Research Article

Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis

Volume: 7 Number: 2 January 16, 2023
EN

Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis

Abstract

Today, companies have to use their resources in the most effective and efficient way in order to effectively meet the increasing competition and changing demands of the customers. Among prominent methods, especially in production, are lean manufacturing techniques, time studies, and ergonomic assessments, alongside being frequently encountered methods. Within the scope of this study, value stream mapping (VSM), time study, and Rapid Entire Body Assessment (REBA) methods were used in order to reach the desired daily shipment amounts using the resources efficiently in the packaging area of the Boyar Kimya textile company, Gaziantep. Firstly, the standard time of the operations was determined by the time study method. The time study method was carried out with the ProTimeEstimation program. Afterwards, the most produced product was selected, the value-adding (VA) and non- value-adding (NVA) operations in the packaging department were determined in detail, and the future state map was created by finding methods to reduce or eliminate NVA operations. The ergonomic evaluation of the working performance of the operators in the packaging department was made with the REBA method. As a result of each method, it has been observed that with the proposed improvements the daily shipment increased dramatically, and the risk levels of the operators decreased.

Keywords

References

  1. Başak, E.E., Yılmaz, I.S., Deniz, N. (2019). A lean manufacturing implementation in an industrial product manufacturer. Journal of Industrial Engineering, 30 (3), 157–172.
  2. Behnam, D., Ayough, A., Mirghaderi, S.H. (2018). Value stream mapping approach and analytical network process to identify and prioritize production system’s Mudas (case study: natural fibre clothing manufacturing company). Journal of the Textile Institute, 109 (1), 64–72.
  3. Bhamu, J., Sangwan, K. (2014). Lean manufacturing: Literature review and research issues. International Journal of Operations & Production Management, 34, 876–940.
  4. Birgün, S., Gülen, K.G., Özkan, K. (2006). Yalın üretime geçiş sürecinde değer akişi haritalama tekniğinin kullanilmasi: imalat sektöründe bir uygulama. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, 5 (9), 47–59.
  5. Dogan, N.O., Kama, A. (2021). Eliminating non-value-added activities in supply chain: A value stream mapping case study in the manufacturing sector. Niğde Ömer Halisdemir University Journal of Engineering Sciences, 10 (1): 91–99.
  6. Emir, S., Akyildiz, M., Eker, C., Tufekci, S., Derici, M., Ocaktan, D. (2019). Ergonomıc risk analysis of employees working in the packaging department. Ergonomics, 2 (2), 126–130.
  7. Esen, H., Fığlalı, N. (2013). Çalışma duruşu analiz yöntemleri ve çalışma duruşunun kas- iskelet sistemi rahatsızlıklarına etkileri. Sakarya Üniversitesi Fen Bilimleri Dergisi, 17 (1), 41–51.
  8. Gajšek, B., Šinko, S., Kramberger, T., Butlewski, M., Özceylan, E., Đukić, G. (2021). Towards productive and ergonomic order picking: a multi-objective modeling approach. Applied Sciences, 11, 4179.

Details

Primary Language

English

Subjects

Industrial Engineering

Journal Section

Research Article

Publication Date

January 16, 2023

Submission Date

March 16, 2022

Acceptance Date

July 7, 2022

Published in Issue

Year 2022 Volume: 7 Number: 2

APA
Muhacır, D., Aktaş, M. İ., & Özceylan, E. (2023). Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis. Journal of Transportation and Logistics, 7(2), 499-521. https://doi.org/10.26650/JTL.2022.1088652
AMA
1.Muhacır D, Aktaş Mİ, Özceylan E. Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis. JTL. 2023;7(2):499-521. doi:10.26650/JTL.2022.1088652
Chicago
Muhacır, Dilara, Muhammed İdris Aktaş, and Eren Özceylan. 2023. “Improving the Packaging Process of a Textile Company With Lean Production, Time Study and REBA Analysis”. Journal of Transportation and Logistics 7 (2): 499-521. https://doi.org/10.26650/JTL.2022.1088652.
EndNote
Muhacır D, Aktaş Mİ, Özceylan E (January 1, 2023) Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis. Journal of Transportation and Logistics 7 2 499–521.
IEEE
[1]D. Muhacır, M. İ. Aktaş, and E. Özceylan, “Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis”, JTL, vol. 7, no. 2, pp. 499–521, Jan. 2023, doi: 10.26650/JTL.2022.1088652.
ISNAD
Muhacır, Dilara - Aktaş, Muhammed İdris - Özceylan, Eren. “Improving the Packaging Process of a Textile Company With Lean Production, Time Study and REBA Analysis”. Journal of Transportation and Logistics 7/2 (January 1, 2023): 499-521. https://doi.org/10.26650/JTL.2022.1088652.
JAMA
1.Muhacır D, Aktaş Mİ, Özceylan E. Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis. JTL. 2023;7:499–521.
MLA
Muhacır, Dilara, et al. “Improving the Packaging Process of a Textile Company With Lean Production, Time Study and REBA Analysis”. Journal of Transportation and Logistics, vol. 7, no. 2, Jan. 2023, pp. 499-21, doi:10.26650/JTL.2022.1088652.
Vancouver
1.Dilara Muhacır, Muhammed İdris Aktaş, Eren Özceylan. Improving the Packaging Process of a Textile Company with Lean Production, Time Study and REBA Analysis. JTL. 2023 Jan. 1;7(2):499-521. doi:10.26650/JTL.2022.1088652



The JTL is being published twice (in April and October of) a year, as an official international peer-reviewed journal of the School of Transportation and Logistics at Istanbul University.