A PETRI NET APPROACH FOR SOLVING SIMPLE ASSEMBLY LINE BALANCING PROBLEM

Volume: 6 Number: 2 May 1, 2004
  • Özcan Kılınçcı
EN TR

A PETRI NET APPROACH FOR SOLVING SIMPLE ASSEMBLY LINE BALANCING PROBLEM

Abstract

Assembly line balancing problem is an assignment problem. Tasks are assigned to work stations on the line by providing the precedence relations between tasks. When the only one product is produced on the line and its tasks have deterministic times, the problem is called simple assembly line balancing problem (SALBP). If number of work stations on the line is fixed, then cycle time should be reduced (SALBP-1). Heuristics based on branch and bound procedures, tabu search metaheuristics, genetic approaches, and etc. have been developed to solve SALBP-1. In this article, Petri nets are represented as a new approach to solve this problem. Petri nets are mathematical and graphical tool to model, design, and analyze discrete event systems. Proposed algorithm based on Petri nets uses the especially reachability analysis to determine available tasks and select task into them. Algorithm is coded in MATLAB 6.0. Proposed algorithm is tested on Tonge’s 70-tasks problem, and then results are compared with existing seven methods’ results. The algorithm gave best results for 12 of 13 cycle time

Keywords

References

  1. Adamou M., Zerhoni S.N., Bourjault A. (1998): “Hierarchical Modeling and Control of Flexible Assembly Systems Using Object-oriented Petri Nets”, International Journal of Computer Integrated Manufacturing. Vol. 11, No. 1, pp. 18-33.
  2. Bautista J., Suarez R., Mateo M., Companys R. (2000): “Local Search Heuristics for Assembly Lien Balancing Problem with Incompatibilities between Tasks”, Proceedings of the 2000 IEEE International Conference on Robotics & Automation, San Francisco, CA., pp. 2404-2409.
  3. Baybars I. (1986b): “A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem”, Management Science, Vol. 32, No. 8, pp. 909-932.
  4. Baybars I. (1986a): “An Efficient Heuristic Method for the Simple Assembly Line Balancing Problem”, International Journal of Production Research, Vol. 24, No. 1, pp. 149-166.
  5. Cao T., Sanderson A.C. (1994): “Task Decomposition and Analysis of Robotic Assembly Task Plans Using Petri Nets”, IEEE Transactions on Industrial Electronics, Vol. 41, No.6, pp. 620-629.
  6. Chiang W.C. (1998): “The Application of a Tabu search Metaheuristic to the Assembly Line Balancing Problem”, Annals of Operations Research, No. 77, pp. 209-227.
  7. D’Souza K.A., Khator S.K. (1997): “System Reconfiguration to Avoid Deadlocks in Automated Manufacturing Systems”, Computers Industrial Engineering, Vol. 32, No.2. pp 455-465.
  8. Desrochers A.A., Al-Jaar R.Y. (1995): “Applications of Petri Nets in Manufacturing Systems, Modeling, Control, and Performance Analysis”, IEEE Press, New York.

Details

Primary Language

Turkish

Subjects

-

Journal Section

-

Authors

Özcan Kılınçcı This is me

Publication Date

May 1, 2004

Submission Date

May 1, 2004

Acceptance Date

-

Published in Issue

Year 2004 Volume: 6 Number: 2

APA
Kılınçcı, Ö. (2004). BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, 6(2), 1-15. https://izlik.org/JA57WC89NS
AMA
1.Kılınçcı Ö. BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI. DEUFMD. 2004;6(2):1-15. https://izlik.org/JA57WC89NS
Chicago
Kılınçcı, Özcan. 2004. “BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi 6 (2): 1-15. https://izlik.org/JA57WC89NS.
EndNote
Kılınçcı Ö (May 1, 2004) BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 6 2 1–15.
IEEE
[1]Ö. Kılınçcı, “BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI”, DEUFMD, vol. 6, no. 2, pp. 1–15, May 2004, [Online]. Available: https://izlik.org/JA57WC89NS
ISNAD
Kılınçcı, Özcan. “BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 6/2 (May 1, 2004): 1-15. https://izlik.org/JA57WC89NS.
JAMA
1.Kılınçcı Ö. BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI. DEUFMD. 2004;6:1–15.
MLA
Kılınçcı, Özcan. “BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, vol. 6, no. 2, May 2004, pp. 1-15, https://izlik.org/JA57WC89NS.
Vancouver
1.Özcan Kılınçcı. BASİT MONTAJ HATTI DENGELEME PROBLEMİ ÇÖZÜMÜ İÇİN BİR PETRİ AĞI YAKLAŞIMI. DEUFMD [Internet]. 2004 May 1;6(2):1-15. Available from: https://izlik.org/JA57WC89NS

This journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License (CC BY-NC 4.0).

download?token=eyJhdXRoX3JvbGVzIjpbXSwiZW5kcG9pbnQiOiJmaWxlIiwicGF0aCI6IjliNTAvMDBjMi8xZmIxLzY5MjZmZDIyOGE1NzgyLjA3MzU5MTk2LnBuZyIsImV4cCI6MTc2NDE2OTMzMSwibm9uY2UiOiI2MTU1ODg1NGZlYzhkZTA1OThkNTU2NGFmYTQzYTc0YiJ9.O5b4Ex8bMlFv5797LL8VnE9YWS_X5880dfbmOp2-kc8