Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey

Cilt: 34 Sayı: 1 1 Ocak 2023
PDF İndir
TR EN

Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey

Öz

In the transition from price-based bid evaluation to multi-criteria bid evaluation process in public procurements pioneered by academic research, the aim is to ensure the delivery of the project at the desired quality without exceeding the time and budget of the contract process. In the tenders made according to the Public Procurement Law (PPL), while the lowest price principle was used in the bid evaluation stage, non-price elements began to be used in time. In this study, solutions to current problems such as the evaluation of extremely low bids in the tenders made within the scope of the law, the long duration of the bid evaluation process, and the high number of conflicts are proposed through the model created by Fuzzy AHP-TOPSIS methods.

Anahtar Kelimeler

Kaynakça

  1. K. T. Cho, "Multicriteria decision methods: An attempt to evaluate and unify," Mathematical and Computer Modelling, vol. 37, no. 9-10, pp. 1099-1119, 2003.
  2. E. W. L. Cheng and H. Li, "Contractor selection using the analytic network process," Construction Management and Economics, vol. 22, no. 10, pp. 1021-2032, 2004.
  3. M. Marzouk, "An Application of ELECTRE III to Contractor Selection," in Construction Research Congress: Innovation for Reshaping Construction Practice, Banff, Alberta, Canada, 2010.
  4. S. Lambropoulos, "The use of time and cost utility for construction contract award under European Union Legislation," Building and Environment, vol. 42, no. 1, pp. 452-463, 2007.
  5. M. Araújo, L. H. Alencar and C. Mota, "Contractor Selection in Construction Industry: a Multicriteria Model," in 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Singapore, 2015.
  6. D. Putra and P. Pratama, "Decision support system selection of tender winners project development building of STMIK STIKOM Indonesia with TOPSIS method," Journal of Physics: Conference Series, vol. 1469, pp. 12-26, 2020.
  7. M.-Y. Cheng, S.-H. Yeh and W.-C. Chang, "Multi-Criteria Decision Making of Contractor Selection in Mass Rapid Transit Station Development Using Bayesian Fuzzy Prospect Model," Sustainability, vol. 12, no. 11, p. 4606, 2020.
  8. İ. Özyürek, "An Alternative Method Proposal For Selection Of Contractor In Public Works Procurement," PhD Thesis, Graduate School of Natural and Applied Sciences, Gazi University, Ankara, 2018.

Ayrıntılar

Birincil Dil

İngilizce

Konular

İnşaat Mühendisliği

Bölüm

Teknik Not

Yayımlanma Tarihi

1 Ocak 2023

Gönderilme Tarihi

20 Aralık 2021

Kabul Tarihi

11 Kasım 2022

Yayımlandığı Sayı

Yıl 2023 Cilt: 34 Sayı: 1

Kaynak Göster

APA
Özyürek, İ., & Erdal, M. (2023). Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey. Turkish Journal of Civil Engineering, 34(1), 153-166. https://doi.org/10.18400/tjce.1209197
AMA
1.Özyürek İ, Erdal M. Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey. tjce. 2023;34(1):153-166. doi:10.18400/tjce.1209197
Chicago
Özyürek, İbrahim, ve Mürsel Erdal. 2023. “Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey”. Turkish Journal of Civil Engineering 34 (1): 153-66. https://doi.org/10.18400/tjce.1209197.
EndNote
Özyürek İ, Erdal M (01 Ocak 2023) Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey. Turkish Journal of Civil Engineering 34 1 153–166.
IEEE
[1]İ. Özyürek ve M. Erdal, “Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey”, tjce, c. 34, sy 1, ss. 153–166, Oca. 2023, doi: 10.18400/tjce.1209197.
ISNAD
Özyürek, İbrahim - Erdal, Mürsel. “Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey”. Turkish Journal of Civil Engineering 34/1 (01 Ocak 2023): 153-166. https://doi.org/10.18400/tjce.1209197.
JAMA
1.Özyürek İ, Erdal M. Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey. tjce. 2023;34:153–166.
MLA
Özyürek, İbrahim, ve Mürsel Erdal. “Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey”. Turkish Journal of Civil Engineering, c. 34, sy 1, Ocak 2023, ss. 153-66, doi:10.18400/tjce.1209197.
Vancouver
1.İbrahim Özyürek, Mürsel Erdal. Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey. tjce. 01 Ocak 2023;34(1):153-66. doi:10.18400/tjce.1209197

Cited By