Araştırma Makalesi

Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines

Cilt: 6 Sayı: 1 1 Şubat 2010
PDF İndir
TR EN

Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines

Öz

: The purposes of this study were, to determine the working time and field capacity of the laser controlled land leveling machine, manufactured by a local manufacturer in Turkey. The percentage of ground surface covered by tractor tire in field due to field traffic was also investigated. Mathematical model that allows predicting the working time by the value of 81.8% coefficient of determination was obtained. If total effective working time and hourly cost of tractor and laser machine combination are known, then prediction of total land leveling cost of any laser controlled land leveling machine could be possible with developed mathematical model.

Kaynakça

  1. Anonimous a, 1976. Agricultural Machinery Management Data. ASAE Data: ASAE D230.2. Agricultural Engineers Yearbook-1976. ASAE Michigan.
  2. Anonimous b,-, Mara, Technical and working card, Via Monviso 65-Vercelli-ITALY.
  3. Anonimous c,- Laserplane, Agricultural Grade Control System, Spektra-Physics, 5475 Kellenburger Road, Daytan, OH 45424-1099 Anonimous d,- Laserplane, Agricultural Grade Control System, Spektra-Physics, 5475 Kellenburger Road, Daytan, OH 45424-1099 Önal, İ., Yürdem, H., 1998. Lazer Düzlemi İle Tarımsal Meyil Kontrol Sistemleri. 18. Tarımsal Mekanizasyon Kongresi, Bildiriler: CD-Rom, Tekirdağ.
  4. Önal, İ., 2010. Meliorasyon Makinaları. E.Ü.Z.F. Yayınları No: 501. III Basım, Ders Kitabı, Bornova- İzmir.
  5. Rickman, J. F., 2002. Manual for laser land leveling, Rice-Wheat Consortium Technical Bulletin Series 5. New Delhi-110 012, India: Rice-Wheat Consortium for the Indo-Gangetic Plains. pp.24.
  6. Sommer, C., Brandhuber, R., Brunotte, J., Buchner, W., 2001. 3. Vorsorge gegen Bodenschadverdichtungen. S.14-41. Gute fachliche Praxis zur Vorsorge gegen Bodenschadverdichtungen und Bodenerosion. Referat 516. Bundesministerium für Verbraucherschutz, Ernaehrung und Landwirtschaft (BMVEL).
  7. Sönmez, N., Balaban, A., 1966. Kültürteknik. Cilt:II (Sulama ve Drenaj). Ankara Üniversitesi Ziraat Fakültesi Talebe Cemiyeti No. 18. s. 213-422. Ankara.
  8. Uçucu, R., 1976. Ein Beitrag zur Ermittlung des Arbeitszeitbedarfes und der Arbeitsleistung bei der Bodenbearbeitung einschliesslich der Aussaat und der Wirkung der wichtigsten agrarstrukturellen Einflussgrössen unter Berücksichtigung der Verhaeltnisse in der West-Türkei. Institut für Landtechnik der Justus Liebig –Universitaet Giessen. 123 s. Dissertation Giessen

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

Araştırma Makalesi

Yazarlar

Yayımlanma Tarihi

1 Şubat 2010

Gönderilme Tarihi

19 Temmuz 2010

Kabul Tarihi

17 Ağustos 2010

Yayımlandığı Sayı

Yıl 2010 Cilt: 6 Sayı: 1

Kaynak Göster

APA
Yürdem, H., & Önal, İ. (2010). Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines. Tarım Makinaları Bilimi Dergisi, 6(1), 19-28. https://izlik.org/JA43UU46HR
AMA
1.Yürdem H, Önal İ. Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines. JAMS. 2010;6(1):19-28. https://izlik.org/JA43UU46HR
Chicago
Yürdem, Hüseyin, ve İsmet Önal. 2010. “Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines”. Tarım Makinaları Bilimi Dergisi 6 (1): 19-28. https://izlik.org/JA43UU46HR.
EndNote
Yürdem H, Önal İ (01 Şubat 2010) Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines. Tarım Makinaları Bilimi Dergisi 6 1 19–28.
IEEE
[1]H. Yürdem ve İ. Önal, “Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines”, JAMS, c. 6, sy 1, ss. 19–28, Şub. 2010, [çevrimiçi]. Erişim adresi: https://izlik.org/JA43UU46HR
ISNAD
Yürdem, Hüseyin - Önal, İsmet. “Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines”. Tarım Makinaları Bilimi Dergisi 6/1 (01 Şubat 2010): 19-28. https://izlik.org/JA43UU46HR.
JAMA
1.Yürdem H, Önal İ. Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines. JAMS. 2010;6:19–28.
MLA
Yürdem, Hüseyin, ve İsmet Önal. “Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines”. Tarım Makinaları Bilimi Dergisi, c. 6, sy 1, Şubat 2010, ss. 19-28, https://izlik.org/JA43UU46HR.
Vancouver
1.Hüseyin Yürdem, İsmet Önal. Prediction of the Working Time Requirement and Field Capacity of Laser Controlled Land Leveling Machines. JAMS [Internet]. 01 Şubat 2010;6(1):19-28. Erişim adresi: https://izlik.org/JA43UU46HR

Tarım Makinaları Bilimi Dergisi, Tarım Makinaları Derneği tarafından yayınlanan hakemli bilimsel bir dergidir. Dergi, 2026 yılından itibaren sürekli yayın modeline geçmiştir.