A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty
Abstract
The occurrence of imperfect products that are studied at a specific rate during production holds a significant and comprehensive position in the literature. The fundamental premises underlying the research on the EOQ and EPQ models are as follows: there exists a specific percentage of imperfect production; that the defective rate of production is in line with a certain probability distribution; and that defective products are in themselves defective, repairable (rework), and defective (selling at a low price) etc. The studies of EPQ models that consider the inspection rate and production rate hold significant significance in the literature. This work presents the development of a novel EPQ model to handle the issue of reduced production time to eliminate backorders. The model's functioning is described by including uncertainty modeling, specifically using grey values to represent production rate, costs and prices.
Keywords
References
- Aydemir, E., Bedir, F., & Ozdemir, G. (2015). Degree of Greyness Approach for an EPQ Model with Imperfect Items in Copper Wire Industry. Journal of Grey System, 27(2).
- Aydemir, E., Bedir, F., Ozdemir, G., & Eroglu, A. (2014). An EPQ model with imperfect items using interval grey numbers. An International Journal of Optimization and Control: Theories & Applications (IJOCTA), 5(1), 21–32. https://doi.org/10.11121/ijocta.01.2015.00204
- Björk, K.-M. (2012). The Fuzzy Economic Order Quantity Problem with a Finite Production Rate and Backorders. Applied Computational Intelligence and Soft Computing, 2012, 1–8. https://doi.org/10.1155/2012/876230
- Chan, W. M., Ibrahim, R. N., & Lochert, P. B. (2003). A new EPQ model: integrating lower pricing, rework and reject situations. Production Planning & Control, 14(7), 588–595. https://doi.org/10.1080/09537280310001626179
- Chiu, Y.-S., Chiu, S., & Lin, H.-D. (2006). Solving an EPQ Model with Rework and Service Level Constraint. Mathematical and Computational Applications, 11(1), 75–84. https://doi.org/10.3390/mca11010075
- Chung, K.-J., & Hou, K.-L. (2003). An optimal production run time with imperfect production processes and allowable shortages. Computers & Operations Research, 30(4), 483–490. https://doi.org/10.1016/s0305-0548(01)00091-0
- De, S. K., & Bhattacharya, K. (2022). A Pollution Sensitive Marxian Production Inventory Model with Deterioration Under Fuzzy System. Journal of Optimization Theory and Applications, 192(2), 598–627. https://doi.org/10.1007/s10957-021-01979-9
- De Giovanni, P. (2019). An optimal control model with defective products and goodwill damages. Annals of Operations Research, 289(2), 419–430. https://doi.org/10.1007/s10479-019-03176-4
Details
Primary Language
English
Subjects
Industrial Engineering, Optimization in Manufacturing
Journal Section
Research Article
Publication Date
December 31, 2024
Submission Date
June 30, 2024
Acceptance Date
November 8, 2024
Published in Issue
Year 2024 Volume: 12 Number: 3
APA
Eroğlu, A., & Aydemir, E. (2024). A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty. Alphanumeric Journal, 12(3), 195-214. https://doi.org/10.17093/alphanumeric.1507650
AMA
1.Eroğlu A, Aydemir E. A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty. Alphanumeric. 2024;12(3):195-214. doi:10.17093/alphanumeric.1507650
Chicago
Eroğlu, Abdullah, and Erdal Aydemir. 2024. “A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty”. Alphanumeric Journal 12 (3): 195-214. https://doi.org/10.17093/alphanumeric.1507650.
EndNote
Eroğlu A, Aydemir E (December 1, 2024) A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty. Alphanumeric Journal 12 3 195–214.
IEEE
[1]A. Eroğlu and E. Aydemir, “A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty”, Alphanumeric, vol. 12, no. 3, pp. 195–214, Dec. 2024, doi: 10.17093/alphanumeric.1507650.
ISNAD
Eroğlu, Abdullah - Aydemir, Erdal. “A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty”. Alphanumeric Journal 12/3 (December 1, 2024): 195-214. https://doi.org/10.17093/alphanumeric.1507650.
JAMA
1.Eroğlu A, Aydemir E. A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty. Alphanumeric. 2024;12:195–214.
MLA
Eroğlu, Abdullah, and Erdal Aydemir. “A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty”. Alphanumeric Journal, vol. 12, no. 3, Dec. 2024, pp. 195-14, doi:10.17093/alphanumeric.1507650.
Vancouver
1.Abdullah Eroğlu, Erdal Aydemir. A New EPQ Model for Imperfect Production, Screening, and Rework With Backorders Under Grey Uncertainty. Alphanumeric. 2024 Dec. 1;12(3):195-214. doi:10.17093/alphanumeric.1507650