Research Article
BibTex RIS Cite
Year 2020, Volume: 3 Issue: 2, 50 - 63, 30.06.2020
https://doi.org/10.35208/ert.723002

Abstract

References

  • Y. Li, “Developing a sustainable construction waste estimation and management system,” PhD Thesis, Hong Kong University of Science and Technology, Hong Kong, April, 2013.
  • C.J. Kibert, Sustainable construction: green building design and delivery. John Wiley & Sons, pp.1-15, 2016.
  • S. Goodhew, Sustainable construction processes: A resource text. John Wiley & Sons, pp.144-173, 2016.
  • European Commission, 2018, “EU Construction and Demolition Waste Protocol and Guidelines,” Available: https://ec.europa.eu/growth/content/euconstruction-and-demolition-waste-protocol0_en, (Accessed 18 March 2020).
  • Eurostat Waste statistics, 2016, Available: https://ec.europa.eu/eurostat/statisticsexplaine d/index.php?title=File:Waste_generation_by_eco nomic_activities_and_households,_EU28,_2016_(%25).png, (accessed 08 May 2020).
  • Ministry of Environment and Urbanization, “National Waste Management and Action Plan 2023,” 2017, Available: https://webdosya.csb.gov.tr/db/cygm/haberler /ulusal_at-k_yonet-m--eylem_plan-- 20180328154824.pdf., (accessed 24 January 2020).
  • Turkish Court of Accounts,“National Regulations and Waste Management in Turkey, Evaluation of Implementation Results Performance Audit Report,” 2007, Available: https://docplayer.biz.tr/29224-T-c-sayistaybaskanligi-turkiye-de-atik-yonetimi-ulusalduzenlemeler-ve-uygulama-sonuclarinindegerlendirilmesi-performans-denetimiraporu.html., (accessed 04 January 2020)
  • T. Esin and N. Cosgun, “A study conducted to reduce construction waste generation in Turkey,” Building and Environment, Vol. 42(4), pp. 1667- 1674, 2007.
  • G. Polat, A. Damci, H. Turkoglu and A.P. Gurgun, “Identification of root causes of construction and demolition (C&D) waste: The case of Turkey,” Procedia Engineering, Vol. 196, pp. 948-955, 2017.
  • H. Arslan, N. Cosgun and B. Salgın, Construction and demolition waste management in Turkey, In Waste Management-An Integrated Vision. IntechOpen, 2012.
  • B. Salgin, “An Examination of the Development of the Construction and Demolition Waste-Related Regulations in Turkey," Periodica Polytechnica Architecture, Vol. 50(2), pp. 169-177, 2019.
  • B. Salgin, G.T. Taygun and A. Balanlı, “The Contribution of Flexible Design in Prevention/Reduction of C&D Waste: An Educational Building Example in Kayseri//Esnek Tasarımın Yapısal Atıkların Önlenmesine/Azaltılmasına Katkısı: Kayseri’de Bir Eğitim Yapısı Örneği,” Megaron, Vol. 13(2), pp. 277-285, 2018.
  • B. Salgin, “Contribution of Dimensional Coordination to Construction,” Waste Reduction Open Access Journal of Waste Management & Xenobiotics, Vol. 2(1), 000114, 2019.
  • B. Salgin and N.Cosgun, “C&D Waste as a Problem in Urban Transformation Projects and Recommendations for Solution: Kayseri as a Case Study,” Omer Halisdemir University Journal of Engineering Sciences, Vol. 7, pp. 465-476, 2018.
  • B. Salgin, N. Cosgun, T. Tikansak Karadayi and C. Aydin Ipekci, “Investigation of Architects’ Views on Construction Waste Generation on Construction Sites in Turkey,” Digital Proceeding of 3. International Conference on Civil and Environmental Engineering, Cesme, Turkey, 24- 27 April, 2018.
  • N. Cosgun and T. Esin, “Türkiye’de Yapısal Atık Yönetim(sizlik) Sorunları” (C&D Waste Management Problems in Turkey),” Türkiye’de Çevre Kirlenmeleri Sempozyumu, Kocaeli, Turkey, pp. 19–24, 2006.
  • European Parliament and Council., “Directive 2008/98/EC of the European Parliament and of the Council of 19 November 2008 on waste and repealing certain directives,” Official Journal of European Union, L312, pp. 3–30, 2008.
  • N. Chang and A. Pires, Sustainable solid waste management: A systems engineering approach. Hoboken, New Jersey: John Wiley & Sons, Inc, 2015.
  • USEPA,“Construction Waste Management Section 017419,” 2007 Available: https://www.epa.gov/sites/production/files/20 14-03/documents/017419.pdf, (accessed 29 October 2018).
  • Commission of the European Communities, “Commission Decision 2000/532/EC of 3 May 2000 replacing Decision 94/3/EC establishing a list of wastes pursuant to Article 1 (a) of Council Directive 75/442/EEC on waste and Council Decision 94/904/EC establishing a list of hazardous waste pursuant to Article 1 (4) of Council Directive 91/689/EEC on hazardous waste,” Official Journal, Vol. 50, pp.3, 2000.
