Hatıllı Duvarların Metraj ve Hakediş Süreçlerinin Yönetimi
Öz
Anahtar Kelimeler
Kaynakça
- Bečvarovská, R., & Matějka, P. (2014). Comparative Analysis Of Creating Traditional Quantity Takeoff Method And Using A BIM Tool. In Construction Maeconomics Conference 2014.
- Smith, P. (2014). BIM & the 5D Project Cost Manager. Procedia - Social and Behavioral Sciences, 119, 475–484. doi: 10.1016/j.sbspro.2014.03.053
- Małgorzata G., Marek S.: Challenges In Takeoffs and Cost Estimating in the BIM Technology, Based on the Example of a Road Bridge Model (2017)
- Olsen D. and Taylor J. Quantity Takeoff Using Building Information Modeling (BIM), and Its Limiting Factors. Procedia Engineering, 2017.
- Bylund, C. & Magnusson, A., 2012. Model based cost estimations - an international comparison. Thesis (Masters). Faculty of Engineering, Lund University, Lund, Sweden.
- Eastman C., Teicholz P., Sacks R., and Liston K. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, 2nd ed. John Wiley & Sons, Inc., Hoboken, New Jersey, 2011.
- Monteiro A. and Martins J.P. A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Automation in Construction, 35:238-253, 2013.
- Mattern, H., Scheffer, M., & König, M. (2018). BIM-Based Quantity Take-Off. Building Information Modeling, 383–391. doi: 10.1007/978-3-319-92862-3_23
Ayrıntılar
Birincil Dil
Türkçe
Konular
Yapı Teknolojisi, İnşaat Yapım Mühendisliği
Bölüm
Araştırma Makalesi
Yazarlar
Eylem Zorlutuna
*
0000-0002-5870-3011
Türkiye
Yayımlanma Tarihi
30 Nisan 2020
Gönderilme Tarihi
11 Ocak 2020
Kabul Tarihi
14 Temmuz 2020
Yayımlandığı Sayı
Yıl 2020 Cilt: 2 Sayı: 1