Research Article

A Tabu Search Algorithm for an Excavator Scheduling Problem

Volume: 4 Number: 1 June 30, 2020
Elifcan Göçmen *, Onur Derse
TR EN

A Tabu Search Algorithm for an Excavator Scheduling Problem

Abstract

Global sector prompts the construction firms to give a priority to time and cost factors. Thus, scheduling of the jobs is focal important to achieve cost and time objectives. Scheduling problems have gained a great importance in recent years in the construction sector. We have examined a single machine scheduling problem for an excavator used in the construction sector. There are some jobs in which each job has a normal processing time, a due date, earliness penalty and tardiness penalty. This paper presents a meta-heuristic optimization algorithm named Tabu Search (TS) to minimize the total cost and provides how it can be used to solve a wide variety of single machine scheduling problems. Computational results demonstrates that the proposed approach is a good tool for these problems.

Keywords

Tabu search, single machine scheduling problem, excavator, construction sector

References

  1. [1] M. Ben-daya and M. Al-Fawzan, “An efficient Tabu search algorithm for the single machine mean tardiness problem”. Production Planning and Control, vol. 8, no, 7, 1997.
  2. [2] K. Xu, Z. Feng, and K. Jun, “A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates”, Computers & Operations Research, vol. 37, no. 11, pp. 1924–1938, 2010.
  3. [3] V. Ateş, and N. Barışçı, “Short-term load forecasting model using flower pollination algorithm”, International Scientific and Vocational Studies Journal, vol. 1, no. 1, pp. 22-29.2017.
  4. [4] İ. B. Koç, A. Al Janadi, and V. Ateş, “Interlock optimization of an accelerator using genetic algorithm”, International Scientific and Vocational Studies Journal, vol. 1, no. 1, pp. 30-41, 2017.
  5. [5] C. Oguz, F. Salman, and Z. Yalçın, “Order acceptance and scheduling decisions in make-to-order systems”, International Journal of Production Economics, vol. 125, pp. 200–211, 2010.
  6. [6] M. Laguna, J. W. Barnes, and F. Glover, “Tabu search methods for a single machine scheduling problem”, Journal of Intelligent Manufacturing, vol. 2, pp. 63–74, 1991.
  7. [7] J. S. Chen, “Using integer programming to solve the machine scheduling problem with a flexible maintenance activity”, Journal of Statistics and Management Systems, vol. 9, no. 1, pp. 87–104, 2006.
  8. [8] J. S. Chen, “Optimization models for the machine scheduling problem with a single flexible maintenance activity”, Engineering Optimization, vol. 38, no. 1, 53–71, 2006.
  9. [9] O. Hinder, and A. J. Mason, “A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness”, European Journal of Operational Research, vol. 262, no. 2, pp. 411-423, 2017.
  10. [10] A. Ghodratnama, M. Rabbani, R. Tavakkoli-Moghaddam, and A. Baboli, “Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing”, Journal of Manufacturing Systems, vol 29, no. 1, pp. 1-9, 2010.
APA
Göçmen, E., & Derse, O. (2020). A Tabu Search Algorithm for an Excavator Scheduling Problem. International Scientific and Vocational Studies Journal, 4(1), 1-11. https://izlik.org/JA42NY57YA
AMA
1.Göçmen E, Derse O. A Tabu Search Algorithm for an Excavator Scheduling Problem. ISVOS. 2020;4(1):1-11. https://izlik.org/JA42NY57YA
Chicago
Göçmen, Elifcan, and Onur Derse. 2020. “A Tabu Search Algorithm for an Excavator Scheduling Problem”. International Scientific and Vocational Studies Journal 4 (1): 1-11. https://izlik.org/JA42NY57YA.
EndNote
Göçmen E, Derse O (June 1, 2020) A Tabu Search Algorithm for an Excavator Scheduling Problem. International Scientific and Vocational Studies Journal 4 1 1–11.
IEEE
[1]E. Göçmen and O. Derse, “A Tabu Search Algorithm for an Excavator Scheduling Problem”, ISVOS, vol. 4, no. 1, pp. 1–11, June 2020, [Online]. Available: https://izlik.org/JA42NY57YA
ISNAD
Göçmen, Elifcan - Derse, Onur. “A Tabu Search Algorithm for an Excavator Scheduling Problem”. International Scientific and Vocational Studies Journal 4/1 (June 1, 2020): 1-11. https://izlik.org/JA42NY57YA.
JAMA
1.Göçmen E, Derse O. A Tabu Search Algorithm for an Excavator Scheduling Problem. ISVOS. 2020;4:1–11.
MLA
Göçmen, Elifcan, and Onur Derse. “A Tabu Search Algorithm for an Excavator Scheduling Problem”. International Scientific and Vocational Studies Journal, vol. 4, no. 1, June 2020, pp. 1-11, https://izlik.org/JA42NY57YA.
Vancouver
1.Elifcan Göçmen, Onur Derse. A Tabu Search Algorithm for an Excavator Scheduling Problem. ISVOS [Internet]. 2020 Jun. 1;4(1):1-11. Available from: https://izlik.org/JA42NY57YA