  • C.S. Poon, T.W. Ann and L.H. Ng, “On-site sorting of construction and demolition waste in Hong Kong,” Resources, conservation and recycling, Vol. 32 (2), pp. 157-172, 2001.
  • J. Pichtel, Waste management practices: Municipal, hazardous, and industrial. CRC press, 2005.
  • Franklin Associates-EPA, “Characterization of Building-Related Construction and Demolition Debris in the United States, Prepared for the U.S. Environmental Protection Agency,” EPA530-R98-010, Prairie Village, KS, 1998.
  • R.M. Gavilan and L.E. Bernold, “Source evaluation of solid waste in building construction,” Journal of construction engineering and management, Vol. 120(3), pp. 536-552, 1994.
  • B.A.G. Bossink and H. J. H. Brouwers, “Construction waste: quantification and source evaluation,” Journal of construction engineering and management, Vol. 122(1), pp. 55-60, 1996.
  • BRE, Wastage Rate Report, 2008, Available: https://www.wrap.org.uk/sites/files/wrap/Wa stageratesreport.pdf, (Accessed 15 March 2020).
  • Christensen, T.H. (Ed.), Solid waste technology and management (Vol. 2). Chichester, West Sussex, UK: Wiley, 2011.
  • A. Pires, G. Martinho and N.B. Chang, “Solid waste management in European countries: A review of systems analysis techniques,” Journal of environmental management, Vol. 92(4), pp. 1033- 1050, 2011.
  • B. Mcdonald and M. Smithers, “Implementing a waste management plan during the construction phase of a project: a case study,” Construction Management Economics, Vol. 16(1), pp. 71-78, 1998.
  • O.O. Faniran and G. Caban, “Minimizing waste on construction project sites,” Engineering, construction and architectural management, Vol. 5(2), pp. 182-188, 1998.
  • C.S. Poon, A.T.W. Yu, S.W. Wong and E. Cheung, “Management of construction waste in public housing projects in Hong Kong,” Construction Management & Economics, Vol. 22(7), pp. 675- 689, 2004.
  • C.S. Poon, A.T.W. Yu, S.C. See and E. Cheung, “Minimizing demolition wastes in Hong Kong public housing projects,” Construction Management and Economics, Vol. 2(8), pp. 799- 805, 2004.
  • C.S. Poon, A.T. Yu and L. Jaillon, “Reducing building waste at construction sites in Hong Kong,” Construction Management and Economics, Vol. 22(5), pp. 461-470, 2004.
  • N. Kartam, N. Al-Mutairi, I. Al-Ghusain and J. AlHumoud, “Environmental management of construction and demolition waste in Kuwait,” Waste Management, Vol. 24 (10), pp. 1049-1059, 2004.
  • L.Y. Shen, V.W. Tam, C.M. Tam and D. Drew, “Mapping approach for examining waste management on construction sites,” Journal of Construction Engineering and Management, Vol. 130(4), pp. 472-481, 2004.
  • V.W. Tam and C.M. Tam, “Evaluations of existing waste recycling methods: a Hong Kong study,”Building and Environment, Vol. 41(12), pp. 1649-1660, 2005.
  • R.A. Begum, C. Siwar, J.J. Pereira and A.H. Jaafar, “A benefit–cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia,” Resources, Conservation and Recycling, Vol. 48(1), pp. 86-98, 2006.
  • Osmani, M., Glass, J., Price, A., “Architect and contractor attitudes to waste minimisation”, In Proceedings of the Institution of Civil EngineersWaste and Resource Management, Vol. 159(2), pp. 65-72., 2006
  • V.W. Tam and C.M. Tam, “A review on the viable technology for construction waste recycling,” Resources, Conservation and Recycling, Vol. 47(3), pp. 209-221, 2006.
  • V.W. Tam, “Economic comparison of concrete recycling: A case study approach,” Resources, Conservation and Recycling, Vol. 52(5), pp. 821- 828, 2008.
  • M. Osmani, J. Glass and A.D. Price, “Architects’ perspectives on construction waste reduction by design,” Waste Management, Vol. 28(7), pp. 1147- 1158, 2008.
  • V.W. Tam, “On the effectiveness in implementing a waste-management-plan method in construction,” Waste Management, Vol. 28(6), pp. 1072-1080, 2008.
  • L. Jaillon, C. S. Poon and Y.H. Chiang, “Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong,” Waste Management, Vol. 29(1), pp. 309- 320, 2009.
  • J. Wang, H. Yuan, X. Kang and W. Lu, “Critical success factors for on-site sorting of construction waste: a China study,” Resources, Conservation and Recycling, Vol. 54(11), pp. 931-936, 2010.
  • W. Lu and H. Yuan, “Exploring critical success factors for waste management in construction projects of China,” Resources, Conservation and Recycling, Vol. 55(2), pp. 201-208, 2010.
