Research Article

Applying Hybrid Machine Learning for Construction Material Price Prediction and Procurement Cost Optimization

Volume: 5 Number: 1 December 31, 2025
EN

Applying Hybrid Machine Learning for Construction Material Price Prediction and Procurement Cost Optimization

Abstract

Construction material cost is the major component of construction project costs. Among the material cost categories, construction material price fluctuation is the major risk that causes construction cost estimation to be different from actual cost in many countries. In addition, unable to consider the construction material price in construction material procurement cost optimization is uneconomical because may lead to the material being ordered at a period when the price is high. Therefore, a two-staged method for construction material price prediction and a strategic economical construction procurement method is proposed. In the first stage, the Multilayer Perceptron (MLP) is used to predict construction material prices. Then in the second stage, the predicted price of the MLP model was taken as input along with procurement data for the Deep Q Network (DQN) to identify ordering time and quantity at a minimum cost. The application of the proposed method in the Ethiopian construction industry shows that MLP has better performance in predicting cement prices than linear regression. Besides, the DQN algorithm procurement strategy for the nonpolynomial hard problem is < 1% in cost performance than the exact mixed integer linear programming (MILP) method with reasonable solution time. The proposed hybrid model can help construction practitioners to make material-related data-driven decisions.

Keywords

References

  1. Bakhshi, P., & Touran, A. (2014). An overview of budget contingency calculation methods in construction industry. Procedia Engineering, 85, 52–60. https://doi.org/10.1016/j.proeng.2014.10.528.
  2. Adaurhere, R. E., Musonda, I., & Okoro, C. S. (2019). Construction contingency determination: A review of processes and techniques. Construction in the 21st Century Conference, April 2022, 11. https://doi.org/10.1007/978-3-030-48465-1
  3. Georgy.M and Basily.S. Y. (2008). Using genetic algorithms in optimizing construction material delivery schedules. Constr. Innov., vol. 8, no. 1, pp. 23–45, 2.doi: 10.1108/14714170810846503.
  4. Kumar, D. R. (2016). Economic Order Quantity (EOQ). Global Journal of Finance and Economic Management, 5(1), 1–5. https://doi.org/10.4135/9781412950602.n225
  5. Fentahun, K. Y. (2020). Determinants of Infrastructure Project Delays and Cost Escalations: The Cases of Federal Road and Railway Construction Projects in Ethiopia. Technology, and Sciences (ASRJETS) American Scientific Research Journal for Engineering, 63(1), 102–136. http://asrjetsjournal.org/
  6. Bahamid, R. A., Doh, S. I., & Al-Sharaf, M. A. (2019). Risk factors affecting the construction projects in the developing countries. IOP Conference Series: Earth and Environmental Science, 244(1), 1–4. https://doi.org/10.1088/1755-1315/244/1/012040
  7. Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). Analysing delay causes and effects in Ghanaian state housing construction projects. International Journal of Managing Projects in Business, 8(1), 198–214. www.emeraldinsight.com/1753-8378.htm%0AIJMPB
  8. Tang, B. qiu, Han, J., Guo, G. feng, Chen, Y., & Zhang, S. (2019). Building material prices forecasting based on least square support vector machine and improved particle swarm optimization. Architectural Engineering and Design Management, 15(3), 196–212. https://doi.org/10.1080/17452007.2018.155657

Details

Primary Language

English

Subjects

Decision Support and Group Support Systems

Journal Section

Research Article

Early Pub Date

June 6, 2025

Publication Date

December 31, 2025

Submission Date

March 5, 2025

Acceptance Date

May 31, 2025

Published in Issue

Year 2025 Volume: 5 Number: 1

APA
Gebregiorgis Atnafie, T. (2025). Applying Hybrid Machine Learning for Construction Material Price Prediction and Procurement Cost Optimization. Journal of Emerging Computer Technologies, 5(1), 47-56. https://doi.org/10.57020/ject.1651986
Journal of Emerging Computer Technologies
is indexed and abstracted by
Harvard Hollis, Scilit, ROAD, Google Scholar, OpenAIRE

Publisher
Izmir Academy Association

88x31.png