Araştırma Makalesi

A Case Study on the Estimation of Flood Flows in Rivers with Different Methods

Cilt: 7 Sayı: 1 24 Mayıs 2023
PDF İndir
EN

A Case Study on the Estimation of Flood Flows in Rivers with Different Methods

Öz

The estimation of the flood discharges of rivers that do not have streamflow measurements is one of the important issues in hydraulic engineering. For the safety of the structures to be built on these rivers, it is necessary to accurately estimate the possible flood discharges for some periods. Many methods have been developed on this subject. With the methods developed based on the catchment and rainfall characteristics, it is possible to make accurate estimations about the catchment without flow measurement. In this study, an evaluation was made on the estimation success of the methods by trying to determine the flood discharges of a river flowing through a 336 km2 catchment area with indirect and direct methods based on rainfall. Compared rainfall-runoff estimation methods showed that Synthetic Method was the least reliable one among all other estimations. On the other hand, with the discharges of Q10 = 77 m3/s, Q100 = 193 m3/s and Q500 = 273 m3/s, Mockus emerged as the most consistent one through all evaluated peak flow discharges methods. It is also intended that this study will be a guide for those who work on the subject.

Anahtar Kelimeler

Teşekkür

We thank “ACR Planning Consultancy Company” for their support and contributions to the study.

Kaynakça

  1. Bayazıt, M. (2011). Hidroloji, Birsen Press.
  2. Bayazıt, M., Avcı İ., & Şen Z. (2009). Hidroloji uygulamaları. Birsen Press.
  3. Chen, C. L. (1983). Rainfall intensity-duration-frequency formulas. Journal of Hydraulic Engineering, 109(12), 1603-1621. https://doi.org/10.1061/(ASCE)0733- 9429(1983)109:12(1603)
  4. Chow, W. T., Maidment, D. R., & Mays, L. W. (1988). Applied hydrology. McGraw-Hill, Inc. http://ponce.sdsu.edu/Applied_Hydrology_Chow_1988.pdf
  5. DSİ. (1994). Türkiye akarsu havzaları maksimum akımlar frekans analizi (MAFA). Bayındırlık ve İskan Bakanlığı, Devlet Su İşleri Genel Müdürlüğü, Etüt ve Plan Dairesi Başkanlığı Press.
  6. Ekinci, R., Büyüksaraç, A., Ekinci, L. Y., & Işik, E. (2020). Natural disaster diversity assessment of Bitlis Province. Journal of Natural Hazards and Environment, 6(1), 1 - 11. https://doi.org/10.21324/dacd.535189
  7. Gao, Z., Long, D., Tang, G., Zeng, C., Huang, J., & Hong, Y. (2017). Assessing the potential of satellite-based precipitation estimates for flood frequency analysis in ungauged or poorly gauged tributaries of China’s Yangtze River basin. Journal of Hydrology, 550, 478-496. https://doi.org/10.1016/j.jhydrol.2017.05.025
  8. Gulbahar, N. (2016). A comparison study of some flood estimation methods in terms of design of water structures. International Journal of Engineering Technologies IJET, 2(1), 8-13.

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

Araştırma Makalesi

Erken Görünüm Tarihi

24 Mayıs 2023

Yayımlanma Tarihi

24 Mayıs 2023

Gönderilme Tarihi

10 Kasım 2022

Kabul Tarihi

19 Aralık 2022

Yayımlandığı Sayı

Yıl 2023 Cilt: 7 Sayı: 1

Kaynak Göster

APA
Aydın, M. C., & Ulu, A. E. (2023). A Case Study on the Estimation of Flood Flows in Rivers with Different Methods. Turkish Journal of Water Science and Management, 7(1), 46-70. https://doi.org/10.31807/tjwsm.1202174
AMA
1.Aydın MC, Ulu AE. A Case Study on the Estimation of Flood Flows in Rivers with Different Methods. Turkish Journal of Water Science and Management. 2023;7(1):46-70. doi:10.31807/tjwsm.1202174
Chicago
Aydın, Mehmet Cihan, ve Ali Emre Ulu. 2023. “A Case Study on the Estimation of Flood Flows in Rivers with Different Methods”. Turkish Journal of Water Science and Management 7 (1): 46-70. https://doi.org/10.31807/tjwsm.1202174.
EndNote
Aydın MC, Ulu AE (01 Mayıs 2023) A Case Study on the Estimation of Flood Flows in Rivers with Different Methods. Turkish Journal of Water Science and Management 7 1 46–70.
IEEE
[1]M. C. Aydın ve A. E. Ulu, “A Case Study on the Estimation of Flood Flows in Rivers with Different Methods”, Turkish Journal of Water Science and Management, c. 7, sy 1, ss. 46–70, May. 2023, doi: 10.31807/tjwsm.1202174.
ISNAD
Aydın, Mehmet Cihan - Ulu, Ali Emre. “A Case Study on the Estimation of Flood Flows in Rivers with Different Methods”. Turkish Journal of Water Science and Management 7/1 (01 Mayıs 2023): 46-70. https://doi.org/10.31807/tjwsm.1202174.
JAMA
1.Aydın MC, Ulu AE. A Case Study on the Estimation of Flood Flows in Rivers with Different Methods. Turkish Journal of Water Science and Management. 2023;7:46–70.
MLA
Aydın, Mehmet Cihan, ve Ali Emre Ulu. “A Case Study on the Estimation of Flood Flows in Rivers with Different Methods”. Turkish Journal of Water Science and Management, c. 7, sy 1, Mayıs 2023, ss. 46-70, doi:10.31807/tjwsm.1202174.
Vancouver
1.Mehmet Cihan Aydın, Ali Emre Ulu. A Case Study on the Estimation of Flood Flows in Rivers with Different Methods. Turkish Journal of Water Science and Management. 01 Mayıs 2023;7(1):46-70. doi:10.31807/tjwsm.1202174

download?token=eyJhdXRoX3JvbGVzIjpbXSwiZW5kcG9pbnQiOiJqb3VybmFsIiwib3JpZ2luYWxuYW1lIjoiYnkucG5nIiwicGF0aCI6ImU4NGMvNTEwZC83ZjIyLzY5ZDYxZWJjNTkzZWQyLjM5OTI1ODMxLnBuZyIsImV4cCI6MTc3NTY0Mzg1Miwibm9uY2UiOiJlMjQyYTcyYjY0ZGM2YmVmOTIxMWM1MmJjOTMzNjgzYSJ9.kzGcL4b-TrmYPNqEDlwUFRzTGmbK8E7i0fQUhV5utjs

Except where otherwise noted, the content on this site is licensed under a Creative Commons Attribution 4.0 International License.