An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project

Cilt: 10 Sayı: 4 1 Kasım 2010
  • Gaye Kocabaş
  • Barış Serkan Kopurlu
PDF İndir
EN

An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project

Öz

This paper analyzes the feasibility of Bolu Mountain Tunnel which is one of the most costly highway projects in Turkey. The project continued for about seventeen years and opened to use in 2007. Internal Rate of Return concept is used as a decision rule to asses the net benefit stream of the project. As the tunnel construction had not finished at the deadline planned by the earliest project appraisal, the necessity of tunnel construction became controversial among the society as it requires high investment costs which are withdrawn from other resources of the economy. The analysis is conducted for a 50 year period. According to the results, Bolu Mountain Tunnel project is not economically feasible since the Net Present Value of the project is highly negative at % 12 discount rate level. The NPV and IRR figures are recalculated under different scenarios but even in the best case the figures are negative

Anahtar Kelimeler

Kaynakça

  1. Adler, A. H.(1975) Ulaştirma Projelerinin Ekonomik Değerlendirilmesi Örnek Etüdleri. Translated by Cahit Yalgın. General Directorate of Highways Publications, Ankara.
  2. Anguera, R. (2006) The Channel Tunnel--an ex post economic evalua- tion. Transportation Research Part A: Policy and Practice, Volume 40, Issue 4, 291-315.
  3. Boadway, R. (2006) Principles of cost-benefit analysis. Public Policy Re- view. Vol.2, No.1.
  4. Cakır, T. (1999) Türkiye’de Kamu Ekonomisince Üretilen Karayolları Hizmetlerinde Fayda-Maliyet Analizi Tekniğinin Uygulanabilirliği. Anadolu Üniversitesi Yayınları, Eskişehir.
  5. Adler, M. D. and Posner, A., E. (1999) Rethinking cost-benefit analysis. The Yale Law Journal. No.109.
  6. Ellerman, D. (2004) On a difficulty in welfare economics: numeraire illusion in the Marshall-Pigou-Kaldor-Hicks methodology. University of California at Riverside Working Paper.
  7. Florio, M. and Vignetti, S. (2003) Cost-Benefit Analysis of Infrastruc- ture Projects in an Enlarged European Union: An Incentive-Oriented Approach.
  8. Fosgerau, M. and Pilegaard, N. (2007) Cost-Benefit Rules for Transport Projects When Labor Supply is Endogenous and Taxes are Distortion- ary. MPRA.

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

-

Yazarlar

Gaye Kocabaş Bu kişi benim

Barış Serkan Kopurlu Bu kişi benim

Yayımlanma Tarihi

1 Kasım 2010

Gönderilme Tarihi

1 Kasım 2010

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2010 Cilt: 10 Sayı: 4

Kaynak Göster

APA
Kocabaş, G., & Kopurlu, B. S. (2010). An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. Ege Academic Review, 10(4), 1279-1287. https://izlik.org/JA85GR95HC
AMA
1.Kocabaş G, Kopurlu BS. An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. eab. 2010;10(4):1279-1287. https://izlik.org/JA85GR95HC
Chicago
Kocabaş, Gaye, ve Barış Serkan Kopurlu. 2010. “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”. Ege Academic Review 10 (4): 1279-87. https://izlik.org/JA85GR95HC.
EndNote
Kocabaş G, Kopurlu BS (01 Kasım 2010) An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. Ege Academic Review 10 4 1279–1287.
IEEE
[1]G. Kocabaş ve B. S. Kopurlu, “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”, eab, c. 10, sy 4, ss. 1279–1287, Kas. 2010, [çevrimiçi]. Erişim adresi: https://izlik.org/JA85GR95HC
ISNAD
Kocabaş, Gaye - Kopurlu, Barış Serkan. “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”. Ege Academic Review 10/4 (01 Kasım 2010): 1279-1287. https://izlik.org/JA85GR95HC.
JAMA
1.Kocabaş G, Kopurlu BS. An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. eab. 2010;10:1279–1287.
MLA
Kocabaş, Gaye, ve Barış Serkan Kopurlu. “An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project”. Ege Academic Review, c. 10, sy 4, Kasım 2010, ss. 1279-87, https://izlik.org/JA85GR95HC.
Vancouver
1.Gaye Kocabaş, Barış Serkan Kopurlu. An Ex-Post Cost - Benefit Analysis of Bolu Mountain Tunnel Project. eab [Internet]. 01 Kasım 2010;10(4):1279-87. Erişim adresi: https://izlik.org/JA85GR95HC