An Improved Algorithm for Minimizing Makespan on Flowshops with Uncertain Processing Times
Abstract
Keywords
References
- Allahverdi, A., 2001. The tricriteria two-machine flowshop scheduling problem. International Transactions in Operational Research 8, 403-425.
- Allahverdi, A., 2004. A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness. Computers & Operations Research 31, 157-180.
- Allahverdi, A., Allahverdi, M., 2018. Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness. Computational and Applied Mathematics 37, 6774-679.
- Allahverdi, M., Allahverdi, A., 2020. Algorithms for Four-machine flowshop scheduling problem with uncertain processing times to minimize makespan. RAIRO Operations Research 54, 529-553.
- Allahverdi, A., Aydilek, H., 2010a. Heuristics for two-machine flowshop scheduling problem to minimize makespan with bounded processing times. International Journal of Production Research 48, 6367- 6385.
- Allahverdi, A., and Aydilek, H., 2010b. Heuristics for two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times. Computers and Mathematics with Applications 60, 1374-1384.
- Allahverdi, A., and Sotskov, Y.N., 2003. Two-machine flowshop minimum length scheduling problem with random and bounded processing times. International Transactions in Operational Research 10, 65-76.
- Aydilek, H., and Allahverdi, A., 2010. Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time. Computers and Mathematics with Applications 59, 684-693.
- Aydilek, A., Aydilek, H., Allahverdi, A., 2013. Increasing the profitability and competitiveness in a production environment with random and bounded setup times. International Journal of Production Research 51, 106- 117.
- Aydilek, A., Aydilek, H., Allahverdi, A., 2015. Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan. International Journal of Production Research 53, 2803-2819.