  • H. Yuan, “A SWOT analysis of successful construction waste management,” Journal of Cleaner Production, Vol. 39, pp. 1-8, 2013.
  • H. Yuan, “Key indicators for assessing the effectiveness of waste management in construction projects,” Ecological Indicators, Vol. 24, pp. 476-484, 2013.
  • H. Yuan, W. Lu and J.J. Hao, “The evolution of construction waste sorting on-site,” Renewable and Sustainable Energy Reviews, Vol. 20, pp. 483- 490, 2013.
  • J. Li, Z. Ding, X. Mi and J. Wang, “A model for estimating construction waste generation index for building project in China,” Resources, Conservation and Recycling, Vol. 74, pp. 20-26, 2013.
  • P.V. Saez, M. del Río Merino, A.S.A. González and C. Porras-Amores, “Best practice measures assessment for construction and demolition waste management in building constructions,” Resources, Conservation and Recycling, Vol. 75, pp. 52-62., 2013.
  • J. Wang, Z. Li and V.W. Tam, “Critical factors in effective construction waste minimization at the design stage: a Shenzhen case study, China,” Resources, Conservation and Recycling, Vol. 82, pp. 1-7, 2014.
  • M. Gangolells, M. Casals, N. Forcada and M. Macarulla, “Analysis of the implementation of effective waste management practices in construction projects and sites,” Resources, Conservation and Recycling, Vol. 93, pp. 99-111., 2014.
  • A. Bakshan, I. Srour, G. Chehab and M. El-Fadel,“A field based methodology for estimating waste generation rates at various stages of construction projects,” Resources, Conservation and Recycling, Vol. 100, pp. 70-80, 2015.
  • S.O. Ajayi, L.O. Oyedele, M. Bilal, O.O. Akinade, H.A. Alaka and H.A. Owolabi, “Critical management practices influencing on-site waste minimization in construction projects,” Waste Management, Vol. 59, pp. 330-339, 2016.
  • Z. Ding, G. Yi, V.W. Tam and T. Huang, “A system dynamics-based environmental performance simulation of construction waste reduction management in China,” Waste Management, Vol. 51, pp. 130-141, 2016.
  • J. Li, J. Zuo, H. Cai and G. Zillante, “Construction waste reduction behaviour of contractor employees: An extended theory of planned behaviour model approach,” Journal of Cleaner Production, Vol. 172, pp. 1399-1408, 2017.
  • Z. Ding, M. Zhu, V.W. Tam, G. Yi and C.N. Tran, “A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages,” Journal of Cleaner Production, Vol. 176, pp. 676-692, 2017.
  • C.L. Peng, D.E. Scorpio and C.J. Kibert, “Strategies for successful construction and demolition waste recycling operations,” Construction Management & Economics, Vol. 15(1), pp. 49-58, 1997.
  • https://www.epa.gov/, EPA website. [Online]. Available: (2020).
  • M. Marzouk and S. Azab, “Environmental and economic impact assessment of construction and demolition waste disposal using system dynamics,” Resources, Conservation and Recycling, Vol. 82, pp. 41-49, 2014.
  • R.K. Yin, Case study research and applications: Design and methods. Sage publishing. pp. 36, 2018.
  • M.B. Miles, A.M. Huberman, M.A. Huberman and M. Huberman, Qualitative data analysis: An expanded sourcebook. Sage Publishing. pp. 72, 1994.
  • M.D. Gall, W.R. Borg and J.P. Gall, Educational research: An introduction. Longman Publishing, pp. 242, 1996.
  • J. Mason, Qualitative researching. Sage Publishing, pp. 124-142., 2002.
  • B.G. Glaser and A.L. Strauss, The discovery of grounded theory: Strategies for qualitative research. Chicago: Aldire, pp. 61, 1967.
  • R.E. Stake, Multiple case study analysis. Guilford Press, pp. 22. 2013.
  • G. Guest, A. Bunce and L. Johnson, “How many interviews are enough? An experiment with data saturation and variability,” Field Methods, Vol. 18 (1), pp. 59-82, 2006.
  • J.W. Creswell, Educational research: Planning, conducting, and evaluating qualitative and qualitative research, pp. 231. 2014.
  • G. Guest, K.M. MacQueen and E.E. Namey, Applied Thematic Analysis. Sage Publishing, pp. 11, 2012.
  • M.I. Alhojailan, “Thematic analysis: A critical review of its process and evaluation,” West East Journal of Social Sciences, Vol. 1(1), pp. 39-47, 2012.
  • V. Braun, V. Clarke, “Using thematic analysis in psychology,” Qualitative Research in Psychology, Vol. 3(2), pp. 77-101, 2006.
  • D.R. Hancock and B. Algozzine, Doing case study research: A practical guide for beginning researchers. Columbia University, NY: Teachers College, 2006.

