The payments for the public construction contracts are required to be based on official information and documents. In respect to these payments known as certificates of payments, reservations methods introduced by the contracts and attached specifications bring about many problems. In these works for which public power outweighs, while the only remedy for the contractor who has experienced trouble over any issue with the party ordering the work is to resort to the judiciary, the failure to execute the mentioned requirement as to the form in a timely and appropriate manner prevents exercising this right. The process and results of this shall be examined in this study
Kamu yapım sözleşmelerinde iş sahibinin ücret ödemelerinin resmî bilgi ve belgelere dayanması gerekir. Uygulamada hakediş raporu olarak adlandırılan bu ödemelerde sözleşme ve eki şartname ile getirilen ihtirazı kayıt şekilleri beraberinde birçok problem doğurmaktadır. Kamusal gücün ağır bastığı bu işlerde iş sahibi ile belli konuda anlaşma sağlayamayan yüklenicinin tek çıkar yolu yargıya gitmek iken anılan şekil şartının zamanında ve uygun şekilde yerine getirilmemesi bu hakkın kullanılmasına engel olmaktadır. Bu çalışmada bu süreç ve sonuçları incelenecektir
Birincil Dil | Türkçe |
---|---|
Bölüm | Makaleler |
Yazarlar | |
Yayımlanma Tarihi | 2 Ekim 2015 |
Yayımlandığı Sayı | Yıl 2015 Sayı: 5 |