BibTex RIS Cite

FUZZY PROGRAMMING APPROACH TO THE SIMPLE U SHAPED ASSEMBLY LINE BALANCING PROBLEM

Year 2002, Volume: 4 Issue: 2, 29 - 40, 01.05.2002

Abstract

In this paper, a fuzzy integer programming model (U-FP) for the simple U shaped
assembly line balancing problems is developed. The purpose of the model developed here is
to provide a solution to the decision maker for uncertainty cases of cycle time, number of
stations and work load values. This study is the first on fuzzy integer programming in the U
shaped assembly line literature.

References

  • Ajenblit D.A., Wainwright R.L. (1998): “Applying Genetic Algorithms To The U-Shaped Assembly Line Balancing Problem”, IEEE, pp. 96-101.
  • Baybars İ. (1986): “A survey of Exact Algorithms for The Simple Assembly Line Balancing Problem”, Management Science, Vol. 32, No. 8, pp. 909-932.
  • Cheng C.H., Miltenburg J., Motwani J. (2000): “Effect of Straight and U-shaped Lines on Quality”, IEEE Transactions on Engineering Management, Vol. 47, No. 3, pp. 321-334.
  • Erdal E., Sarın S.C. (1998): “A Survey of the Assembly Line Balancing Procedures”, Production Planning and Control, Vol. 9, No. 5, pp. 414-434.
  • Ghosh S., Gagnon J. (1989): “A Comprehensive Literature Review and Analysis of The Design, Balancing and Scheduling of Assembly Systems”, International Journal of Production Research, Vol. 27, No. 4, pp. 637-670.
  • Gökçen H., Ağpak K. (2001): “Goal Programming Approach to Simple U Line Balancing Problem”, Int. Journal of Production Research (İncelemede).
  • Hall R.W. (1983): “Zero Inventories”, IRWIN, Illinois, 1983.
  • Jackson J.R. (1956): “A Computing Procedure for a Line Balancing Problem”, Management Science, Vol. 2, No. 3, pp. 261-271.
  • Miltenburg G.J. (1998): “Balancing U-lines in a Multiple U-line Facility”, European Journal of Operational Research, Vol. 109, pp. 1-23.
  • Miltenburg G.J. (2000): “The Effect of Breakdowns on U-shaped Production Lines”, International Journal of Production Research, Vol. 38, No. 2, pp. 353-364.
  • Miltenburg G.J. (2001): “One-piece Flow Manufacturing on U-shaped Production Lines: a Tutorial”, IEE Transactions, Vol. 33, pp. 303-321.
  • Miltenburg G.J., Wijngaard J. (1994): “The U-Line Balancing Problem”, Management Science, Vol. 40, No. 10.
  • Monden Y. (1983): “Toyota Production System”, Industrial Engineering and Management Press, Instute of Industrial Engineers.
  • Nakade K., Ohno K., Shantikumar J.G. (1997): “Bounds and Approximations for Cycle Times of a U-shaped Production Line”, Operations Research Letters, Vol. 21, pp. 191- 200.
  • Nakade K., Ohno K. (1997): “Stochastic Analysis of a U-shaped Production Line with Multiple Workers”, Computers and Industrial Engineering, Vol. 33, No. 3-4, pp. 809-812.
  • Nakade K., Ohno K. (1999): “An Optimal Worker Allocation Problem for a U-shaped Production Line”, International J. of Production Economics, Vol. 60-61, pp. 353-358.
  • Patterson J.H., Albracht J.J. (1975): “Assembly Line Balancing: Zero-One Programming with Fibonacci Search”, Operations Research, Vol. 23, No. 1, pp. 166-172.
  • Scholl A., Klein R. (1999): “ULINO: Optimally Balancing U-shaped JIT Assembly Lines”, International Journal of Production Research, Vol. 37, No. 4, pp. 721-736.
  • Schonberger R.J. (1982): “Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity”, New York: The Free Press.
  • Sparling D., Miltenburg J. (1998): “The Mixed-Model U-line Balancing Problem”, International Journal of Production Research, Vol. 36, No. 2, pp.485-501.
  • Urban T.L. (1998): “Optimal Balancing of U-shaped Assembly Lines”, Management Science, Vol. 44, No. 5, pp. 738-741.
  • Werners B. (1987): “An Interactive Fuzzy Programming System”, Fuzzy Sets and Systems, Vol. 23, pp. 131-147.

BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI

Year 2002, Volume: 4 Issue: 2, 29 - 40, 01.05.2002

Abstract

Bu makalede, basit U tipi montaj hattı dengeleme problemleri için bir bulanık tamsayılı
programlama (U-FP) modeli geliştirilmiştir. Amaç çevrim zamanı, istasyon sayısı ve iş yükü
gibi sağ taraf değişkenlerin belirsiz olduğu durumlarda karar vericiye çözüm sunabilmektir.
Bu çalışma, U tipi montaj hattı literatüründeki ilk bulanık tamsayılı programlama
çalışmasıdır.