Construction waste management practices on-sites: A case study of Istanbul city

Year 2020, Volume: 3 Issue: 2, 50 - 63, 30.06.2020
https://doi.org/10.35208/ert.723002

Abstract

Increasing construction activities put enormous stress on waste generation in Turkey. Therefore, to manage all these construction wastes by setting effective waste management strategies becomes more significant day by day. Although there is a rising interest in waste management issues, there are not enough studies in Turkey. The lack of data is a prominent obstacle for the researchers. Addressing this research gap, an explanatory multiple-case study was conducted to reveal the waste management practices (waste generation, collection-sorting, storage-disposal, and recovery) on-sites. Unstructured interviews were conducted with different 13 experts working at different construction sites in Istanbul. According to the qualitative study results, there is usually no waste management plan on-sites. Project revisions and cutting of materials for sizing, storage problems are the most emphasized causes of waste on-sites. Wastes are mostly collected and disposed of by the contractors and there is a tendency to collect wastes in mixed on-site and later partly sort. Collection-sorting and storage-disposal practices on-sites are affected by the quantity of waste, site facilities, storage opportunities, scale of the contractor and economic value of waste. The recovery facilities are mostly depending on the economic gain to be obtained from waste. In this context, the recycling and reusing of steel waste is given the best importance. There are not enough networks for recovery of cardboard/paper-plastic wastes on-sites. There is no illegal dumping among the cases included in this study. However, awareness on special treatment of hazardous wastes has not yet been developed enough on-sites in Turkey.

