Araştırma Makalesi

Project İmplementation Process To Develop New Product

Cilt: 6 Sayı: 2 1 Eylül 2017
PDF İndir
EN TR

Project İmplementation Process To Develop New Product

Öz

In this study, the stages of new product design were evaluated and the design process was tried to be revealed. Beginning with the introduction of the new product, the stages of defining the raw material properties and physical, mathematical and chemical properties of the product will be explained. It has been specified how the mobility of the product should be demonstrated, what the market research should cover, and how artistic and popular aspects of the product will be reflected. The analysis of the design process and how it should be assessed is briefly explained. The process of visual design has to be carried out and technical details are given. It also gives details about the pre - release process of the product.

Anahtar Kelimeler

Kaynakça

  1. Evren, R., Kahveci, R., 2005, Yeni Ürün Geliştirme, İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, Yüksek Lisans Tezi
  2. Dorothy Leonard-Barton, 1992, Core Capabılıtıes And Core Rıgıdıtıes: A Paradox In Managıng New Product Deve... Strategic Management Journal (1986-1998); 13, Specıal Issue; Abı/Inform Global Pg. 111
  3. Carlile P., R., 2002, A Pragmatic View of Knowledge and Boundaries: Boundary Objects in New Product Development Organization Science, Vol. 13, No. 4 pp. 442-455 Trott P., Innovation Management and New Product Development, Portsmouth Business School, Financial Times Prentice Hall is an imprint of Pearson, Fifth Edition
  4. Bass, F. M. (1969). A new product growth for model consumer durables. Management science, 15(5), 215-227.
  5. Leonard, D. A. (2011). Core capabilities and core rigidities: A paradox in managing new product development. In Managing Knowledge Assets, Creativity And Innovation (pp. 11-27).
  6. Katila, R., & Ahuja, G. (2002). Somethingold, something new: A longitudinal studyof search behavior and new productintroduction. Academy of managementjournal, 45(6), 1183-1194.
  7. Biegler, L. T., Grossmann, I. E., & Westerberg, A. W. (1997). Systematicmethods for chemical process design.
  8. Lawson, B. (2006). How designers think: the design process demystified. Routledge.

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

1 Eylül 2017

Gönderilme Tarihi

1 Mart 2017

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2017 Cilt: 6 Sayı: 2

Kaynak Göster

APA
Hastürk, E. Y., Ay, İ., & Kademli, M. (2017). Project İmplementation Process To Develop New Product. Mesleki Bilimler Dergisi (MBD), 6(2), 142-146. https://izlik.org/JA99LK57PD
AMA
1.Hastürk EY, Ay İ, Kademli M. Project İmplementation Process To Develop New Product. Mesleki Bilimler Dergisi (MBD). 2017;6(2):142-146. https://izlik.org/JA99LK57PD
Chicago
Hastürk, Ertan Yesari, İlker Ay, ve Murat Kademli. 2017. “Project İmplementation Process To Develop New Product”. Mesleki Bilimler Dergisi (MBD) 6 (2): 142-46. https://izlik.org/JA99LK57PD.
EndNote
Hastürk EY, Ay İ, Kademli M (01 Eylül 2017) Project İmplementation Process To Develop New Product. Mesleki Bilimler Dergisi (MBD) 6 2 142–146.
IEEE
[1]E. Y. Hastürk, İ. Ay, ve M. Kademli, “Project İmplementation Process To Develop New Product”, Mesleki Bilimler Dergisi (MBD), c. 6, sy 2, ss. 142–146, Eyl. 2017, [çevrimiçi]. Erişim adresi: https://izlik.org/JA99LK57PD
ISNAD
Hastürk, Ertan Yesari - Ay, İlker - Kademli, Murat. “Project İmplementation Process To Develop New Product”. Mesleki Bilimler Dergisi (MBD) 6/2 (01 Eylül 2017): 142-146. https://izlik.org/JA99LK57PD.
JAMA
1.Hastürk EY, Ay İ, Kademli M. Project İmplementation Process To Develop New Product. Mesleki Bilimler Dergisi (MBD). 2017;6:142–146.
MLA
Hastürk, Ertan Yesari, vd. “Project İmplementation Process To Develop New Product”. Mesleki Bilimler Dergisi (MBD), c. 6, sy 2, Eylül 2017, ss. 142-6, https://izlik.org/JA99LK57PD.
Vancouver
1.Ertan Yesari Hastürk, İlker Ay, Murat Kademli. Project İmplementation Process To Develop New Product. Mesleki Bilimler Dergisi (MBD) [Internet]. 01 Eylül 2017;6(2):142-6. Erişim adresi: https://izlik.org/JA99LK57PD