Risk Management of Software Development Project: An Example of A Bank ATM Project
Abstract
In this study, risk management subject, which is one of important components of project management was studied. Firstly, analyzing, defining, planning and evaluation step of risks and then, observation and control that are necessary for the counterplan in the project management were examined. There is a need of certain decision mechanism and management policies, which are not biased on human in order to achieve these steps. For this purpose, a software development project that is required in the ATM was chosen as example. Determination of risk factors and their preventing policies were illustrated in a bank ATM software example
Keywords
References
- Anantatmula, V. ve Fan, Y. (2013) “Risk Manage- ment Instruments, Strategies and Their Impact on Pro- ject Success” International Journal of Risk and Contingency Management 2(2): 27-41.
- Bannerman, P.L. (2008) “Risk and Risk Management in Software Projects: A Reassessment” Journal of Systems and Software, 81(12):2118–2133.
- Barry, W.B. (1991) “Software Risk Management: Principles And Practices” Software, IEEE , 8(1):32-41.
- Barry W.B. ve DeMarco, T. (1997) “The Atlantic Systems Guild, Software Risk, Management” IEEE Soft- ware, 17-19.
- Ceylan, H. ve Başhelvacı, V.S. (2011) “Risk Değer- lendirme Tablosu Yöntemi ile Risk Analizi: Bir Uygula- ma” International Journal of Engineering Research and De- velopment, 3(2): 25-33.
- Dikmen, I., Birgonul, M.T., Anac, C., Tah, J.H.M. ve Aouad, G. (2008) “Learning From Risks, A Tool For Post-Project Risk Assessment” Automation in Constructi- on, 18(1):42-50.
- Drucker, P.F. (1996) Yönetim Uygulaması, İstanbul, İnkilap Kitabevi.
- Emhan, A. (2009) “Risk Yönetim Süreci Ve Risk Yö- netmekte Kullanılan Teknikler” Atatürk Üniversitesi İkti- sadi ve İdari Bilimler Dergisi, 23(3):209-220.
Details
Primary Language
English
Subjects
-
Journal Section
-
Publication Date
February 1, 2015
Submission Date
February 1, 2015
Acceptance Date
-
Published in Issue
Year 2015 Volume: 15 Number: 1
APA
Yazgan, H. R., & Sönmez, P. (2015). Risk Management of Software Development Project: An Example of A Bank ATM Project. Ege Academic Review, 15(1), 111-126. https://izlik.org/JA59SB88JC
AMA
1.Yazgan HR, Sönmez P. Risk Management of Software Development Project: An Example of A Bank ATM Project. ear. 2015;15(1):111-126. https://izlik.org/JA59SB88JC
Chicago
Yazgan, Harun Reşit, and Pınar Sönmez. 2015. “Risk Management of Software Development Project: An Example of A Bank ATM Project”. Ege Academic Review 15 (1): 111-26. https://izlik.org/JA59SB88JC.
EndNote
Yazgan HR, Sönmez P (February 1, 2015) Risk Management of Software Development Project: An Example of A Bank ATM Project. Ege Academic Review 15 1 111–126.
IEEE
[1]H. R. Yazgan and P. Sönmez, “Risk Management of Software Development Project: An Example of A Bank ATM Project”, ear, vol. 15, no. 1, pp. 111–126, Feb. 2015, [Online]. Available: https://izlik.org/JA59SB88JC
ISNAD
Yazgan, Harun Reşit - Sönmez, Pınar. “Risk Management of Software Development Project: An Example of A Bank ATM Project”. Ege Academic Review 15/1 (February 1, 2015): 111-126. https://izlik.org/JA59SB88JC.
JAMA
1.Yazgan HR, Sönmez P. Risk Management of Software Development Project: An Example of A Bank ATM Project. ear. 2015;15:111–126.
MLA
Yazgan, Harun Reşit, and Pınar Sönmez. “Risk Management of Software Development Project: An Example of A Bank ATM Project”. Ege Academic Review, vol. 15, no. 1, Feb. 2015, pp. 111-26, https://izlik.org/JA59SB88JC.
Vancouver
1.Harun Reşit Yazgan, Pınar Sönmez. Risk Management of Software Development Project: An Example of A Bank ATM Project. ear [Internet]. 2015 Feb. 1;15(1):111-26. Available from: https://izlik.org/JA59SB88JC