References

  • Y. Li, “Developing a sustainable construction waste estimation and management system,” PhD Thesis, Hong Kong University of Science and Technology, Hong Kong, April, 2013.
  • C.J. Kibert, Sustainable construction: green building design and delivery. John Wiley & Sons, pp.1-15, 2016.
  • S. Goodhew, Sustainable construction processes: A resource text. John Wiley & Sons, pp.144-173, 2016.
  • European Commission, 2018, “EU Construction and Demolition Waste Protocol and Guidelines,” Available: https://ec.europa.eu/growth/content/euconstruction-and-demolition-waste-protocol0_en, (Accessed 18 March 2020).
  • Eurostat Waste statistics, 2016, Available: https://ec.europa.eu/eurostat/statisticsexplaine d/index.php?title=File:Waste_generation_by_eco nomic_activities_and_households,_EU28,_2016_(%25).png, (accessed 08 May 2020).
  • Ministry of Environment and Urbanization, “National Waste Management and Action Plan 2023,” 2017, Available: https://webdosya.csb.gov.tr/db/cygm/haberler /ulusal_at-k_yonet-m--eylem_plan-- 20180328154824.pdf., (accessed 24 January 2020).
  • Turkish Court of Accounts,“National Regulations and Waste Management in Turkey, Evaluation of Implementation Results Performance Audit Report,” 2007, Available: https://docplayer.biz.tr/29224-T-c-sayistaybaskanligi-turkiye-de-atik-yonetimi-ulusalduzenlemeler-ve-uygulama-sonuclarinindegerlendirilmesi-performans-denetimiraporu.html., (accessed 04 January 2020)
  • T. Esin and N. Cosgun, “A study conducted to reduce construction waste generation in Turkey,” Building and Environment, Vol. 42(4), pp. 1667- 1674, 2007.
  • G. Polat, A. Damci, H. Turkoglu and A.P. Gurgun, “Identification of root causes of construction and demolition (C&D) waste: The case of Turkey,” Procedia Engineering, Vol. 196, pp. 948-955, 2017.
  • H. Arslan, N. Cosgun and B. Salgın, Construction and demolition waste management in Turkey, In Waste Management-An Integrated Vision. IntechOpen, 2012.
  • B. Salgin, “An Examination of the Development of the Construction and Demolition Waste-Related Regulations in Turkey," Periodica Polytechnica Architecture, Vol. 50(2), pp. 169-177, 2019.
  • B. Salgin, G.T. Taygun and A. Balanlı, “The Contribution of Flexible Design in Prevention/Reduction of C&D Waste: An Educational Building Example in Kayseri//Esnek Tasarımın Yapısal Atıkların Önlenmesine/Azaltılmasına Katkısı: Kayseri’de Bir Eğitim Yapısı Örneği,” Megaron, Vol. 13(2), pp. 277-285, 2018.
  • B. Salgin, “Contribution of Dimensional Coordination to Construction,” Waste Reduction Open Access Journal of Waste Management & Xenobiotics, Vol. 2(1), 000114, 2019.
  • B. Salgin and N.Cosgun, “C&D Waste as a Problem in Urban Transformation Projects and Recommendations for Solution: Kayseri as a Case Study,” Omer Halisdemir University Journal of Engineering Sciences, Vol. 7, pp. 465-476, 2018.
  • B. Salgin, N. Cosgun, T. Tikansak Karadayi and C. Aydin Ipekci, “Investigation of Architects’ Views on Construction Waste Generation on Construction Sites in Turkey,” Digital Proceeding of 3. International Conference on Civil and Environmental Engineering, Cesme, Turkey, 24- 27 April, 2018.
  • N. Cosgun and T. Esin, “Türkiye’de Yapısal Atık Yönetim(sizlik) Sorunları” (C&D Waste Management Problems in Turkey),” Türkiye’de Çevre Kirlenmeleri Sempozyumu, Kocaeli, Turkey, pp. 19–24, 2006.
  • European Parliament and Council., “Directive 2008/98/EC of the European Parliament and of the Council of 19 November 2008 on waste and repealing certain directives,” Official Journal of European Union, L312, pp. 3–30, 2008.
  • N. Chang and A. Pires, Sustainable solid waste management: A systems engineering approach. Hoboken, New Jersey: John Wiley & Sons, Inc, 2015.
  • USEPA,“Construction Waste Management Section 017419,” 2007 Available: https://www.epa.gov/sites/production/files/20 14-03/documents/017419.pdf, (accessed 29 October 2018).
  • Commission of the European Communities, “Commission Decision 2000/532/EC of 3 May 2000 replacing Decision 94/3/EC establishing a list of wastes pursuant to Article 1 (a) of Council Directive 75/442/EEC on waste and Council Decision 94/904/EC establishing a list of hazardous waste pursuant to Article 1 (4) of Council Directive 91/689/EEC on hazardous waste,” Official Journal, Vol. 50, pp.3, 2000.
