheduling with Artificial Neural Network
Öz
Anahtar Kelimeler
Kaynakça
- Baker, K. R., “Introduction to Sequencing and Scheduling”, John Wiley & Sons, New York, 1974.
- Baykasoglu, A., Gokcen, M., "Gene expression programming based due date assignment in a simulated job shop", Expert Systems with Applications, Cilt 26, Sayı 10, Sayfa 12143-12150, Aralık 2009.
- Birman, M., Mosheiov, G., “A note on a Due Date Assignment on a Two Machine Flow Shop”, Computers and Operations Research, No. 31, s. 473-480, 2004.
- Biskup, D., Jahnke, H., “Common Due Date Assignment for Scheduling on a Single Machine with Jointly Reducible Processing Times”, International Journal of Economics”, No. 69, s. 317-322, 2001.
- Chen, T., “An Intelligent Hybrid System for Wafer Lot Output Time Prediction”, Advanced Engineering Informatics, No. 21, s. 55-65, 2007.
- Cheng, T. C. E., Gupta, M. C.,” Survey of Scheduling Research Involving Ddue Date Determination Decisions”, European Journal of Operational Research, No. 38, s. 156-166, 1989.
- Cheng, T. C. E., Chen, Z. L., Shakhlevich, N. V., “Common Due Date Assignment and Scheduling with Ready Times”, Computers and Operations Research, No. 29, s. 1957-1967, 2002.
- French, S, “Sequencing and Scheduling: An Introduction to the Mathematics of the Job Shop”, John Wiley & Sons, New York, 1982.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Endüstri Mühendisliği
Bölüm
Araştırma Makalesi
Yazarlar
Mümtaz İpek
*
0000-0001-9619-2403
Türkiye
Erken Görünüm Tarihi
17 Mart 2025
Yayımlanma Tarihi
18 Mart 2025
Gönderilme Tarihi
15 Ocak 2025
Kabul Tarihi
10 Mart 2025
Yayımlandığı Sayı
Yıl 2025 Cilt: 8 Sayı: 1