References

  • Ajenblit D.A., Wainwright R.L. (1998): “Applying Genetic Algorithms To The U-Shaped Assembly Line Balancing Problem”, IEEE, pp. 96-101.
  • Baybars İ. (1986): “A survey of Exact Algorithms for The Simple Assembly Line Balancing Problem”, Management Science, Vol. 32, No. 8, pp. 909-932.
  • Cheng C.H., Miltenburg J., Motwani J. (2000): “Effect of Straight and U-shaped Lines on Quality”, IEEE Transactions on Engineering Management, Vol. 47, No. 3, pp. 321-334.
  • Erdal E., Sarın S.C. (1998): “A Survey of the Assembly Line Balancing Procedures”, Production Planning and Control, Vol. 9, No. 5, pp. 414-434.
  • Ghosh S., Gagnon J. (1989): “A Comprehensive Literature Review and Analysis of The Design, Balancing and Scheduling of Assembly Systems”, International Journal of Production Research, Vol. 27, No. 4, pp. 637-670.
  • Gökçen H., Ağpak K. (2001): “Goal Programming Approach to Simple U Line Balancing Problem”, Int. Journal of Production Research (İncelemede).
  • Hall R.W. (1983): “Zero Inventories”, IRWIN, Illinois, 1983.
  • Jackson J.R. (1956): “A Computing Procedure for a Line Balancing Problem”, Management Science, Vol. 2, No. 3, pp. 261-271.
  • Miltenburg G.J. (1998): “Balancing U-lines in a Multiple U-line Facility”, European Journal of Operational Research, Vol. 109, pp. 1-23.
  • Miltenburg G.J. (2000): “The Effect of Breakdowns on U-shaped Production Lines”, International Journal of Production Research, Vol. 38, No. 2, pp. 353-364.
  • Miltenburg G.J. (2001): “One-piece Flow Manufacturing on U-shaped Production Lines: a Tutorial”, IEE Transactions, Vol. 33, pp. 303-321.
  • Miltenburg G.J., Wijngaard J. (1994): “The U-Line Balancing Problem”, Management Science, Vol. 40, No. 10.
  • Monden Y. (1983): “Toyota Production System”, Industrial Engineering and Management Press, Instute of Industrial Engineers.
  • Nakade K., Ohno K., Shantikumar J.G. (1997): “Bounds and Approximations for Cycle Times of a U-shaped Production Line”, Operations Research Letters, Vol. 21, pp. 191- 200.
  • Nakade K., Ohno K. (1997): “Stochastic Analysis of a U-shaped Production Line with Multiple Workers”, Computers and Industrial Engineering, Vol. 33, No. 3-4, pp. 809-812.
  • Nakade K., Ohno K. (1999): “An Optimal Worker Allocation Problem for a U-shaped Production Line”, International J. of Production Economics, Vol. 60-61, pp. 353-358.
  • Patterson J.H., Albracht J.J. (1975): “Assembly Line Balancing: Zero-One Programming with Fibonacci Search”, Operations Research, Vol. 23, No. 1, pp. 166-172.
  • Scholl A., Klein R. (1999): “ULINO: Optimally Balancing U-shaped JIT Assembly Lines”, International Journal of Production Research, Vol. 37, No. 4, pp. 721-736.
  • Schonberger R.J. (1982): “Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity”, New York: The Free Press.
  • Sparling D., Miltenburg J. (1998): “The Mixed-Model U-line Balancing Problem”, International Journal of Production Research, Vol. 36, No. 2, pp.485-501.
  • Urban T.L. (1998): “Optimal Balancing of U-shaped Assembly Lines”, Management Science, Vol. 44, No. 5, pp. 738-741.
  • Werners B. (1987): “An Interactive Fuzzy Programming System”, Fuzzy Sets and Systems, Vol. 23, pp. 131-147.
There are 22 citations in total.

Details

Other ID JA28ND88JG
Journal Section Research Article
Authors

Kürşad Ağpak This is me

Hadi Gökçen This is me

Publication Date May 1, 2002
Published in Issue Year 2002 Volume: 4 Issue: 2

Cite

APA Ağpak, K., & Gökçen, H. (2002). BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, 4(2), 29-40.
AMA Ağpak K, Gökçen H. BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI. DEUFMD. May 2002;4(2):29-40.
Chicago Ağpak, Kürşad, and Hadi Gökçen. “BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi 4, no. 2 (May 2002): 29-40.
EndNote Ağpak K, Gökçen H (May 1, 2002) BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 4 2 29–40.
IEEE K. Ağpak and H. Gökçen, “BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI”, DEUFMD, vol. 4, no. 2, pp. 29–40, 2002.
ISNAD Ağpak, Kürşad - Gökçen, Hadi. “BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 4/2 (May 2002), 29-40.
JAMA Ağpak K, Gökçen H. BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI. DEUFMD. 2002;4:29–40.
MLA Ağpak, Kürşad and Hadi Gökçen. “BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, vol. 4, no. 2, 2002, pp. 29-40.
Vancouver Ağpak K, Gökçen H. BASİT U TİPİ MONTAJ HATTI DENGELEME PROBLEMİNE BULANIK PROGRAMLAMA YAKLAŞIMI. DEUFMD. 2002;4(2):29-40.

Dokuz Eylül Üniversitesi, Mühendislik Fakültesi Dekanlığı Tınaztepe Yerleşkesi, Adatepe Mah. Doğuş Cad. No: 207-I / 35390 Buca-İZMİR.