  • C.S. Poon, T.W. Ann and L.H. Ng, “On-site sorting of construction and demolition waste in Hong Kong,” Resources, conservation and recycling, Vol. 32 (2), pp. 157-172, 2001.
  • J. Pichtel, Waste management practices: Municipal, hazardous, and industrial. CRC press, 2005.
  • Franklin Associates-EPA, “Characterization of Building-Related Construction and Demolition Debris in the United States, Prepared for the U.S. Environmental Protection Agency,” EPA530-R98-010, Prairie Village, KS, 1998.
  • R.M. Gavilan and L.E. Bernold, “Source evaluation of solid waste in building construction,” Journal of construction engineering and management, Vol. 120(3), pp. 536-552, 1994.
  • B.A.G. Bossink and H. J. H. Brouwers, “Construction waste: quantification and source evaluation,” Journal of construction engineering and management, Vol. 122(1), pp. 55-60, 1996.
  • BRE, Wastage Rate Report, 2008, Available: https://www.wrap.org.uk/sites/files/wrap/Wa stageratesreport.pdf, (Accessed 15 March 2020).
  • Christensen, T.H. (Ed.), Solid waste technology and management (Vol. 2). Chichester, West Sussex, UK: Wiley, 2011.
  • A. Pires, G. Martinho and N.B. Chang, “Solid waste management in European countries: A review of systems analysis techniques,” Journal of environmental management, Vol. 92(4), pp. 1033- 1050, 2011.
  • B. Mcdonald and M. Smithers, “Implementing a waste management plan during the construction phase of a project: a case study,” Construction Management Economics, Vol. 16(1), pp. 71-78, 1998.
  • O.O. Faniran and G. Caban, “Minimizing waste on construction project sites,” Engineering, construction and architectural management, Vol. 5(2), pp. 182-188, 1998.
  • C.S. Poon, A.T.W. Yu, S.W. Wong and E. Cheung, “Management of construction waste in public housing projects in Hong Kong,” Construction Management & Economics, Vol. 22(7), pp. 675- 689, 2004.
  • C.S. Poon, A.T.W. Yu, S.C. See and E. Cheung, “Minimizing demolition wastes in Hong Kong public housing projects,” Construction Management and Economics, Vol. 2(8), pp. 799- 805, 2004.
  • C.S. Poon, A.T. Yu and L. Jaillon, “Reducing building waste at construction sites in Hong Kong,” Construction Management and Economics, Vol. 22(5), pp. 461-470, 2004.
  • N. Kartam, N. Al-Mutairi, I. Al-Ghusain and J. AlHumoud, “Environmental management of construction and demolition waste in Kuwait,” Waste Management, Vol. 24 (10), pp. 1049-1059, 2004.
  • L.Y. Shen, V.W. Tam, C.M. Tam and D. Drew, “Mapping approach for examining waste management on construction sites,” Journal of Construction Engineering and Management, Vol. 130(4), pp. 472-481, 2004.
  • V.W. Tam and C.M. Tam, “Evaluations of existing waste recycling methods: a Hong Kong study,”Building and Environment, Vol. 41(12), pp. 1649-1660, 2005.
  • R.A. Begum, C. Siwar, J.J. Pereira and A.H. Jaafar, “A benefit–cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia,” Resources, Conservation and Recycling, Vol. 48(1), pp. 86-98, 2006.
  • Osmani, M., Glass, J., Price, A., “Architect and contractor attitudes to waste minimisation”, In Proceedings of the Institution of Civil EngineersWaste and Resource Management, Vol. 159(2), pp. 65-72., 2006
  • V.W. Tam and C.M. Tam, “A review on the viable technology for construction waste recycling,” Resources, Conservation and Recycling, Vol. 47(3), pp. 209-221, 2006.
  • V.W. Tam, “Economic comparison of concrete recycling: A case study approach,” Resources, Conservation and Recycling, Vol. 52(5), pp. 821- 828, 2008.
  • M. Osmani, J. Glass and A.D. Price, “Architects’ perspectives on construction waste reduction by design,” Waste Management, Vol. 28(7), pp. 1147- 1158, 2008.
  • V.W. Tam, “On the effectiveness in implementing a waste-management-plan method in construction,” Waste Management, Vol. 28(6), pp. 1072-1080, 2008.
  • L. Jaillon, C. S. Poon and Y.H. Chiang, “Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong,” Waste Management, Vol. 29(1), pp. 309- 320, 2009.
  • J. Wang, H. Yuan, X. Kang and W. Lu, “Critical success factors for on-site sorting of construction waste: a China study,” Resources, Conservation and Recycling, Vol. 54(11), pp. 931-936, 2010.
  • W. Lu and H. Yuan, “Exploring critical success factors for waste management in construction projects of China,” Resources, Conservation and Recycling, Vol. 55(2), pp. 201-208, 2010.
