A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING

Öz

The utilization of digital modeling, monitoring, and simulation techniques in architectural and engineering projects at a real-world scale, following a predetermined workflow schedule, presents numerous advantages to key players and users involved in the construction process. Building information modeling and one of its associated advantages, clash/overlap detection, can play an important role during the initial stages of design development. The analysis of clash detection, which is a method that effectively identifies the overlap between spatial and three-dimensional geometric entities, facilitates a feedback-based design approach. The process of identifying and analyzing clashes can be conducted prior to the implementation phase, so guaranteeing long-term viability in relation to both temporal and financial aspects. In the context of this work, an examination of the available literature was conducted utilizing bibliometric approaches to get insight into the theoretical underpinnings of clash detection. In the present situation, significant clusters were acquired. In the methodology section, the modeling of the architectural design and structural project design for a two-storey architecture student center (ASC) project, spanning roughly 1200 square meters, was undertaken. The architectural and structural concepts of this project were designed using Autodesk Revit 2020 software, which is one of the building information modeling tools. Subsequently, clash detection analysis was employed. The analysis of clash detection was carried by using Autodesk Navisworks Manage 2020 software. The clashes, both soft and hard, were categorized and examined based on the achieved outcomes.

Anahtar Kelimeler

3D Coordination, Design Errors, Soft Clash, Hard Clash, Co-occurrence Analysis.

Kaynakça

  1. Akponeware, A. O., & Adamu, Z. A. (2017). Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM. Buildings, 7(3), 75.
  2. Azhar, S., Khalfan, M., & Maqsood, T. (2012). Building information modeling (BIM): now and beyond. Australasian Journal of Construction Economics and Building, The, 12(4), 15-28.
  3. Azhar, S., Nadeem, A., Mok, J. Y., & Leung, B. H. (2008, August). Building Information Modeling (BIM): A new paradigm for visual interactive modeling and simulation for construction projects. In Proc., First International Conference on Construction in Developing Countries (Vol. 1, pp. 435-46).
  4. Bockstael, D., & Issa, M. H. (2016). A methodology for contractor clash detection using building information modelling on commercial construction projects. Journal of information technology in construction (ITcon), 21(16), 233-249.
  5. Bradley, A., Li, H., Lark, R., & Dunn, S. (2016). BIM for infrastructure: An overall review and constructor perspective. Automation in construction, 71, 139-152.
  6. Chidambaram, S. (2020). The application of clash-detection processes in building information modelling for rebars. Proceedings of the Institution of Civil Engineers-Smart Infrastructure and Construction, 172(2), 53-69.
  7. Eastman, C. M., Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wiley & Sons.
  8. Eldeep, A. M., Farag, M. A., & Abd El-hafez, L. M. (2022). Using BIM as a lean management tool in construction processes–A case study. Ain Shams Engineering Journal, 13(2), 101556.
  9. Elyano, M. R. (2021, July). Analysis of clash detection and quantity take-off using BIM for warehouse construction. In IOP Conference Series: Earth and Environmental Science (Vol. 794, No. 1, p. 012012). IOP Publishing.
  10. Hasannejad, A., Sardrud, J. M., & Shirzadi Javid, A. A. (2022). BIM-based clash detection improvement automatically. International Journal of Construction Management, 1-7. He, Q., Wang, G., Luo, L., Shi, Q., Xie, J., & Meng, X. (2017). Mapping the managerial areas of Building Information Modeling (BIM) using scientometric analysis. International journal of project management, 35(4), 670-685.

Kaynak Göster

APA
Yönder, V. M., & Çavka, H. B. (2024). A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING. Livenarch+ Journal, 1(1), 57-71. https://izlik.org/JA83JM89WP
AMA
1.Yönder VM, Çavka HB. A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING. LivenARCH+. 2024;1(1):57-71. https://izlik.org/JA83JM89WP
Chicago
Yönder, Veli Mustafa, ve Hasan Burak Çavka. 2024. “A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING”. Livenarch+ Journal 1 (1): 57-71. https://izlik.org/JA83JM89WP.
EndNote
Yönder VM, Çavka HB (01 Ocak 2024) A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING. Livenarch+ Journal 1 1 57–71.
IEEE
[1]V. M. Yönder ve H. B. Çavka, “A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING”, LivenARCH+, c. 1, sy 1, ss. 57–71, Oca. 2024, [çevrimiçi]. Erişim adresi: https://izlik.org/JA83JM89WP
ISNAD
Yönder, Veli Mustafa - Çavka, Hasan Burak. “A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING”. Livenarch+ Journal 1/1 (01 Ocak 2024): 57-71. https://izlik.org/JA83JM89WP.
JAMA
1.Yönder VM, Çavka HB. A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING. LivenARCH+. 2024;1:57–71.
MLA
Yönder, Veli Mustafa, ve Hasan Burak Çavka. “A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING”. Livenarch+ Journal, c. 1, sy 1, Ocak 2024, ss. 57-71, https://izlik.org/JA83JM89WP.
Vancouver
1.Veli Mustafa Yönder, Hasan Burak Çavka. A CASE STUDY OF CLASH DETECTION FOR EARLY DESIGN PHASES IN BUILDING INFORMATION MODELLING. LivenARCH+ [Internet]. 01 Ocak 2024;1(1):57-71. Erişim adresi: https://izlik.org/JA83JM89WP