An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project

Volume: 10 Number: 4 November 1, 2010
  • Gaye Kocabaş
  • Barış Serkan Kopurlu
EN

An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project

Abstract

This paper analyzes the feasibility of Bolu Mountain Tunnel which is one of the most costly highway projects in Turkey. The project continued for about seventeen years and opened to use in 2007. Internal Rate of Return concept is used as a decision rule to asses the net benefit stream of the project. As the tunnel construction had not finished at the deadline planned by the earliest project appraisal, the necessity of tunnel construction became controversial among the society as it requires high investment costs which are withdrawn from other resources of the economy. The analysis is conducted for a 50 year period. According to the results, Bolu Mountain Tunnel project is not economically feasible since the Net Present Value of the project is highly negative at % 12 discount rate level. The NPV and IRR figures are recalculated under different scenarios but even in the best case the figures are negative

Keywords

References

  1. Adler, A. H.(1975) Ulaştirma Projelerinin Ekonomik Değerlendirilmesi Örnek Etüdleri. Translated by Cahit Yalgın. General Directorate of Highways Publications, Ankara.
  2. Anguera, R. (2006) The Channel Tunnel--an ex post economic evalua- tion. Transportation Research Part A: Policy and Practice, Volume 40, Issue 4, 291-315.
  3. Boadway, R. (2006) Principles of cost-benefit analysis. Public Policy Re- view. Vol.2, No.1.
  4. Cakır, T. (1999) Türkiye’de Kamu Ekonomisince Üretilen Karayolları Hizmetlerinde Fayda-Maliyet Analizi Tekniğinin Uygulanabilirliği. Anadolu Üniversitesi Yayınları, Eskişehir.
  5. Adler, M. D. and Posner, A., E. (1999) Rethinking cost-benefit analysis. The Yale Law Journal. No.109.
  6. Ellerman, D. (2004) On a difficulty in welfare economics: numeraire illusion in the Marshall-Pigou-Kaldor-Hicks methodology. University of California at Riverside Working Paper.
  7. Florio, M. and Vignetti, S. (2003) Cost-Benefit Analysis of Infrastruc- ture Projects in an Enlarged European Union: An Incentive-Oriented Approach.
  8. Fosgerau, M. and Pilegaard, N. (2007) Cost-Benefit Rules for Transport Projects When Labor Supply is Endogenous and Taxes are Distortion- ary. MPRA.

Details

Primary Language

English

Subjects

-

Journal Section

-

Authors

Gaye Kocabaş This is me

Barış Serkan Kopurlu This is me

Publication Date

November 1, 2010

Submission Date

November 1, 2010

Acceptance Date

-

Published in Issue

Year 2010 Volume: 10 Number: 4

APA
Kocabaş, G., & Kopurlu, B. S. (2010). An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. Ege Academic Review, 10(4), 1279-1287. https://izlik.org/JA85GR95HC
AMA
1.Kocabaş G, Kopurlu BS. An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. ear. 2010;10(4):1279-1287. https://izlik.org/JA85GR95HC
Chicago
Kocabaş, Gaye, and Barış Serkan Kopurlu. 2010. “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”. Ege Academic Review 10 (4): 1279-87. https://izlik.org/JA85GR95HC.
EndNote
Kocabaş G, Kopurlu BS (November 1, 2010) An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. Ege Academic Review 10 4 1279–1287.
IEEE
[1]G. Kocabaş and B. S. Kopurlu, “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”, ear, vol. 10, no. 4, pp. 1279–1287, Nov. 2010, [Online]. Available: https://izlik.org/JA85GR95HC
ISNAD
Kocabaş, Gaye - Kopurlu, Barış Serkan. “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”. Ege Academic Review 10/4 (November 1, 2010): 1279-1287. https://izlik.org/JA85GR95HC.
JAMA
1.Kocabaş G, Kopurlu BS. An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. ear. 2010;10:1279–1287.
MLA
Kocabaş, Gaye, and Barış Serkan Kopurlu. “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”. Ege Academic Review, vol. 10, no. 4, Nov. 2010, pp. 1279-87, https://izlik.org/JA85GR95HC.
Vancouver
1.Gaye Kocabaş, Barış Serkan Kopurlu. An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. ear [Internet]. 2010 Nov. 1;10(4):1279-87. Available from: https://izlik.org/JA85GR95HC