  • H. Yuan, “A SWOT analysis of successful construction waste management,” Journal of Cleaner Production, Vol. 39, pp. 1-8, 2013.
  • H. Yuan, “Key indicators for assessing the effectiveness of waste management in construction projects,” Ecological Indicators, Vol. 24, pp. 476-484, 2013.
  • H. Yuan, W. Lu and J.J. Hao, “The evolution of construction waste sorting on-site,” Renewable and Sustainable Energy Reviews, Vol. 20, pp. 483- 490, 2013.
  • J. Li, Z. Ding, X. Mi and J. Wang, “A model for estimating construction waste generation index for building project in China,” Resources, Conservation and Recycling, Vol. 74, pp. 20-26, 2013.
  • P.V. Saez, M. del Río Merino, A.S.A. González and C. Porras-Amores, “Best practice measures assessment for construction and demolition waste management in building constructions,” Resources, Conservation and Recycling, Vol. 75, pp. 52-62., 2013.
  • J. Wang, Z. Li and V.W. Tam, “Critical factors in effective construction waste minimization at the design stage: a Shenzhen case study, China,” Resources, Conservation and Recycling, Vol. 82, pp. 1-7, 2014.
  • M. Gangolells, M. Casals, N. Forcada and M. Macarulla, “Analysis of the implementation of effective waste management practices in construction projects and sites,” Resources, Conservation and Recycling, Vol. 93, pp. 99-111., 2014.
  • A. Bakshan, I. Srour, G. Chehab and M. El-Fadel,“A field based methodology for estimating waste generation rates at various stages of construction projects,” Resources, Conservation and Recycling, Vol. 100, pp. 70-80, 2015.
  • S.O. Ajayi, L.O. Oyedele, M. Bilal, O.O. Akinade, H.A. Alaka and H.A. Owolabi, “Critical management practices influencing on-site waste minimization in construction projects,” Waste Management, Vol. 59, pp. 330-339, 2016.
  • Z. Ding, G. Yi, V.W. Tam and T. Huang, “A system dynamics-based environmental performance simulation of construction waste reduction management in China,” Waste Management, Vol. 51, pp. 130-141, 2016.
  • J. Li, J. Zuo, H. Cai and G. Zillante, “Construction waste reduction behaviour of contractor employees: An extended theory of planned behaviour model approach,” Journal of Cleaner Production, Vol. 172, pp. 1399-1408, 2017.
  • Z. Ding, M. Zhu, V.W. Tam, G. Yi and C.N. Tran, “A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages,” Journal of Cleaner Production, Vol. 176, pp. 676-692, 2017.
  • C.L. Peng, D.E. Scorpio and C.J. Kibert, “Strategies for successful construction and demolition waste recycling operations,” Construction Management & Economics, Vol. 15(1), pp. 49-58, 1997.
  • https://www.epa.gov/, EPA website. [Online]. Available: (2020).
  • M. Marzouk and S. Azab, “Environmental and economic impact assessment of construction and demolition waste disposal using system dynamics,” Resources, Conservation and Recycling, Vol. 82, pp. 41-49, 2014.
  • R.K. Yin, Case study research and applications: Design and methods. Sage publishing. pp. 36, 2018.
  • M.B. Miles, A.M. Huberman, M.A. Huberman and M. Huberman, Qualitative data analysis: An expanded sourcebook. Sage Publishing. pp. 72, 1994.
  • M.D. Gall, W.R. Borg and J.P. Gall, Educational research: An introduction. Longman Publishing, pp. 242, 1996.
  • J. Mason, Qualitative researching. Sage Publishing, pp. 124-142., 2002.
  • B.G. Glaser and A.L. Strauss, The discovery of grounded theory: Strategies for qualitative research. Chicago: Aldire, pp. 61, 1967.
  • R.E. Stake, Multiple case study analysis. Guilford Press, pp. 22. 2013.
  • G. Guest, A. Bunce and L. Johnson, “How many interviews are enough? An experiment with data saturation and variability,” Field Methods, Vol. 18 (1), pp. 59-82, 2006.
  • J.W. Creswell, Educational research: Planning, conducting, and evaluating qualitative and qualitative research, pp. 231. 2014.
  • G. Guest, K.M. MacQueen and E.E. Namey, Applied Thematic Analysis. Sage Publishing, pp. 11, 2012.
  • M.I. Alhojailan, “Thematic analysis: A critical review of its process and evaluation,” West East Journal of Social Sciences, Vol. 1(1), pp. 39-47, 2012.
  • V. Braun, V. Clarke, “Using thematic analysis in psychology,” Qualitative Research in Psychology, Vol. 3(2), pp. 77-101, 2006.
  • D.R. Hancock and B. Algozzine, Doing case study research: A practical guide for beginning researchers. Columbia University, NY: Teachers College, 2006.
There are 72 citations in total.

