Research Article

An Application on Estimation of Machine Failure Times in Cement Production Process

Volume: 7 Number: 2 December 31, 2024
TR EN

An Application on Estimation of Machine Failure Times in Cement Production Process

Abstract

This study aims at developing a model that would enable us to predict the failure times of machines in cement manufacturing process. The knowledge of machine failures is very vital in maintenance of machines in order to enhance production and minimize on costs of maintenance. In this context, Weibull distribution, Least Squares (LS) method and Maximum Likelihood Estimation (MLE) method are applied to assess failure distributions. 167 machine failure data were used in this study and analyzed with Minitab the software. It was concluded that the failure times follow Weibull distribution and the LS and MLE methods were used to estimate the parameters of the distribution in order to check the fitness. Thus, applying LS method, it is possible to get β = 2.07 and η = 971.7, while applying MLE method, results obtain as β = 2.17 and η = 966. It was noted that these values are rather close and both methods gave almost the same results.

Keywords

References

  1. [1] Ç. Teke, “Design and implementation of a method for determining the optimum maintenance policy in manufacturing sector,” Sakarya University, Türkiye, 2018.
  2. [2] S. M. A. Aljeddani and M. A. Mohammed, “A novel approach to Weibull distribution for the assessment of wind energy speed,” Alex. Eng. J., vol. 78, pp. 56–64, 2023.
  3. [3] L. Kamberı̇, S. Orhanı̇, M. Shaqı̇rı̇, and S. Idrı̇zı̇, “Comparison of three-parameter weibull distributionparameter estimators with the maximum likelihood method,” Sak. Univ. J. Sci., 2022.
  4. [4] Ş. Atamer and K. Çavdar, “Reliability analysis of a single stage gearbox,” UUJFE, vol. 14, no. 1, pp. 39–53, 2009.
  5. [5] O. Alkan, R. Ozçelı̇k, and Ş. Kalkanli, “Modeling diameter distribution of oriental beech in the Almus region using the Weibull distribution,” Turk. J. For., vol. 24, no. 3, pp. 197–207, 2023.
  6. [6] B. Yaniktepe and O. Kara, “Estimating wind energy potential using three different statistical distribution methods,” Cukurova University Journal of the Faculty of Engineering, vol. 36, no. 2, pp. 359–368, 2021.
  7. [7] F. Oral, “Statistical analysis of the wind energy potential of Bitlis province,” DUJE, vol. 11, no. 2, pp. 671–678, 2020.
  8. [8] O. Bı̇ngöl and A. Bulut, “Estimation of Weibull distribution parameters for wind energy applications: A case study of Dinar region in Turkey,” IJTS, vol. 14, no. 1, pp. 1–10, 2022.

Details

Primary Language

English

Subjects

Industrial Engineering

Journal Section

Research Article

Publication Date

December 31, 2024

Submission Date

December 8, 2024

Acceptance Date

December 23, 2024

Published in Issue

Year 2024 Volume: 7 Number: 2

APA
Teke, Ç., & İpek, M. (2024). An Application on Estimation of Machine Failure Times in Cement Production Process. Bayburt Üniversitesi Fen Bilimleri Dergisi, 7(2), 133-140. https://doi.org/10.55117/bufbd.1598345
AMA
1.Teke Ç, İpek M. An Application on Estimation of Machine Failure Times in Cement Production Process. Bayburt Üniversitesi Fen Bilimleri Dergisi. 2024;7(2):133-140. doi:10.55117/bufbd.1598345
Chicago
Teke, Çağatay, and Mümtaz İpek. 2024. “An Application on Estimation of Machine Failure Times in Cement Production Process”. Bayburt Üniversitesi Fen Bilimleri Dergisi 7 (2): 133-40. https://doi.org/10.55117/bufbd.1598345.
EndNote
Teke Ç, İpek M (December 1, 2024) An Application on Estimation of Machine Failure Times in Cement Production Process. Bayburt Üniversitesi Fen Bilimleri Dergisi 7 2 133–140.
IEEE
[1]Ç. Teke and M. İpek, “An Application on Estimation of Machine Failure Times in Cement Production Process”, Bayburt Üniversitesi Fen Bilimleri Dergisi, vol. 7, no. 2, pp. 133–140, Dec. 2024, doi: 10.55117/bufbd.1598345.
ISNAD
Teke, Çağatay - İpek, Mümtaz. “An Application on Estimation of Machine Failure Times in Cement Production Process”. Bayburt Üniversitesi Fen Bilimleri Dergisi 7/2 (December 1, 2024): 133-140. https://doi.org/10.55117/bufbd.1598345.
JAMA
1.Teke Ç, İpek M. An Application on Estimation of Machine Failure Times in Cement Production Process. Bayburt Üniversitesi Fen Bilimleri Dergisi. 2024;7:133–140.
MLA
Teke, Çağatay, and Mümtaz İpek. “An Application on Estimation of Machine Failure Times in Cement Production Process”. Bayburt Üniversitesi Fen Bilimleri Dergisi, vol. 7, no. 2, Dec. 2024, pp. 133-40, doi:10.55117/bufbd.1598345.
Vancouver
1.Çağatay Teke, Mümtaz İpek. An Application on Estimation of Machine Failure Times in Cement Production Process. Bayburt Üniversitesi Fen Bilimleri Dergisi. 2024 Dec. 1;7(2):133-40. doi:10.55117/bufbd.1598345

Indexing

                          download?token=eyJhdXRoX3JvbGVzIjpbXSwiZW5kcG9pbnQiOiJqb3VybmFsIiwib3JpZ2luYWxuYW1lIjoiYWNhZGVtaW5kZXhfbG9nby5wbmciLCJwYXRoIjoiMDE0OC9jNGUxL2ExYTEvNjlkNjIzMDZkMDFhNzkuNjQwNjcyNTYucG5nIiwiZXhwIjoxNzc1NjQ0OTUxLCJub25jZSI6IjIwMTE3NzAxMDQyODcyNDhkYjljNzA3MDNiZTI4MGQyIn0.gcKaww5KFzsu_vkMOBXVC6pmMUKOapitiUhwD5Iy6xQ      download?token=eyJhdXRoX3JvbGVzIjpbXSwiZW5kcG9pbnQiOiJqb3VybmFsIiwib3JpZ2luYWxuYW1lIjoiRFJKSV9Mb2dvLmpwZyIsInBhdGgiOiJhNjIxLzI3ZmUvZjRlZC82OWQ2MjMwNmM3MjM5NC45MjkzMzc2NC5qcGciLCJleHAiOjE3NzU2NDQ5NTEsIm5vbmNlIjoiODFjZDA0YjFjYjQ5OTM1MTM2YjVlNWFmOWU3M2VkMGEifQ.IrE2DQxJsd2_GiIgUm-2Ss63rpEBkTJ5pPxG4zfLZPE     download?token=eyJhdXRoX3JvbGVzIjpbXSwiZW5kcG9pbnQiOiJqb3VybmFsIiwib3JpZ2luYWxuYW1lIjoibG9nbzIucG5nIiwicGF0aCI6IjcxN2YvZTNhOS8wNDBkLzY5ZDYyMzA2ZDFkOWU3LjQzMzczOTcwLnBuZyIsImV4cCI6MTc3NTY0NDk1MSwibm9uY2UiOiI1Y2IzZGU3YjExOGIyNzA0Y2FiOTc1NTEyOTg0MjMxNSJ9.Bkxx2nQGj6Iq9GPltNmAd5p7wFOSTH2Ga3QTA0IL4cM