Details

Primary Language English
Subjects Environmental Engineering
Journal Section Research Articles
Authors

Havva Aksel 0000-0003-4253-2550

İkbal Cetıner 0000-0001-5034-7895

Publication Date June 30, 2020
Submission Date April 19, 2020
Acceptance Date May 24, 2020
Published in Issue Year 2020 Volume: 3 Issue: 2

Cite

APA Aksel, H., & Cetıner, İ. (2020). Construction waste management practices on-sites: A case study of Istanbul city. Environmental Research and Technology, 3(2), 50-63. https://doi.org/10.35208/ert.723002
AMA Aksel H, Cetıner İ. Construction waste management practices on-sites: A case study of Istanbul city. ERT. June 2020;3(2):50-63. doi:10.35208/ert.723002
Chicago Aksel, Havva, and İkbal Cetıner. “Construction Waste Management Practices on-Sites: A Case Study of Istanbul City”. Environmental Research and Technology 3, no. 2 (June 2020): 50-63. https://doi.org/10.35208/ert.723002.
EndNote Aksel H, Cetıner İ (June 1, 2020) Construction waste management practices on-sites: A case study of Istanbul city. Environmental Research and Technology 3 2 50–63.
IEEE H. Aksel and İ. Cetıner, “Construction waste management practices on-sites: A case study of Istanbul city”, ERT, vol. 3, no. 2, pp. 50–63, 2020, doi: 10.35208/ert.723002.
ISNAD Aksel, Havva - Cetıner, İkbal. “Construction Waste Management Practices on-Sites: A Case Study of Istanbul City”. Environmental Research and Technology 3/2 (June 2020), 50-63. https://doi.org/10.35208/ert.723002.
JAMA Aksel H, Cetıner İ. Construction waste management practices on-sites: A case study of Istanbul city. ERT. 2020;3:50–63.
MLA Aksel, Havva and İkbal Cetıner. “Construction Waste Management Practices on-Sites: A Case Study of Istanbul City”. Environmental Research and Technology, vol. 3, no. 2, 2020, pp. 50-63, doi:10.35208/ert.723002.
Vancouver Aksel H, Cetıner İ. Construction waste management practices on-sites: A case study of Istanbul city. ERT. 2020;3(2):50-63.